Filter interviews by
I applied via Company Website
posted on 6 Oct 2021
I applied via Naukri.com and was interviewed in Apr 2021. There were 4 interview rounds.
I applied via Naukri.com and was interviewed before Sep 2020. There was 1 interview round.
Hydrotest procedure is a process of testing the strength and integrity of a pressure vessel or pipeline by filling it with water and pressurizing it.
The vessel or pipeline is filled with water and pressurized to a specified level
The pressure is held for a specified amount of time to check for leaks or deformations
The test is usually performed before commissioning or after repairs
The test pressure and duration are deter...
HDD procedure refers to the process of installing and configuring a hard disk drive in a computer system.
Ensure the HDD is compatible with the computer system
Physically install the HDD in the appropriate bay
Connect the necessary cables to the HDD and motherboard
Configure the HDD in the BIOS settings
Format the HDD and install the operating system
Test the HDD for proper functionality
I applied via Approached by Company and was interviewed before Jun 2021. There were 2 interview rounds.
posted on 30 May 2022
I applied via Referral and was interviewed in Nov 2021. There were 2 interview rounds.
The safety person's roles and responsibilities as per the BOCW act include ensuring safety measures are in place, conducting safety inspections, and providing safety training.
Ensuring safety measures are in place at the worksite
Conducting safety inspections to identify potential hazards
Providing safety training to workers and management
Maintaining records of safety inspections and incidents
Ensuring compliance with safe...
I applied via LinkedIn and was interviewed in May 2022. There were 3 interview rounds.
I applied via Approached by Company and was interviewed before May 2022. There were 2 interview rounds.
I have worked on INDAS 115 and INDAS 116 in my previous role as a financial analyst.
Implemented INDAS 115 to recognize revenue from contracts with customers
Applied INDAS 116 to account for leases in financial statements
Ensured compliance with INDAS standards in financial reporting
Prepared financial statements following the guidelines of INDAS
I applied via Walk-in and was interviewed before Dec 2020. There were 5 interview rounds.
The neutral axis is the line where the stress is zero in a reinforced concrete structure.
The neutral axis divides the cross-section of the structure into two parts: the compression zone and the tension zone.
The depth of the neutral axis depends on the moment of resistance of the section and the bending moment applied.
The position of the neutral axis affects the amount of reinforcement required in the tension zone.
The n...
System implementation process involves planning, designing, testing, and deploying new software or hardware systems.
Planning phase involves defining project scope, setting goals, and creating a timeline.
Design phase includes creating system architecture, database design, and user interface.
Testing phase involves conducting various tests to ensure system functionality and performance.
Deployment phase includes installing...
Monitoring performance involves setting clear expectations, providing feedback, tracking progress, and addressing any issues that arise.
Set clear performance expectations for team members
Provide regular feedback on performance
Track progress towards goals and objectives
Address any performance issues promptly and constructively
posted on 13 Mar 2024
I applied via LinkedIn and was interviewed before Mar 2023. There were 2 interview rounds.
The planning process involves setting goals, identifying resources, creating a timeline, and evaluating progress.
Setting clear and achievable goals
Identifying resources needed
Creating a timeline for tasks and deadlines
Evaluating progress and making adjustments as needed
HSE Officer
5
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Quantity Surveyor
3
salaries
| ₹0 L/yr - ₹0 L/yr |
QA QC Engineer
3
salaries
| ₹0 L/yr - ₹0 L/yr |
HSE Engineer
3
salaries
| ₹0 L/yr - ₹0 L/yr |
L&T Construction
Tata Projects
Shapoorji Pallonji Group
Hindustan Construction Company