Filter interviews by
I applied via Referral and was interviewed in Aug 2021. There was 1 interview round.
Star delta starter is a type of motor starter used to reduce the starting current of a motor.
Consists of three contactors and a timer
Initially, the motor is connected in star configuration to reduce the starting current
After a set time, the motor is switched to delta configuration for normal operation
Used for high power motors
Reduces voltage drop and prevents damage to the motor
Star delta starter circuit is used to reduce the starting current of induction motors.
The circuit consists of three contactors, a timer, and an overload relay.
During starting, the motor is connected in star configuration to reduce the starting current.
After a set time, the motor is switched to delta configuration for normal operation.
The overload relay protects the motor from excessive current.
Example: A 3-phase induct...
Top trending discussions
posted on 11 Apr 2021
I applied via Walk-in and was interviewed before Apr 2020. There was 1 interview round.
Manpower mobilization refers to the process of deploying and managing personnel for a specific project or task.
Identifying the required personnel for a project
Recruiting and hiring personnel
Training and orienting personnel to the project
Assigning roles and responsibilities to personnel
Managing personnel performance and productivity
Ensuring compliance with labor laws and regulations
Examples include mobilizing a construc...
Cost control in project can be achieved through effective planning, monitoring and controlling of project expenses.
Create a detailed project budget and stick to it
Track expenses regularly and adjust budget as needed
Identify and eliminate unnecessary expenses
Negotiate with vendors for better pricing
Implement cost-saving measures without compromising quality
Use project management tools to monitor expenses and progress
Reg...
Handling clients requires effective communication, understanding their needs, and providing timely solutions.
Listen actively to their concerns and requirements
Communicate clearly and professionally
Provide timely updates and solutions
Build a strong relationship based on trust and respect
Be proactive in identifying and addressing potential issues
Ensure customer satisfaction by going above and beyond expectations
Manpower mobilization flow chart involves identifying needs, planning, recruitment, training, and deployment.
Identify the need for manpower
Plan the recruitment process
Source and screen candidates
Conduct interviews and assessments
Select and hire candidates
Provide training and orientation
Deploy manpower to required locations
posted on 14 Jul 2017
I appeared for an interview before Jul 2016.
I applied via Approached by Company and was interviewed before Feb 2021. There were 2 interview rounds.
posted on 17 Feb 2021
I applied via Walk-in and was interviewed in Aug 2020. There was 1 interview round.
posted on 18 Dec 2022
I applied via Random and was interviewed before Dec 2021. There were 3 interview rounds.
posted on 14 Apr 2024
I applied via Naukri.com and was interviewed before Apr 2023. There was 1 interview round.
I applied via Company Website and was interviewed before Jan 2022. There were 3 interview rounds.
Bus bar schemes are different ways of connecting bus bars in power systems.
Single bus bar scheme
Double bus bar scheme
Main and transfer bus bar scheme
Ring bus bar scheme
Breaker and a half scheme
Mesh bus bar scheme
The equipment sequence for any line bay starts with the circuit breaker and ends with the transformer.
The circuit breaker is the first equipment in the sequence.
Next comes the isolator switch.
After that, the earth switch is operated.
Then the line disconnector is opened.
Finally, the transformer is disconnected from the line.
The sequence is reversed when the line bay is put back into service.
Shift Engineer
8
salaries
| ₹2.8 L/yr - ₹4.1 L/yr |
Assistant Manager
6
salaries
| ₹2 L/yr - ₹6 L/yr |
Electrical Maintenance Engineer
6
salaries
| ₹1.5 L/yr - ₹4 L/yr |
Electrical Engineer
5
salaries
| ₹3.2 L/yr - ₹8.6 L/yr |
Electrical Supervisor
4
salaries
| ₹10 L/yr - ₹12.3 L/yr |
Megha Engineering & Infrastructures
Shapoorji Pallonji Group
Alstom Transportation
Tata Technologies