I applied via Referral and was interviewed before Sep 2020. There were 3 interview rounds.

Interview Questionnaire 

3 Questions

  • Q1. How do you calculate cooling capacity of screw chiller
  • Ans. 

    The cooling capacity of a screw chiller can be calculated using the formula: Cooling Capacity = Mass Flow Rate * Specific Heat Capacity * Temperature Difference

    • Determine the mass flow rate of the chilled water circulating through the chiller

    • Determine the specific heat capacity of the chilled water

    • Calculate the temperature difference between the chilled water entering and leaving the chiller

    • Multiply the mass flow rate, ...

  • Answered by AI
  • Q2. Components of nitrogen plant
  • Ans. 

    Components of a nitrogen plant include air compressor, air dryer, air filter, nitrogen generator, and nitrogen storage tank.

    • Air compressor: compresses air from the atmosphere

    • Air dryer: removes moisture from the compressed air

    • Air filter: removes impurities from the compressed air

    • Nitrogen generator: separates nitrogen from the compressed air

    • Nitrogen storage tank: stores the produced nitrogen

  • Answered by AI
  • Q3. What is the work expansion valve
  • Ans. 

    The expansion valve is a device used in refrigeration and air conditioning systems to control the flow of refrigerant.

    • It is located between the condenser and the evaporator in the system.

    • The expansion valve regulates the flow of high-pressure, high-temperature refrigerant from the condenser to the low-pressure, low-temperature refrigerant in the evaporator.

    • It maintains the proper pressure and temperature levels in the ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident be prepared by using net studies

Interview questions from similar companies

I applied via Recruitment Consultant and was interviewed before Aug 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. About your past experience

Interview Preparation Tips

Interview preparation tips for other job seekers - You can give interview from your place through Meet

I applied via Recruitment Consultant and was interviewed in Jun 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Questions based on your past experience and job profile.

Interview Preparation Tips

Interview preparation tips for other job seekers - Confidence plays a vital role in any interview. Give answer to the point. If you don't know something be polite.

Interview Questionnaire 

1 Question

  • Q1. Site engineer

Interview Preparation Tips

Interview preparation tips for other job seekers - Telephone interview

I applied via Recruitment Consultant and was interviewed in May 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. All questions ask on technical field which we have mentioned in our resume

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare resume after lots of thought process
Interview experience
1
Bad
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Jul 2023.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - One-on-one 

(1 Question)

  • Q1. Family discussion
Round 3 - One-on-one 

(2 Questions)

  • Q1. Personal introduction
  • Q2. Your past job experience only

Interview Preparation Tips

Interview preparation tips for other job seekers - Please if don't have any jobs or you are contractual working employee, then it's great to join but switch job after 2 years or before
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in Dec 2023. There were 2 interview rounds.

Round 1 - Group Discussion 

Technically knowledge

Round 2 - HR 

(1 Question)

  • Q1. Sallary discussion and company policy.

Engineer Interview Questions & Answers

UPL user image Anonymous

posted on 12 Mar 2021

I applied via Company Website and was interviewed before Mar 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. About commissioning

Interview Preparation Tips

Interview preparation tips for other job seekers - U can handle the job properly.Completed project in time

Interview Questionnaire 

2 Questions

  • Q1. In one cum RCC, how many labors are required?
  • Ans. 

    The number of labors required in a cum RCC depends on various factors such as project size, complexity, and timeline.

    • The number of labors required in a cum RCC can vary depending on the size of the project. Larger projects may require more labors.

    • The complexity of the project also plays a role in determining the number of labors needed. More complex projects may require additional skilled labors.

    • The timeline of the pro...

  • Answered by AI
  • Q2. In ground level there is 3, below ground level there is 4, above ground level and at height there are 5 to 6 labors required.

I applied via Campus Placement and was interviewed before Mar 2021. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. How much Ton material you fabricated with time span with final excution
  • Ans. 

    I have fabricated X tons of material within Y time span with successful execution.

    • Amount of material fabricated

    • Time span for fabrication

    • Execution success rate

  • Answered by AI
  • Q2. What is PMO and how it works
  • Ans. 

    PMO stands for Project Management Office. It is a centralized department that oversees project management across an organization.

    • PMO provides guidance, support, and standards for project management

    • It ensures that projects are aligned with the organization's goals and objectives

    • PMO monitors project progress and provides regular reports to stakeholders

    • It also manages resources, budgets, and risks associated with projects

    • ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare basic and good knowledge of piping

Excel Industries Interview FAQs

What are the top questions asked in Excel Industries Utility Engineer interview?

Some of the top questions asked at the Excel Industries Utility Engineer interview -

  1. How do you calculate cooling capacity of screw chil...read more
  2. What is the work expansion va...read more
  3. Components of nitrogen pl...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

Aarti Industries Interview Questions
4.1
 • 286 Interviews
UPL Interview Questions
4.1
 • 179 Interviews
PI Industries Interview Questions
4.0
 • 107 Interviews
Rallis India Interview Questions
4.2
 • 39 Interviews
Bharat Rasayan Interview Questions
4.0
 • 29 Interviews
View all
Senior Officer
47 salaries
unlock blur

₹3.6 L/yr - ₹6.6 L/yr

Senior Production Officer
28 salaries
unlock blur

₹2.9 L/yr - ₹6.4 L/yr

Executive
14 salaries
unlock blur

₹5.7 L/yr - ₹9.3 L/yr

Instrument Engineer
12 salaries
unlock blur

₹3.2 L/yr - ₹4.9 L/yr

R&D Officer
9 salaries
unlock blur

₹3.6 L/yr - ₹5.8 L/yr

Explore more salaries
Compare Excel Industries with

Aarti Industries

4.1
Compare

UPL

4.1
Compare

Coromandel International

4.1
Compare

PI Industries

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview