Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed in Aug 2024. There were 2 interview rounds.

Round 1 - Technical 

(3 Questions)

  • Q1. From your resume, make your resume crisp and should have knowledge about all part you mentioned in your resume with what , why kind of reason
  • Q2. Project management questions - Risk Management, Project planning and scheduling, MSP, Case Study based questions.
  • Q3. About your past experience and your specific role.
Round 2 - Technical 

(1 Question)

  • Q1. MS OFFICE, SOFTWARES USED, CTC , DEMAND AND EXPECTATIONS

Interview Preparation Tips

Interview preparation tips for other job seekers - Give Answers to the point and specific to the question, if don't know say don't know..need not to become oversmart.

Interview questions from similar companies

Round 1 - One-on-one 

(1 Question)

  • Q1. Tell us about yourself

Interview Preparation Tips

Interview preparation tips for other job seekers - Keep it short and crisp no matter what
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed before Oct 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

Numbers,LCM,HCF,Time speed Distance,Percentage

Round 3 - Group Discussion 

They randomly given any topic. Time limit is 5-10 minutes in a group of 10 members. Everyone has to speak about the topic.

Round 4 - Technical 

(5 Questions)

  • Q1. Types of Concrete & their grades with mix proportion ratio ?
  • Ans. 

    Types of concrete include normal strength, high strength, and high-performance concrete, each with different mix proportions.

    • Normal strength concrete: typically used for general construction, with mix proportions of 1:2:4 (cement:sand:aggregate)

    • High strength concrete: used for structures requiring higher strength, with mix proportions of 1:1.5:3

    • High-performance concrete: designed for specific applications, with mix pro

  • Answered by AI
  • Q2. Steps Involved in concreting & curing ?
  • Ans. 

    Steps involved in concreting & curing include preparation of formwork, mixing of concrete, pouring, leveling, finishing, and curing.

    • Prepare formwork by setting up wooden or metal molds to contain the concrete.

    • Mix concrete ingredients such as cement, sand, aggregate, and water in the correct proportions.

    • Pour the concrete into the formwork, ensuring it reaches all corners and edges.

    • Level the concrete surface using a scre...

  • Answered by AI
  • Q3. Purpose of Retaining Wall ?
  • Ans. 

    Retaining walls are structures designed to hold back soil and prevent erosion.

    • Prevent soil erosion

    • Support sloping terrain

    • Create usable space on a hillside

    • Enhance landscaping design

  • Answered by AI
  • Q4. What is Bending moment & Shear force diagram ?
  • Ans. 

    Bending moment & Shear force diagrams show the variation of internal forces along the length of a beam.

    • Bending moment diagram shows the variation of bending moment along the length of a beam.

    • Shear force diagram shows the variation of shear force along the length of a beam.

    • These diagrams are essential for analyzing the behavior of beams under different loading conditions.

    • The diagrams help in determining the maximum bend...

  • Answered by AI
  • Q5. Roles of quantity Surveyor at site & office ?
  • Ans. 

    Quantity Surveyors manage costs and contracts for construction projects, both on-site and in the office.

    • Preparing cost estimates and budgets

    • Analyzing construction plans and specifications

    • Negotiating with contractors and suppliers

    • Managing contracts and variations

    • Conducting site visits and inspections

    • Preparing progress reports and final accounts

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Greenko Group Assistant Manager interview:
  • Fluid Mechanics
  • Soil Mechanics
  • Quantity Surveying
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
6-8 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Mar 2024. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Resume related question.
Round 2 - HR 

(1 Question)

  • Q1. Salary discussion?

Interview Preparation Tips

Interview preparation tips for other job seekers - Requirement process very lag
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Group Discussion 

Regarding how to manage a site accommodation

Round 2 - HR 

(2 Questions)

  • Q1. Statutory related and other hr and admin work
  • Q2. How to handle work pressure
  • Ans. 

    I handle work pressure by prioritizing tasks, staying organized, and taking breaks when needed.

    • Prioritize tasks based on deadlines and importance

    • Stay organized by creating to-do lists and setting realistic goals

    • Take breaks to recharge and prevent burnout

    • Communicate with team members and delegate tasks when necessary

  • Answered by AI
Round 3 - One-on-one 

(2 Questions)

  • Q1. About background work and work calcture
  • Q2. About payroll and contractor work statutory labour law. And other work pressurerelated.

I applied via Naukri.com and was interviewed in Jun 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Question were related to my core profile which is production planning and control . SAP , excel was add on

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident about your self and your answer . Be presentable .

I applied via Referral and was interviewed in Aug 2021. There were 2 interview rounds.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Tell me about yourself.
  • Q2. Verification of resume and relevant tasks.
Round 2 - HR 

(6 Questions)

  • Q1. What are your salary expectations?
  • Q2. What is your family background?
  • Q3. Share details of your previous job.
  • Q4. Why are you looking for a change?
  • Q5. What are your strengths and weaknesses?
  • Q6. Tell me about yourself.

Interview Preparation Tips

Interview preparation tips for other job seekers - Kirloskar management looks for learning attitude profile people so that they can groom them to their requirements.
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

Maths reasoning quantitive aptitude & general knowledge questions

I applied via Naukri.com and was interviewed before Oct 2019. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Concrete rate breakup, Asking rate
  • Q2. Unique thumbrules breakup and unit conversion

Interview Preparation Tips

Interview preparation tips for other job seekers - I explained the concrete breakup with the margin of sub contractor, also explain the subcontractor unit rate breakup and Asking rate is anything like in cricket how many balla are remaining and how much u need to score more. Like.

Joining in L&T is my (No) for evey civil engineers dream..
Thumbrules break up
Rebar - (D2/162) ----(Area x Lengh x 7850).
Like

I applied via Naukri.com and was interviewed in Jul 2019. There were 3 interview rounds.

Interview Questionnaire 

4 Questions

  • Q1. Asked about To mentioned areas of weakness of L&T, or needs improvement?
  • Q2. How to make check or maintain elevation of Underground Piping.
  • Ans. 

    Maintain elevation of underground piping by using level instruments and proper installation techniques.

    • Use a level instrument to check the elevation of the piping during installation.

    • Ensure that the piping is installed with a consistent slope to prevent low spots where water can accumulate.

    • Regularly inspect the piping to ensure that it has not shifted or settled, which can affect the elevation.

    • Consider using supports o...

  • Answered by AI
  • Q3. My Job specific role & responsibility, in previous organisation.
  • Ans. 

    In my previous role as Assistant Manager, I was responsible for overseeing daily operations, managing staff, and ensuring customer satisfaction.

    • Managed a team of employees and delegated tasks effectively

    • Handled customer complaints and resolved issues in a timely manner

    • Created and implemented strategies to improve efficiency and productivity

    • Collaborated with other departments to achieve company goals

    • Conducted performanc

  • Answered by AI
  • Q4. Welding Electrodes for different materials.
  • Ans. 

    Welding electrodes are chosen based on the material being welded. Different materials require different types of electrodes.

    • Electrodes for mild steel have a coating that produces a stable arc and minimal spatter.

    • Stainless steel electrodes have a coating that resists corrosion and produces a smooth, clean weld.

    • Cast iron electrodes have a high nickel content to prevent cracking.

    • Aluminum electrodes have a special coating ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Just Be confidant, Be Humble, Be aware about your roles & Responsibility during job Period.

Enviropol Engineers Interview FAQs

How many rounds are there in Enviropol Engineers Deputy Project Manager interview for experienced candidates?
Enviropol Engineers interview process for experienced candidates usually has 2 rounds. The most common rounds in the Enviropol Engineers interview process for experienced candidates are Technical.
What are the top questions asked in Enviropol Engineers Deputy Project Manager interview for experienced candidates?

Some of the top questions asked at the Enviropol Engineers Deputy Project Manager interview for experienced candidates -

  1. From your resume, make your resume crisp and should have knowledge about all pa...read more
  2. Project management questions - Risk Management, Project planning and scheduling...read more
  3. MS OFFICE, SOFTWARES USED, CTC , DEMAND AND EXPECTATI...read more

Tell us how to improve this page.

Enviropol Engineers Deputy Project Manager Interview Process for Experienced

based on 1 interview

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

Siemens Interview Questions
4.1
 • 432 Interviews
Thermax Limited Interview Questions
4.1
 • 249 Interviews
AmbitionBox Interview Questions
4.9
 • 153 Interviews
Suzlon Group Interview Questions
4.1
 • 129 Interviews
BHEL Interview Questions
4.1
 • 109 Interviews
Webdew Interview Questions
4.5
 • 106 Interviews
View all

Enviropol Engineers Deputy Project Manager Reviews and Ratings

based on 1 review

3.0/5

Rating in categories

4.0

Skill development

2.0

Work-life balance

3.0

Salary

3.0

Job security

3.0

Company culture

2.0

Promotions

2.0

Work satisfaction

Explore 1 Review and Rating
Project Engineer
6 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Engineer
5 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Draughtsman Mechanical
4 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Site Engineer Mechanical
4 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Accounts Executive
4 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Enviropol Engineers with

Greenko Group

3.8
Compare

Thermax Limited

4.1
Compare

Kirloskar Brothers

3.8
Compare

VA Tech Wabag

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview