Filter interviews by
I applied via Approached by Company and was interviewed in Dec 2022. There were 2 interview rounds.
OHT stands for Overhead Traveling Hoist. It consists of various components.
The main components of OHT are the hoist, trolley, bridge, runway, and controls.
The hoist is the lifting mechanism that moves the load up and down.
The trolley is the mechanism that moves the hoist horizontally along the bridge.
The bridge is the overhead structure that supports the trolley and hoist.
The runway is the track on which the bridge mov...
The department of laying tranch is typically handled by the construction department.
The construction department is responsible for laying tranch.
This involves digging trenches and laying pipes or cables.
The department may also be responsible for backfilling and restoring the area after the work is complete.
Top trending discussions
based on 4 reviews
Rating in categories
Field Engineer
8
salaries
| ₹2.4 L/yr - ₹3.9 L/yr |
Assistant Material Engineer
5
salaries
| ₹3 L/yr - ₹3.5 L/yr |
Assistant Engineer
4
salaries
| ₹4.5 L/yr - ₹10 L/yr |
Draughtsman
4
salaries
| ₹1.2 L/yr - ₹3 L/yr |
Assistant Bridge Engineer
4
salaries
| ₹4.2 L/yr - ₹6 L/yr |
TCS
Infosys
Wipro
HCLTech