I applied via Job Portal and was interviewed before Dec 2023. There was 1 interview round.
Top trending discussions
I applied via Recruitment Consultant and was interviewed in Nov 2017. There were 8 interview rounds.
I applied via Walk-in and was interviewed before Sep 2021. There were 2 interview rounds.
DCS system architecture refers to the design and layout of a distributed control system.
DCS system architecture involves a network of controllers, sensors, and actuators.
The system is designed to control and monitor various processes in an industrial setting.
The architecture typically includes a central control room, field devices, and communication networks.
DCS systems can be customized to meet the specific needs of a...
Electrical earth is used for safety of electrical equipment while instrument earth is used for safety of instruments.
Electrical earth is used to protect electrical equipment from electrical faults and surges.
Instrument earth is used to protect sensitive instruments from electrical noise and interference.
Electrical earth is connected to the earth electrode while instrument earth is connected to the instrument chassis.
El...
I applied via Recruitment Consulltant and was interviewed in Dec 2023. There was 1 interview round.
I applied via Company Website and was interviewed in Oct 2021. There was 1 interview round.
Motor and panel switchgear erection in oil and gas field
Experience in installation and maintenance of motor and panel switchgear in oil and gas field
Knowledge of safety regulations and procedures in hazardous environments
Ability to read and interpret technical drawings and schematics
Familiarity with testing and commissioning procedures
Experience in troubleshooting and resolving electrical issues
Examples: installation o...
Date of completion refers to the deadline or expected date of finishing a project or task.
It is important to set a realistic date of completion to ensure timely delivery of projects.
Factors such as available resources, team capacity, and project complexity should be considered when setting the date of completion.
Regular monitoring and tracking of progress can help ensure that the project is on track to meet the date of...
posted on 22 May 2024
I was interviewed in Apr 2024.
IATF focuses on automotive industry requirements while ISO 9001 is a generic quality management standard.
IATF 16949 is specifically designed for automotive industry suppliers
ISO 9001 is a generic quality management standard applicable to any industry
IATF 16949 includes additional automotive-specific requirements such as production part approval process (PPAP)
Both standards emphasize continual improvement and customer s
I applied via Campus Placement and was interviewed before Feb 2023. There were 2 interview rounds.
The questions cover topics related to turbochargers, IC engines, engine parts, manufacturing processes, management skills, and interpersonal communication.
Turbocharger is a device that increases the efficiency and power output of an engine by forcing extra air into the combustion chamber.
IC engine works on the principle of internal combustion where fuel is burned inside the engine to produce power.
CI engine stands for ...
I applied via Naukri.com
Prepare for topics on current events, government regulations, corporate trends
Prepare for Management case study on complex problems, strategic issues
based on 1 interview
Interview experience
based on 2 reviews
Rating in categories
Senior Engineer
222
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
193
salaries
| ₹0 L/yr - ₹0 L/yr |
Project Engineer
99
salaries
| ₹0 L/yr - ₹0 L/yr |