Electrical Manufacturing Company Junior PCB Engineer Interview Questions and Answers

Updated 19 Sep 2020

Electrical Manufacturing Company Junior PCB Engineer Interview Experiences

1 interview found

Interview Questionnaire 

2 Questions

  • Q1. Why should we hire you?
  • Q2. Because i think i am the only one who can give 100 percent for this work. I will work not only money but i will try to do something in this company to achieve greatness path..

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
-
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement

Round 1 - Technical 

(2 Questions)

  • Q1. What is polymorphism?
  • Ans. 

    Polymorphism is the ability of a single function or method to operate on different types of data.

    • Polymorphism allows objects of different classes to be treated as objects of a common superclass.

    • There are two types of polymorphism: compile-time (method overloading) and runtime (method overriding).

    • Example: Inheritance in object-oriented programming languages like Java allows for polymorphism.

    • Example: Function overloading

  • Answered by AI
  • Q2. Design a 3 but up/down counter?
  • Ans. 

    A 3-bit up/down counter can be designed using flip-flops and logic gates.

    • Use 3 D flip-flops to store the count value.

    • Connect the Q output of each flip-flop to the D input of the next flip-flop.

    • Use logic gates to control the direction of counting (up or down).

  • Answered by AI
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Not Selected

I applied via Campus Placement and was interviewed in Apr 2024. There were 2 interview rounds.

Round 1 - Aptitude Test 

Technical questions (be prepared)

Round 2 - Technical 

(2 Questions)

  • Q1. Basic laws like right hand thumb rule
  • Q2. Questions related to Electrical Machines

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepared for interview and test. It's a great opportunity
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Newspaper Ad and was interviewed in Jun 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. How to reduce resistance for transformer
  • Ans. 

    To reduce resistance in a transformer, one can use low resistance materials, increase the cross-sectional area of the winding, and minimize the length of the winding.

    • Use low resistance materials for the transformer windings

    • Increase the cross-sectional area of the winding to reduce resistance

    • Minimize the length of the winding to reduce resistance

    • Ensure proper insulation to avoid any short circuits

    • Maintain proper cooling

  • Answered by AI
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. What is synchronous and histerisis motor
  • Ans. 

    Synchronous motor runs at a constant speed while hysteresis motor has a rotor that follows the rotating magnetic field.

    • Synchronous motor is used in applications where constant speed is required, such as in clocks and timers.

    • Hysteresis motor is used in applications where precise control of speed is required, such as in record players and tape recorders.

    • Synchronous motor has a stator and rotor that rotate at the same spe...

  • Answered by AI
  • Q2. Different between plc and scada
  • Ans. 

    PLC is a hardware device that controls industrial processes, while SCADA is a software system that monitors and controls those processes.

    • PLC is a programmable logic controller that controls the input/output of industrial processes.

    • SCADA is a supervisory control and data acquisition system that collects and analyzes data from the industrial processes.

    • PLC is a hardware device, while SCADA is a software system.

    • PLC is used...

  • Answered by AI
  • Q3. Different between relay and contactor
  • Ans. 

    Relays are used for low power applications while contactors are used for high power applications.

    • Relays are typically used in control circuits to switch low power loads such as lights and fans.

    • Contactors are used to switch high power loads such as motors and compressors.

    • Relays have a lower current rating than contactors.

    • Contactors have larger contacts and can handle higher currents than relays.

    • Relays are typically smal...

  • Answered by AI
  • Q4. Different between switch and relay
  • Ans. 

    Switches are used to control the flow of current in a circuit, while relays are used to switch a circuit on or off.

    • Switches are manually operated, while relays are electrically operated.

    • Switches are used in low voltage applications, while relays are used in high voltage applications.

    • Switches are simple in construction, while relays are more complex.

    • Examples of switches include light switches and toggle switches, while ...

  • Answered by AI
Round 3 - Technical 

(1 Question)

  • Q1. Different between switch and timer
  • Ans. 

    Switch is an electronic component used to connect or disconnect a circuit while a timer is a device used to measure time intervals.

    • Switch is used to turn on/off a device while timer is used to control the duration of a device's operation.

    • Switch is a binary device with two states (on/off) while timer can be analog or digital and can measure time in seconds, minutes, or hours.

    • Examples of switches include light switches, ...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Electrical engineering and electronics engineering

Skills evaluated in this interview

Round 1 - Technical 

(1 Question)

  • Q1. Testing of energy meters, CTs and PTs etc.
  • Ans. 

    Testing of energy meters, CTs and PTs involves verifying their accuracy and functionality.

    • Energy meters are tested to ensure they measure energy consumption accurately.

    • CTs (Current Transformers) are tested to verify their current ratio and accuracy.

    • PTs (Potential Transformers) are tested to verify their voltage ratio and accuracy.

    • Testing may involve simulating different load conditions and measuring the output.

    • Calibrat...

  • Answered by AI
Round 2 - Technical 

(2 Questions)

  • Q1. How energy meter will be test on line mode at site.
  • Ans. 

    Energy meter can be tested on line mode at site using a portable test equipment.

    • Use a portable test equipment to simulate the load and measure the output of the energy meter.

    • Ensure that the test equipment is calibrated and accurate.

    • Perform the test during normal operating conditions to get accurate results.

    • Compare the readings with the manufacturer's specifications to determine if the energy meter is functioning proper...

  • Answered by AI
  • Q2. How CT will be test at site with load condition.
  • Ans. 

    CT can be tested at site with load condition using a test kit and a load bank.

    • Use a test kit to measure the CT ratio and polarity

    • Connect the CT to a load bank to simulate load conditions

    • Measure the output voltage and current of the CT under load

    • Compare the measured values with the CT specifications

    • Repeat the test for different load conditions

    • Ensure safety precautions are taken during the test

  • Answered by AI
Round 3 - Technical 

(2 Questions)

  • Q1. How PT will be test at load condition.
  • Ans. 

    PT can be tested at load condition by applying the load and measuring the voltage and current.

    • Apply the load to the PT

    • Measure the voltage and current using appropriate instruments

    • Calculate the power factor and accuracy of the PT

    • Ensure that the PT is within the acceptable limits of error

    • Repeat the test at different load conditions to ensure accuracy

  • Answered by AI
  • Q2. How over current relay will be set according to the load described.
  • Ans. 

    Over current relay is set based on the load current and time characteristics.

    • Determine the maximum load current and time characteristics

    • Select the appropriate over current relay type and current rating

    • Calculate the relay settings based on the load current and time characteristics

    • Adjust the settings to ensure proper coordination with other protective devices

    • Test the relay to ensure proper operation

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - If wants a job from the company you will be must technically sound for the job.

Skills evaluated in this interview

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Feb 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Regarding production sequence
  • Q2. IPQ,TQM,ISO RELATED QUISTION

I was interviewed before Sep 2016.

Interview Questionnaire 

2 Questions

  • Q1. What is meaning of success
  • Ans. 

    Success is the achievement of goals and fulfillment of one's potential.

    • Success is subjective and varies from person to person.

    • It can be measured by achieving personal or professional goals.

    • Success is often associated with happiness, fulfillment, and a sense of accomplishment.

    • It can be financial, academic, career-related, or personal.

    • Success can also be defined by the impact one has on others or society.

    • Examples of succ...

  • Answered by AI
  • Q2. What is fmea? In brief
  • Ans. 

    FMEA stands for Failure Mode and Effects Analysis. It is a systematic approach to identify and prevent potential failures in a process or product.

    • FMEA is used to analyze and prioritize potential failures based on their severity, occurrence, and detectability.

    • It helps in identifying the root causes of failures and developing preventive measures.

    • FMEA involves creating a risk priority number (RPN) to rank failures and det...

  • Answered by AI

Interview Preparation Tips

Round: Technical + HR Interview
Experience: After introduction they asked me que Abou life and success. after about technical terms.fmea and about my work and six sigma

Tell us how to improve this page.

Interview Questions from Similar Companies

Siemens Interview Questions
4.1
 • 429 Interviews
ABB Interview Questions
4.1
 • 230 Interviews
Havells Interview Questions
4.0
 • 207 Interviews
BHEL Interview Questions
4.1
 • 109 Interviews
Polycab Wires Interview Questions
4.0
 • 92 Interviews
KEI Industries Interview Questions
4.2
 • 53 Interviews
View all
Electrical Engineer
34 salaries
unlock blur

₹1 L/yr - ₹4.5 L/yr

Electrician
30 salaries
unlock blur

₹1 L/yr - ₹4 L/yr

Electrical Maintenance Engineer
20 salaries
unlock blur

₹1 L/yr - ₹5.3 L/yr

Production Engineer
11 salaries
unlock blur

₹1.1 L/yr - ₹5.5 L/yr

Quality Engineer
10 salaries
unlock blur

₹2.2 L/yr - ₹3.8 L/yr

Explore more salaries
Compare Electrical Manufacturing Company with

Siemens

4.1
Compare

ABB

4.1
Compare

Schneider Electric

4.2
Compare

Havells

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview