Filter interviews by
My dwm stands for Daily Work Management, which involves planning, organizing, and executing tasks efficiently on a daily basis.
DWM involves setting daily goals and priorities
It includes creating to-do lists and schedules
Regularly reviewing progress and making adjustments as needed
Examples: using tools like Kanban boards, daily stand-up meetings
I applied via Approached by Company and was interviewed in Feb 2023. There were 4 interview rounds.
The lead time of one part to be finished varies depending on the complexity of the part and the production process.
Lead time can range from a few hours to several weeks, depending on factors such as manufacturing processes, availability of materials, and production capacity.
Complex parts requiring precision machining may have longer lead times compared to simple parts that can be easily mass-produced.
Just-in-time manuf...
Processes, machines, and materials are essential components in manufacturing operations.
Processes refer to the series of steps or actions taken to transform raw materials into finished products.
Machines are tools or equipment used to perform specific tasks in the manufacturing process.
Materials are the substances or components used to create products, such as metals, plastics, or chemicals.
Eicher Engineering Components interview questions for popular designations
The paint shop quality is crucial for ensuring a flawless finish on Mahindra vehicles.
Quality control measures are implemented to ensure consistency in paint application.
Regular maintenance of equipment and tools is essential to prevent defects in the paint job.
Training programs for employees help in maintaining high standards of paint shop quality.
Use of high-quality paint materials and adherence to manufacturer guide...
I applied via Walk-in and was interviewed in Nov 2022. There were 2 interview rounds.
I applied via Referral and was interviewed in Dec 2021. There were 2 interview rounds.
The least count of a digital micrometer is the smallest measurement that can be accurately read on the micrometer scale.
The least count is determined by the number of divisions on the micrometer scale and the resolution of the digital display.
For example, if the micrometer scale has 50 divisions and the digital display has a resolution of 0.001mm, the least count would be 0.02mm.
To calculate the least count, divide the...
5S is a workplace organization method and Six Sigma is a data-driven approach to process improvement.
5S focuses on organizing and standardizing the workplace to improve efficiency and reduce waste.
Six Sigma uses statistical analysis to identify and eliminate defects in a process.
Both methodologies aim to improve quality and productivity in a business.
Example of 5S: organizing tools in a workshop to reduce search time a...
I applied via Naukri.com and was interviewed in Jan 2022. There was 1 interview round.
Top trending discussions
based on 18 interviews
Interview experience
based on 138 reviews
Rating in categories
Senior Engineer
35
salaries
| ₹0 L/yr - ₹0 L/yr |
Quality Engineer
21
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
20
salaries
| ₹0 L/yr - ₹0 L/yr |
Junior Manager
18
salaries
| ₹0 L/yr - ₹0 L/yr |
Quality Inspector
15
salaries
| ₹0 L/yr - ₹0 L/yr |
Bharat Forge
Sundaram Clayton
Rane (Madras)
Ramkrishna Forgings