Filter interviews by
I applied via Naukri.com and was interviewed in Nov 2022. There were 2 interview rounds.
Handling PMC projects at airports involves coordinating all electrical activities to ensure smooth operations.
Coordinate closely with airport authorities and other stakeholders to understand project requirements
Ensure compliance with airport regulations and safety standards
Manage subcontractors effectively to meet project deadlines
Regularly inspect and monitor electrical installations to ensure quality and functionalit...
Top trending discussions
posted on 11 Nov 2024
I applied via Company Website and was interviewed in Dec 2024. There were 2 interview rounds.
I was interviewed in Sep 2024.
I was interviewed in Sep 2024.
posted on 25 Sep 2024
I applied via campus placement at National Institute of Technology (NIT), Silchar and was interviewed in Aug 2024. There were 3 interview rounds.
Quantitative aptitude
The switch shown in the image is a toggle switch.
The switch has a lever that can be moved up and down to turn it on or off.
Toggle switches are commonly used in electronic devices and appliances.
Examples of toggle switches include light switches and power switches on electronic devices.
In t years, I see myself as a senior electrical engineer leading innovative projects and mentoring junior engineers.
Continuing to develop my technical skills and knowledge in the field of electrical engineering
Taking on more leadership roles within projects and teams
Mentoring and guiding junior engineers to help them grow in their careers
Contributing to the development of cutting-edge technologies and solutions
Possibly...
I want to join Hitachi Energy because of their innovative solutions and global impact in the energy sector.
Hitachi Energy is a leader in providing sustainable energy solutions
I am impressed by Hitachi Energy's commitment to innovation and technology advancement
I believe my skills and experience align well with the opportunities at Hitachi Energy
I am excited about the chance to work on cutting-edge projects and contribu
posted on 23 Apr 2024
I applied via Campus Placement
AC motor speed can be controlled using methods like voltage control, frequency control, and pole changing.
Voltage control: Adjusting the voltage supplied to the motor to change its speed.
Frequency control: Changing the frequency of the AC power supplied to the motor to control its speed.
Pole changing: Altering the number of poles in the motor to adjust its speed.
Using variable frequency drives (VFDs) for precise speed
I applied via Naukri.com and was interviewed before Jan 2024. There were 2 interview rounds.
I applied via Walk-in and was interviewed in Jul 2023. There were 6 interview rounds.
LOTO stands for Lockout/Tagout, a safety procedure used to ensure that dangerous machines are properly shut off and not started up again prior to the completion of maintenance or servicing work.
LOTO involves locking the energy isolating devices with an assigned individual lock and tag to prevent the machine from being turned on.
Types of LOTO include electrical LOTO, mechanical LOTO, and pneumatic LOTO.
Examples of LOTO ...
Normal discussion with seniors
Interview experience
Field Engineer
17
salaries
| ₹2 L/yr - ₹3.7 L/yr |
Site Engineer
11
salaries
| ₹3 L/yr - ₹7.2 L/yr |
Assistant Resident Engineer
10
salaries
| ₹7.5 L/yr - ₹10.5 L/yr |
Senior Manager
9
salaries
| ₹12 L/yr - ₹25 L/yr |
Quantity Surveyor
7
salaries
| ₹3.9 L/yr - ₹6.1 L/yr |
AECOM
Jacobs Engineering Group
WSP
Ramboll