i
Egis India Consulting Engineers
Filter interviews by
I applied via Approached by Company and was interviewed in Feb 2023. There were 3 interview rounds.
Modeling in Civil 3D involves creating a 3D digital representation of a civil engineering project.
Start by importing or creating a base map of the project area.
Create surfaces for the existing ground and proposed design.
Add alignments, profiles, and corridors to represent the roadway design.
Include grading, drainage, and utility design elements.
Generate plan sheets and cross sections for construction documentation.
Coll...
Feature lines are 3D polylines used in grading to define the surface of the terrain.
Feature lines are used in civil engineering and construction to create a 3D model of the terrain.
They are used to define the surface of the terrain and are created by connecting points with 3D polylines.
Feature lines are used in grading to create slopes, berms, and other features on the terrain.
They can also be used to create drainage p...
Superelevation is provided by banking the outer edge of the road higher than the inner edge.
Superelevation is the banking of the road to counteract the centrifugal force acting on a vehicle as it moves around a curve.
It is provided by raising the outer edge of the road higher than the inner edge.
The amount of superelevation required depends on the design speed of the road and the radius of the curve.
Superelevation can ...
Provide level to cw offsets by using surveying instruments and techniques.
Use a total station or level to measure the height difference between the centerline and the offset point
Calculate the required offset distance based on design standards and regulations
Mark the offset point on the ground using stakes or paint
Ensure the offset point is visible and accessible during construction
Verify the accuracy of the offset usi
Top trending discussions
I applied via Approached by Company and was interviewed before Jul 2021. There was 1 interview round.
I applied via Walk-in and was interviewed before Aug 2019. There was 1 interview round.
Fe500 is a type of high-strength reinforcement steel used in construction.
Fe500 stands for 'Fe' meaning iron and '500' representing the minimum yield strength of the steel in megapascals (MPa).
It is commonly used in construction for its high strength and durability.
Fe500 steel bars are used in reinforced concrete structures such as buildings, bridges, and highways.
It is also known as TMT (Thermo-Mechanically Treated) s...
To draw SFD and BMD for simply supported beam under UDL of 10KM/m, follow these steps:
Calculate the reactions at the supports
Draw the SFD by taking the upward forces as positive and starting from one end
Draw the BMD by taking the positive moment as clockwise and starting from one end
Mark the maximum values of SFD and BMD
Check the equilibrium and compatibility of the beam
I applied via Campus Placement and was interviewed before Sep 2021. There were 2 interview rounds.
It was pretty easy,
Patterns, logical reasoning kinda stuff
I applied via Campus Placement and was interviewed in Mar 2024. There were 2 interview rounds.
Aptitude, verbal, core, logical questions
BMD of a frame refers to the bending moment diagram which shows the variation of bending moment along the length of a structural frame.
BMD is a graphical representation of the variation of bending moment in a structural frame.
It helps in analyzing the internal forces and stresses in the frame.
BMD is typically plotted with the bending moment on the y-axis and the length of the frame on the x-axis.
The BMD can be used to ...
Base pressure diagram of foundation shows the distribution of pressure on the foundation base.
Base pressure diagram helps in understanding how the load is distributed on the foundation base.
It is important for designing foundations to ensure they can support the load effectively.
The diagram typically shows higher pressure under the columns and lower pressure in between.
It is used to determine the size and depth of the ...
I applied via Approached by Company and was interviewed before Jan 2023. There were 2 interview rounds.
The full scope of work is in accordance with the conditions of the contract.
posted on 26 Aug 2024
I applied via LinkedIn and was interviewed before Aug 2023. There were 2 interview rounds.
Seeking new challenges and opportunities for growth in a different environment.
Desire for career advancement
Seeking new challenges
Opportunity for growth
Change in work environment
Acceptance criteria of cube includes dimensions, material, weight, and quality standards.
Dimensions must meet specified measurements (e.g. 10cm x 10cm x 10cm)
Material should be durable and suitable for intended use (e.g. plastic, wood, metal)
Weight should be within acceptable range based on material and size
Quality standards must be met in terms of finish, edges, and overall construction
Stripping time of shutterings refers to the time required for removing the formwork from concrete structures.
Stripping time depends on factors like type of formwork material, concrete mix design, ambient temperature, and curing method.
For example, timber formwork may require longer stripping time compared to steel formwork.
In hot weather, concrete may set faster, reducing the stripping time.
Proper curing can also affec...
Code 1200 is not specifically for billing purposes.
Code 1200 is typically used in reference to a specific task or action, not billing.
It could be related to a specific product, service, or process within a company.
For example, code 1200 might indicate a specific troubleshooting step in a technical manual.
Manpower output varies depending on the type of work, with factors such as skill level, equipment availability, and project timeline playing a role.
Manpower output for shuttering can range from 10-20 sqm per day depending on complexity
Steelwork output can vary from 50-100 kg per worker per day
Blockwork output can range from 50-100 blocks per worker per day
Plastering output can vary from 10-20 sqm per worker per day
Fact...
based on 1 interview
Interview experience
Field Engineer
263
salaries
| ₹1.7 L/yr - ₹4.8 L/yr |
Civil Engineer
51
salaries
| ₹2.8 L/yr - ₹10 L/yr |
Senior Manager
44
salaries
| ₹7.7 L/yr - ₹21.5 L/yr |
Assistant Resident Engineer
43
salaries
| ₹4.4 L/yr - ₹12 L/yr |
Resident Engineer
41
salaries
| ₹5.6 L/yr - ₹18.4 L/yr |
L&T Construction
Shapoorji Pallonji Group
Saint-Gobain
AECOM