Upload Button Icon Add office photos
Premium Employer

i

This company page is being actively managed by Eaton Team. If you also belong to the team, you can get access from here

Eaton Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Eaton Equipment Project Engineer Interview Questions and Answers

Updated 19 Jan 2023

Eaton Equipment Project Engineer Interview Experiences

1 interview found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Jan 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. DFSS, DMAIC, NPD, NPI, VAVE
  • Q2. Approach, Process, Decision making
  • Q3. DFSS methodology, and Process
  • Ans. 

    DFSS methodology is a data-driven approach to design and improve processes, products, and services.

    • DFSS stands for Design for Six Sigma

    • It involves five phases: Define, Measure, Analyze, Design, and Verify

    • It aims to minimize defects and variability in processes and products

    • It uses statistical tools and techniques to analyze data and make informed decisions

    • Example: Using DFSS to design a new product with minimal defects

  • Answered by AI
Round 3 - Technical 

(2 Questions)

  • Q1. Process and approach
  • Q2. Process, approach, decision making

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare for interview and give answers confidently.

Eaton Interview FAQs

How many rounds are there in Eaton Equipment Project Engineer interview?
Eaton interview process usually has 3 rounds. The most common rounds in the Eaton interview process are Technical and Resume Shortlist.
What are the top questions asked in Eaton Equipment Project Engineer interview?

Some of the top questions asked at the Eaton Equipment Project Engineer interview -

  1. DFSS methodology, and Proc...read more
  2. DFSS, DMAIC, NPD, NPI, V...read more
  3. Approach, Process, Decision mak...read more

Tell us how to improve this page.

Eaton Equipment Project Engineer Interview Process

based on 1 interview

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

Siemens Interview Questions
4.1
 • 429 Interviews
Johnson Controls Interview Questions
3.6
 • 257 Interviews
ABB Interview Questions
4.1
 • 229 Interviews
Adani Power Interview Questions
3.9
 • 211 Interviews
Adani Group Interview Questions
3.9
 • 182 Interviews
Tata Power Interview Questions
3.9
 • 160 Interviews
NTPC Interview Questions
4.2
 • 159 Interviews
Suzlon Group Interview Questions
4.1
 • 128 Interviews
Torrent Power Interview Questions
3.7
 • 125 Interviews
View all

Eaton Equipment Project Engineer Reviews and Ratings

based on 1 review

3.0/5

Rating in categories

2.0

Skill development

2.0

Work-life balance

3.0

Salary

3.0

Job security

3.0

Company culture

1.0

Promotions

1.0

Work satisfaction

Explore 1 Review and Rating
Analyst
442 salaries
unlock blur

₹4.8 L/yr - ₹18 L/yr

Associate Analyst
428 salaries
unlock blur

₹4.3 L/yr - ₹11.6 L/yr

Engineer
303 salaries
unlock blur

₹7.5 L/yr - ₹20 L/yr

Senior Analyst
270 salaries
unlock blur

₹7.5 L/yr - ₹27 L/yr

Senior Engineer
235 salaries
unlock blur

₹11.5 L/yr - ₹29 L/yr

Explore more salaries
Compare Eaton with

Schneider Electric

4.2
Compare

Siemens

4.1
Compare

ABB

4.1
Compare

Emerson Electric Co.

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview