Filter interviews by
I applied via Referral and was interviewed in Feb 2023. There were 3 interview rounds.
I applied via Recruitment Consulltant and was interviewed before Dec 2023. There was 1 interview round.
The grinding process involves using a rotating abrasive wheel to remove material from a workpiece.
Grinding is a machining process that uses an abrasive wheel to remove material from a workpiece.
The workpiece is held in place while the grinding wheel rotates at high speed, making contact with the material and removing small chips.
Different types of grinding processes include surface grinding, cylindrical grinding, and c...
Establish open communication, respect union rules, negotiate fairly, address concerns promptly
Establish open communication channels with union representatives
Respect union rules and regulations to maintain a positive relationship
Negotiate fairly and transparently during contract discussions
Address any concerns or grievances from unionised manpower promptly and effectively
posted on 16 Nov 2021
I applied via AmbitionBox and was interviewed in Oct 2021. There was 1 interview round.
posted on 30 Nov 2021
I applied via Naukri.com and was interviewed in Oct 2021. There was 1 interview round.
posted on 26 Apr 2021
I applied via Company Website
posted on 22 Jan 2022
I applied via Referral and was interviewed before Jan 2021. There were 3 interview rounds.
UB and UC are different types of steel beams used in construction.
UB stands for Universal Beam and has a wider flange than UC.
UC stands for Universal Column and has a narrower flange than UB.
UB beams are commonly used for horizontal structures like roofs and floors.
UC columns are commonly used for vertical structures like pillars and posts.
I applied via Recruitment Consulltant and was interviewed in Sep 2024. There were 2 interview rounds.
posted on 31 May 2024
I was interviewed in May 2024.
The number of Engineering Documents processed in an EPC project varies depending on the size and complexity of the project.
The number of Engineering Documents processed in an EPC project can range from hundreds to thousands.
These documents include drawings, specifications, calculations, reports, and other technical documents.
The exact number of documents will depend on the scope of the project, the number of discipline...
posted on 13 Apr 2023
I applied via Naukri.com and was interviewed in Oct 2022. There were 3 interview rounds.
IATF certification ensures that an organization's quality management system meets international standards for automotive industry.
IATF certification is required for any organization that wants to supply products or services to the automotive industry.
It ensures that the organization's quality management system meets international standards for the automotive industry.
It helps to improve the organization's processes and...
Kaizen is continuous improvement while Poka Yoke is mistake-proofing.
Kaizen focuses on making small, incremental improvements to processes and systems over time.
Poka Yoke aims to prevent mistakes from happening by designing processes and systems in a way that makes errors impossible or easily detectable.
Kaizen is a long-term strategy while Poka Yoke is a short-term tactic.
Examples of Kaizen include implementing a sugge...
Points to consider while designing fixtures or gauges.
Understand the purpose of the fixture or gauge
Consider the material and size of the workpiece
Ensure proper clamping and alignment
Design for ease of use and maintenance
Consider the manufacturing process and cost
Test and validate the fixture or gauge before use
posted on 21 Mar 2024
I applied via Campus Placement and was interviewed before Mar 2023. There was 1 interview round.
Differential is a mechanical device that allows wheels to rotate at different speeds while maintaining traction.
Differential allows wheels on the same axle to rotate at different speeds
Helps maintain traction by allowing wheels to spin at different rates
Commonly found in vehicles to prevent skidding during turns
International Marketing Executive
19
salaries
| ₹2.5 L/yr - ₹5.6 L/yr |
Quality Engineer
9
salaries
| ₹2 L/yr - ₹3.5 L/yr |
Procurement Engineer
7
salaries
| ₹3.7 L/yr - ₹5.5 L/yr |
Design Engineer
6
salaries
| ₹3 L/yr - ₹4 L/yr |
Senior Engineer
5
salaries
| ₹4.1 L/yr - ₹5.2 L/yr |
Thermax Limited
Cummins
Isgec Heavy Engineering
Sigma Electric Manufacturing Corporation