Upload Button Icon Add office photos

Filter interviews by

Dynapac Product Specialist Interview Questions and Answers

Updated 22 Aug 2022

Dynapac Product Specialist Interview Experiences

1 interview found

I applied via Recruitment Consulltant

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. What are compaction method? Describe Frequency, amplitude and centrifugal force? Question on heavy and light compaction equipment.
  • Ans. 

    Compaction methods involve applying force to soil to increase its density. Frequency, amplitude, and centrifugal force are key factors.

    • Frequency refers to the number of times a compactor's plate or roller vibrates per minute.

    • Amplitude is the distance the plate or roller moves up and down during vibration.

    • Centrifugal force is the force generated by a rotating compactor that pushes soil outward.

    • Heavy compaction equipment...

  • Answered by AI
Round 3 - One-on-one 

(1 Question)

  • Q1. Brief on Past experience and prompt decission to up brakedown machines
  • Ans. 

    I have experience in identifying breakdown machines and taking prompt decisions to fix them.

    • I have worked as a product specialist for 3 years and have encountered various breakdowns in machines.

    • I have developed a keen eye for identifying the root cause of the breakdown and have a good understanding of the machines' working.

    • I have a systematic approach to troubleshooting and prioritize the issues based on their impact o...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Dynapac Product Specialist interview:
  • Hydraulics
  • Electrical drawings
Interview preparation tips for other job seekers - Do your job dedicatedly and prepare for same

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(3 Questions)

  • Q1. What is your roles and responsibilities in your current Organization.
  • Q2. How can handle difficult permanent operator.
  • Ans. 

    To handle a difficult permanent operator, establish clear expectations, communicate effectively, address issues promptly, provide support and training, and seek to understand their perspective.

    • Establish clear expectations for performance and behavior.

    • Communicate effectively and regularly to address any concerns or issues.

    • Address problems promptly and professionally to prevent escalation.

    • Provide support, training, and r...

  • Answered by AI
  • Q3. What is your DWM activities.
  • Ans. 

    DWM activities refer to Daily Work Management activities, which involve planning, organizing, and monitoring daily tasks to ensure efficiency and productivity.

    • Creating daily work schedules for production team members

    • Assigning tasks and responsibilities to team members

    • Monitoring progress and addressing any issues that arise

    • Implementing improvements to streamline processes

    • Ensuring adherence to safety protocols and qualit

  • Answered by AI
Round 2 - Technical 

(3 Questions)

  • Q1. What do you about TPM.
  • Ans. 

    TPM stands for Total Productive Maintenance, a proactive approach to maintenance that aims to maximize equipment effectiveness.

    • TPM focuses on preventing equipment breakdowns through regular maintenance and employee involvement.

    • It involves setting up autonomous maintenance teams to perform routine tasks and inspections.

    • TPM also includes planned maintenance, quality maintenance, and focused improvement activities.

    • The goa...

  • Answered by AI
  • Q2. What is kai zen you have done in current Organization.
  • Q3. What is mean by OEE
  • Ans. 

    OEE stands for Overall Equipment Effectiveness, a measure of how well a manufacturing process is utilized.

    • OEE is calculated by multiplying Availability, Performance, and Quality percentages.

    • Availability measures the percentage of time the equipment is available for production.

    • Performance measures the speed at which the equipment runs compared to its maximum speed.

    • Quality measures the percentage of good parts produced c...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare for interview according profile requirements read all requirements that employer want.Be confident don't need to hesitate,because no one cam judge your knowledge in 25/30 mins.make calmness,don't be panic situations if are not getting anyone question answer of recruiter.
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Apr 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. What is Insulator,Conductor etc
  • Ans. 

    Insulators are materials that do not easily allow the flow of electricity, while conductors are materials that allow the flow of electricity.

    • Insulators have high resistance to electrical current.

    • Conductors have low resistance to electrical current.

    • Examples of insulators: rubber, glass, plastic.

    • Examples of conductors: copper, aluminum, gold.

  • Answered by AI
  • Q2. Basic questions related to electronics components

Interview Preparation Tips

Interview preparation tips for other job seekers - Good job,
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
No response

I was interviewed in Aug 2024.

Round 1 - Aptitude Test 

English, maths and puzzles basic preparation.
Question
Add four work before work,guard to make meaningful word

Interview Preparation Tips

Interview preparation tips for other job seekers - Question from your resume ask during interview.
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Aug 2023. There was 1 interview round.

Round 1 - Technical 

(10 Questions)

  • Q1. If plan vs actual is 97% then what is your performance rate
  • Ans. 

    Performance rate is 97%

    • Performance rate = 100% - (100% - 97%) = 3%

    • Performance rate = 3%

    • This means the actual performance is 3% below the planned performance

  • Answered by AI
  • Q2. How to control your inhouse rework
  • Ans. 

    Implement strict quality control measures, identify root causes of rework, provide training to employees, and continuously monitor and improve processes.

    • Implement strict quality control measures to catch errors early on

    • Identify root causes of rework to address underlying issues

    • Provide training to employees to improve skills and reduce errors

    • Continuously monitor and improve processes to prevent rework

    • Utilize data analys

  • Answered by AI
  • Q3. How you improve your productivity rate
  • Ans. 

    I improve my productivity rate by setting clear goals, prioritizing tasks, utilizing time management techniques, and continuously seeking ways to streamline processes.

    • Setting clear goals to stay focused and motivated

    • Prioritizing tasks based on importance and deadlines

    • Utilizing time management techniques such as the Pomodoro technique or Eisenhower matrix

    • Seeking ways to streamline processes through automation or optimiz...

  • Answered by AI
  • Q4. How you decrease labor cost
  • Ans. 

    Labor cost can be decreased by implementing automation, optimizing processes, outsourcing non-core tasks, and cross-training employees.

    • Implement automation to reduce manual labor requirements

    • Optimize processes to increase efficiency and reduce labor hours

    • Outsource non-core tasks to lower cost regions or specialized vendors

    • Cross-train employees to handle multiple roles and tasks effectively

  • Answered by AI
  • Q5. How you reduce change over frequency
  • Ans. 

    To reduce change over frequency, implement standardized work procedures, improve equipment reliability, optimize scheduling, and minimize setup times.

    • Implement standardized work procedures to ensure consistency and efficiency during changeovers

    • Improve equipment reliability to reduce downtime and increase productivity

    • Optimize scheduling to minimize changeover frequency and maximize production time

    • Minimize setup times by...

  • Answered by AI
  • Q6. What is your DWM
  • Ans. 

    DWM stands for Daily Work Management, which involves planning, organizing, and executing daily tasks to ensure efficient production operations.

    • DWM involves creating daily schedules for production activities

    • It includes assigning tasks to team members and monitoring progress

    • Regularly updating and adjusting plans based on production needs

    • Examples: setting up daily production targets, coordinating with different department

  • Answered by AI
  • Q7. How to you improve your team
  • Q8. If availabilty is x then what is your performance
  • Ans. 

    Performance is dependent on various factors, not just availability.

    • Performance is influenced by factors such as skill level, experience, resources, and support.

    • Availability is just one aspect that can impact performance, but it is not the sole determinant.

    • For example, even if availability is high, performance may still be low if other factors are not optimal.

  • Answered by AI
  • Q9. How to resolve customer complaint
  • Ans. 

    Listen to the complaint, empathize with the customer, investigate the issue, offer a solution, follow up to ensure satisfaction.

    • Listen actively to the customer's complaint without interrupting

    • Empathize with the customer and acknowledge their frustration

    • Investigate the issue to understand the root cause

    • Offer a solution that addresses the customer's concerns

    • Follow up with the customer to ensure their satisfaction with th

  • Answered by AI
  • Q10. How to manage if abnormal condition will happened
  • Ans. 

    To manage abnormal conditions, prioritize safety, assess the situation, take corrective actions, and communicate effectively.

    • Prioritize safety of personnel and equipment

    • Assess the situation to understand the root cause

    • Take corrective actions promptly to mitigate the abnormal condition

    • Communicate effectively with team members and stakeholders

    • Implement preventive measures to avoid recurrence

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Bharat Seats Senior Production Engineer interview:
  • About OEE
Interview preparation tips for other job seekers - Please learn about it

Skills evaluated in this interview

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed before Apr 2021. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. About tell me your self, DWM, Process knowledge
Round 2 - Technical 

(1 Question)

  • Q1. TPM, DWM, Best Kaizen, Technical ability

Interview Preparation Tips

Interview preparation tips for other job seekers - Niterra India Best MNCs
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Jun 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(21 Questions)

  • Q1. Tell me about your self
  • Q2. What's is this 5s and fifo
  • Ans. 

    5S is a workplace organization method that focuses on creating a clean and efficient work environment. FIFO stands for First In, First Out and is a method used to manage inventory and ensure older items are used or sold first.

    • 5S is a methodology for organizing and maintaining a clean and efficient workplace.

    • It involves five steps: Sort, Set in Order, Shine, Standardize, and Sustain.

    • FIFO is a method used to manage inven...

  • Answered by AI
  • Q3. What's is this oee calculation
  • Ans. 

    OEE (Overall Equipment Efficiency) is a calculation used to measure the effectiveness of a production process.

    • OEE is a metric that combines availability, performance, and quality to assess the overall efficiency of equipment or a production line.

    • It is calculated by multiplying the availability, performance, and quality factors together.

    • OEE provides insights into how well the equipment is being utilized and identifies a...

  • Answered by AI
  • Q4. What's is this TPM-JH
  • Ans. 

    TPM-JH stands for Total Productive Maintenance - Jishu Hozen.

    • TPM-JH is a maintenance methodology used in manufacturing industries.

    • It focuses on maximizing equipment effectiveness and minimizing downtime.

    • TPM-JH involves proactive maintenance activities and employee involvement.

    • It aims to improve overall equipment efficiency and reduce defects.

    • Examples of TPM-JH techniques include autonomous maintenance and planned maint

  • Answered by AI
  • Q5. What's is 7Qc tools
  • Ans. 

    7QC tools are a set of quality control tools used in production engineering to identify and solve quality-related issues.

    • 7QC tools are also known as the 7 basic tools of quality.

    • These tools are used to analyze data, identify problems, and make data-driven decisions.

    • Examples of 7QC tools include Pareto charts, cause-and-effect diagrams, control charts, and scatter diagrams.

    • These tools help in improving process efficienc...

  • Answered by AI
  • Q6. What's is your job responsibilities
  • Q7. What's is your previous Organisation working
  • Q8. What's is 6 sigma
  • Ans. 

    Six Sigma is a data-driven methodology used to improve business processes by reducing defects and variability.

    • Six Sigma aims to achieve near-perfect quality by minimizing process variation.

    • It uses statistical analysis to identify and eliminate sources of defects.

    • The goal is to reduce defects to a level of 3.4 per million opportunities.

    • Six Sigma follows a structured approach known as DMAIC: Define, Measure, Analyze, Imp...

  • Answered by AI
  • Q9. What is bakido and chokorate
  • Ans. 

    Bakido and chokorate are not recognized terms in the field of production engineering.

    • Bakido and chokorate are not commonly used terms in production engineering.

    • There is no known definition or explanation for bakido and chokorate in the context of production engineering.

    • It is possible that the interviewer made a mistake or was referring to something unrelated to the field.

  • Answered by AI
  • Q10. What is this kaizen
  • Ans. 

    Kaizen is a Japanese term meaning continuous improvement. It refers to the philosophy of making small, incremental changes to improve processes and systems.

    • Kaizen is a key principle of Lean manufacturing and Six Sigma methodologies.

    • It involves identifying and eliminating waste, reducing defects, and improving efficiency.

    • Kaizen encourages employee involvement and empowerment in the improvement process.

    • Examples of kaizen...

  • Answered by AI
  • Q11. What's is this PPLH
  • Ans. 

    PPLH stands for Pilot Proficiency and Learning Hours.

    • PPLH is a measure of the time a pilot spends on training and practicing to improve their skills.

    • It includes both flight hours and ground-based learning activities.

    • PPLH is important for maintaining and enhancing pilot proficiency and safety.

    • Examples of PPLH activities include simulator sessions, classroom instruction, and flight training exercises.

  • Answered by AI
  • Q12. What's is this PPM
  • Ans. 

    PPM stands for Parts Per Million, a unit used to measure the concentration of a substance in a solution or mixture.

    • PPM is a ratio of the number of parts of a substance to one million parts of the solution or mixture.

    • It is commonly used in various industries, such as manufacturing, environmental monitoring, and quality control.

    • For example, in manufacturing, PPM can be used to measure the defect rate in a production proc...

  • Answered by AI
  • Q13. What is this manpower handling
  • Ans. 

    Manpower handling refers to the management and coordination of human resources in a production environment.

    • Manpower handling involves tasks such as workforce planning, recruitment, training, and performance management.

    • It also includes assigning tasks, monitoring progress, and ensuring a safe and productive work environment.

    • Effective manpower handling is crucial for optimizing production processes and meeting production...

  • Answered by AI
  • Q14. What is this rejection analysis
  • Ans. 

    Rejection analysis is a process of identifying and analyzing the reasons for product rejection or failure.

    • Rejection analysis helps in identifying the root causes of product rejection or failure.

    • It involves collecting and analyzing data related to rejected products.

    • The analysis helps in implementing corrective actions to prevent future rejections.

    • Rejection analysis can involve various techniques such as statistical anal...

  • Answered by AI
  • Q15. What's is this Instruments knowledge
  • Ans. 

    Instruments knowledge refers to the understanding and familiarity with various tools and equipment used in production engineering.

    • Knowledge of different types of instruments used in production engineering

    • Understanding of how to operate and calibrate instruments

    • Ability to troubleshoot and maintain instruments

    • Knowledge of safety protocols and regulations related to instrument usage

    • Familiarity with software and computer s...

  • Answered by AI
  • Q16. What is this actually man power
  • Ans. 

    Manpower refers to the total number of workers or employees in a company or organization.

    • Manpower is a term used to describe the human resources or workforce available in a company.

    • It includes all the employees, workers, and staff members who contribute to the production process.

    • Manpower is an important factor in determining the productivity and efficiency of a company.

    • It can be measured in terms of the number of emplo...

  • Answered by AI
  • Q17. What's is this 5 human weekness
  • Ans. 

    The 5 human weaknesses are fear, greed, laziness, ignorance, and ego.

    • Fear: Humans are often driven by fear, which can limit their actions and decision-making.

    • Greed: The desire for more can lead to unethical behavior and a lack of contentment.

    • Laziness: Humans have a tendency to procrastinate and avoid hard work.

    • Ignorance: Lack of knowledge or awareness can hinder growth and understanding.

    • Ego: The need for validation and...

  • Answered by AI
  • Q18. What is this capa
  • Ans. 

    CAPA stands for Corrective and Preventive Action. It is a systematic approach to identify, investigate, and resolve issues in production processes.

    • CAPA is used to address non-conformities, deviations, and other problems in production.

    • It involves identifying the root cause of the issue, implementing corrective actions, and preventing recurrence.

    • CAPA helps improve product quality, reduce defects, and enhance overall effi...

  • Answered by AI
  • Q19. What is this preventive maintenance
  • Ans. 

    Preventive maintenance is a proactive approach to maintenance that involves regularly scheduled inspections, repairs, and replacements to prevent equipment failure.

    • Preventive maintenance aims to identify and address potential issues before they cause equipment breakdowns or failures.

    • It involves creating a maintenance schedule and following it consistently.

    • Regular inspections, lubrication, cleaning, and calibration are ...

  • Answered by AI
  • Q20. Which are you used documents in this company
  • Q21. What is this family background

Interview Preparation Tips

Interview preparation tips for other job seekers - Focused in working after applying his working knowledge. And self discipline
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed before Sep 2023. There was 1 interview round.

Round 1 - Technical 

(3 Questions)

  • Q1. Good opportunity for carriers
  • Q2. Growth to company’s
  • Q3. Growth to himself
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(3 Questions)

  • Q1. Tell me some person shelf
  • Ans. 

    I'm sorry, but I don't understand the question. Could you please rephrase it?

    • Please clarify the question

    • I'm not sure what you mean by 'person shelf'

    • Could you provide more context or information?

  • Answered by AI
  • Q2. In which industry working
  • Q3. Why are you leaving this industry
Round 3 - Technical 

(5 Questions)

  • Q1. Tell me about your shelf
  • Q2. Tell me what is your roll in industry
  • Q3. What actually working on this industry
  • Q4. Tell me your current salary
  • Q5. Tell me your expected salary

Interview Preparation Tips

Interview preparation tips for other job seekers - Full confidence on yourself in interview

I applied via Naukri.com and was interviewed in May 2022. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. General Information, Current Market Scenario
Round 3 - Technical 

(2 Questions)

  • Q1. Totally Depends on Paste Experience, projects, Automation
  • Q2. Future goals and Improvements
Round 4 - HR 

(1 Question)

  • Q1. Training Related Questions salary Discussion

Interview Preparation Tips

Topics to prepare for Tata Toyo Radiator Production Engineer interview:
  • TPM Implementation
  • QC Tools
  • Pokayok
Interview preparation tips for other job seekers - Keep Motivating yourself, Prepare Youself Everytime Keep focusing on Your DWM Improve Technical Skills

Dynapac Interview FAQs

How many rounds are there in Dynapac Product Specialist interview?
Dynapac interview process usually has 3 rounds. The most common rounds in the Dynapac interview process are Resume Shortlist, Technical and One-on-one Round.
How to prepare for Dynapac Product Specialist interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Dynapac. The most common topics and skills that interviewers at Dynapac expect are After Market Service, Communication Skills, Customer Interaction, Dealer Management and Electricals.
What are the top questions asked in Dynapac Product Specialist interview?

Some of the top questions asked at the Dynapac Product Specialist interview -

  1. What are compaction method? Describe Frequency, amplitude and centrifugal force...read more
  2. Brief on Past experience and prompt decission to up brakedown machi...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

Caterpillar Inc Interview Questions
4.2
 • 178 Interviews
JCB Interview Questions
4.0
 • 123 Interviews
Linde India Interview Questions
4.0
 • 45 Interviews
Omaxe Interview Questions
4.1
 • 35 Interviews
SMC Corporation Interview Questions
3.7
 • 27 Interviews
HYT Engineering Interview Questions
3.2
 • 24 Interviews
Plastic Omnium Interview Questions
3.7
 • 24 Interviews
Air Liquide Interview Questions
3.8
 • 22 Interviews
View all
Assembly Technician
23 salaries
unlock blur

₹2 L/yr - ₹4 L/yr

Design Engineer
19 salaries
unlock blur

₹4 L/yr - ₹9 L/yr

Junior Engineer
14 salaries
unlock blur

₹4.5 L/yr - ₹8.4 L/yr

Team Lead
12 salaries
unlock blur

₹4.7 L/yr - ₹11.2 L/yr

Assembly Engineer
11 salaries
unlock blur

₹4 L/yr - ₹9.6 L/yr

Explore more salaries
Compare Dynapac with

Volvo Construction Equipment

4.2
Compare

Caterpillar Inc

4.3
Compare

Komatsu

3.9
Compare

JCB

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview