Filter interviews by
I applied via Recruitment Consulltant
Compaction methods involve applying force to soil to increase its density. Frequency, amplitude, and centrifugal force are key factors.
Frequency refers to the number of times a compactor's plate or roller vibrates per minute.
Amplitude is the distance the plate or roller moves up and down during vibration.
Centrifugal force is the force generated by a rotating compactor that pushes soil outward.
Heavy compaction equipment...
I have experience in identifying breakdown machines and taking prompt decisions to fix them.
I have worked as a product specialist for 3 years and have encountered various breakdowns in machines.
I have developed a keen eye for identifying the root cause of the breakdown and have a good understanding of the machines' working.
I have a systematic approach to troubleshooting and prioritize the issues based on their impact o...
Top trending discussions
posted on 25 Jun 2024
To handle a difficult permanent operator, establish clear expectations, communicate effectively, address issues promptly, provide support and training, and seek to understand their perspective.
Establish clear expectations for performance and behavior.
Communicate effectively and regularly to address any concerns or issues.
Address problems promptly and professionally to prevent escalation.
Provide support, training, and r...
DWM activities refer to Daily Work Management activities, which involve planning, organizing, and monitoring daily tasks to ensure efficiency and productivity.
Creating daily work schedules for production team members
Assigning tasks and responsibilities to team members
Monitoring progress and addressing any issues that arise
Implementing improvements to streamline processes
Ensuring adherence to safety protocols and qualit
TPM stands for Total Productive Maintenance, a proactive approach to maintenance that aims to maximize equipment effectiveness.
TPM focuses on preventing equipment breakdowns through regular maintenance and employee involvement.
It involves setting up autonomous maintenance teams to perform routine tasks and inspections.
TPM also includes planned maintenance, quality maintenance, and focused improvement activities.
The goa...
OEE stands for Overall Equipment Effectiveness, a measure of how well a manufacturing process is utilized.
OEE is calculated by multiplying Availability, Performance, and Quality percentages.
Availability measures the percentage of time the equipment is available for production.
Performance measures the speed at which the equipment runs compared to its maximum speed.
Quality measures the percentage of good parts produced c...
posted on 20 Oct 2024
I applied via Walk-in and was interviewed in Apr 2024. There was 1 interview round.
Insulators are materials that do not easily allow the flow of electricity, while conductors are materials that allow the flow of electricity.
Insulators have high resistance to electrical current.
Conductors have low resistance to electrical current.
Examples of insulators: rubber, glass, plastic.
Examples of conductors: copper, aluminum, gold.
I was interviewed in Aug 2024.
English, maths and puzzles basic preparation.
Question
Add four work before work,guard to make meaningful word
posted on 18 Feb 2024
I applied via Naukri.com and was interviewed in Aug 2023. There was 1 interview round.
Performance rate is 97%
Performance rate = 100% - (100% - 97%) = 3%
Performance rate = 3%
This means the actual performance is 3% below the planned performance
Implement strict quality control measures, identify root causes of rework, provide training to employees, and continuously monitor and improve processes.
Implement strict quality control measures to catch errors early on
Identify root causes of rework to address underlying issues
Provide training to employees to improve skills and reduce errors
Continuously monitor and improve processes to prevent rework
Utilize data analys
I improve my productivity rate by setting clear goals, prioritizing tasks, utilizing time management techniques, and continuously seeking ways to streamline processes.
Setting clear goals to stay focused and motivated
Prioritizing tasks based on importance and deadlines
Utilizing time management techniques such as the Pomodoro technique or Eisenhower matrix
Seeking ways to streamline processes through automation or optimiz...
Labor cost can be decreased by implementing automation, optimizing processes, outsourcing non-core tasks, and cross-training employees.
Implement automation to reduce manual labor requirements
Optimize processes to increase efficiency and reduce labor hours
Outsource non-core tasks to lower cost regions or specialized vendors
Cross-train employees to handle multiple roles and tasks effectively
To reduce change over frequency, implement standardized work procedures, improve equipment reliability, optimize scheduling, and minimize setup times.
Implement standardized work procedures to ensure consistency and efficiency during changeovers
Improve equipment reliability to reduce downtime and increase productivity
Optimize scheduling to minimize changeover frequency and maximize production time
Minimize setup times by...
DWM stands for Daily Work Management, which involves planning, organizing, and executing daily tasks to ensure efficient production operations.
DWM involves creating daily schedules for production activities
It includes assigning tasks to team members and monitoring progress
Regularly updating and adjusting plans based on production needs
Examples: setting up daily production targets, coordinating with different department
Performance is dependent on various factors, not just availability.
Performance is influenced by factors such as skill level, experience, resources, and support.
Availability is just one aspect that can impact performance, but it is not the sole determinant.
For example, even if availability is high, performance may still be low if other factors are not optimal.
Listen to the complaint, empathize with the customer, investigate the issue, offer a solution, follow up to ensure satisfaction.
Listen actively to the customer's complaint without interrupting
Empathize with the customer and acknowledge their frustration
Investigate the issue to understand the root cause
Offer a solution that addresses the customer's concerns
Follow up with the customer to ensure their satisfaction with th
To manage abnormal conditions, prioritize safety, assess the situation, take corrective actions, and communicate effectively.
Prioritize safety of personnel and equipment
Assess the situation to understand the root cause
Take corrective actions promptly to mitigate the abnormal condition
Communicate effectively with team members and stakeholders
Implement preventive measures to avoid recurrence
I applied via Recruitment Consulltant and was interviewed before Apr 2021. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in Jun 2023. There were 2 interview rounds.
5S is a workplace organization method that focuses on creating a clean and efficient work environment. FIFO stands for First In, First Out and is a method used to manage inventory and ensure older items are used or sold first.
5S is a methodology for organizing and maintaining a clean and efficient workplace.
It involves five steps: Sort, Set in Order, Shine, Standardize, and Sustain.
FIFO is a method used to manage inven...
OEE (Overall Equipment Efficiency) is a calculation used to measure the effectiveness of a production process.
OEE is a metric that combines availability, performance, and quality to assess the overall efficiency of equipment or a production line.
It is calculated by multiplying the availability, performance, and quality factors together.
OEE provides insights into how well the equipment is being utilized and identifies a...
TPM-JH stands for Total Productive Maintenance - Jishu Hozen.
TPM-JH is a maintenance methodology used in manufacturing industries.
It focuses on maximizing equipment effectiveness and minimizing downtime.
TPM-JH involves proactive maintenance activities and employee involvement.
It aims to improve overall equipment efficiency and reduce defects.
Examples of TPM-JH techniques include autonomous maintenance and planned maint
7QC tools are a set of quality control tools used in production engineering to identify and solve quality-related issues.
7QC tools are also known as the 7 basic tools of quality.
These tools are used to analyze data, identify problems, and make data-driven decisions.
Examples of 7QC tools include Pareto charts, cause-and-effect diagrams, control charts, and scatter diagrams.
These tools help in improving process efficienc...
Six Sigma is a data-driven methodology used to improve business processes by reducing defects and variability.
Six Sigma aims to achieve near-perfect quality by minimizing process variation.
It uses statistical analysis to identify and eliminate sources of defects.
The goal is to reduce defects to a level of 3.4 per million opportunities.
Six Sigma follows a structured approach known as DMAIC: Define, Measure, Analyze, Imp...
Bakido and chokorate are not recognized terms in the field of production engineering.
Bakido and chokorate are not commonly used terms in production engineering.
There is no known definition or explanation for bakido and chokorate in the context of production engineering.
It is possible that the interviewer made a mistake or was referring to something unrelated to the field.
Kaizen is a Japanese term meaning continuous improvement. It refers to the philosophy of making small, incremental changes to improve processes and systems.
Kaizen is a key principle of Lean manufacturing and Six Sigma methodologies.
It involves identifying and eliminating waste, reducing defects, and improving efficiency.
Kaizen encourages employee involvement and empowerment in the improvement process.
Examples of kaizen...
PPLH stands for Pilot Proficiency and Learning Hours.
PPLH is a measure of the time a pilot spends on training and practicing to improve their skills.
It includes both flight hours and ground-based learning activities.
PPLH is important for maintaining and enhancing pilot proficiency and safety.
Examples of PPLH activities include simulator sessions, classroom instruction, and flight training exercises.
PPM stands for Parts Per Million, a unit used to measure the concentration of a substance in a solution or mixture.
PPM is a ratio of the number of parts of a substance to one million parts of the solution or mixture.
It is commonly used in various industries, such as manufacturing, environmental monitoring, and quality control.
For example, in manufacturing, PPM can be used to measure the defect rate in a production proc...
Manpower handling refers to the management and coordination of human resources in a production environment.
Manpower handling involves tasks such as workforce planning, recruitment, training, and performance management.
It also includes assigning tasks, monitoring progress, and ensuring a safe and productive work environment.
Effective manpower handling is crucial for optimizing production processes and meeting production...
Rejection analysis is a process of identifying and analyzing the reasons for product rejection or failure.
Rejection analysis helps in identifying the root causes of product rejection or failure.
It involves collecting and analyzing data related to rejected products.
The analysis helps in implementing corrective actions to prevent future rejections.
Rejection analysis can involve various techniques such as statistical anal...
Instruments knowledge refers to the understanding and familiarity with various tools and equipment used in production engineering.
Knowledge of different types of instruments used in production engineering
Understanding of how to operate and calibrate instruments
Ability to troubleshoot and maintain instruments
Knowledge of safety protocols and regulations related to instrument usage
Familiarity with software and computer s...
Manpower refers to the total number of workers or employees in a company or organization.
Manpower is a term used to describe the human resources or workforce available in a company.
It includes all the employees, workers, and staff members who contribute to the production process.
Manpower is an important factor in determining the productivity and efficiency of a company.
It can be measured in terms of the number of emplo...
The 5 human weaknesses are fear, greed, laziness, ignorance, and ego.
Fear: Humans are often driven by fear, which can limit their actions and decision-making.
Greed: The desire for more can lead to unethical behavior and a lack of contentment.
Laziness: Humans have a tendency to procrastinate and avoid hard work.
Ignorance: Lack of knowledge or awareness can hinder growth and understanding.
Ego: The need for validation and...
CAPA stands for Corrective and Preventive Action. It is a systematic approach to identify, investigate, and resolve issues in production processes.
CAPA is used to address non-conformities, deviations, and other problems in production.
It involves identifying the root cause of the issue, implementing corrective actions, and preventing recurrence.
CAPA helps improve product quality, reduce defects, and enhance overall effi...
Preventive maintenance is a proactive approach to maintenance that involves regularly scheduled inspections, repairs, and replacements to prevent equipment failure.
Preventive maintenance aims to identify and address potential issues before they cause equipment breakdowns or failures.
It involves creating a maintenance schedule and following it consistently.
Regular inspections, lubrication, cleaning, and calibration are ...
I applied via Company Website and was interviewed before Sep 2023. There was 1 interview round.
posted on 17 May 2022
I'm sorry, but I don't understand the question. Could you please rephrase it?
Please clarify the question
I'm not sure what you mean by 'person shelf'
Could you provide more context or information?
posted on 26 Jun 2022
I applied via Naukri.com and was interviewed in May 2022. There were 4 interview rounds.
Assembly Technician
23
salaries
| ₹2 L/yr - ₹4 L/yr |
Design Engineer
19
salaries
| ₹4 L/yr - ₹9 L/yr |
Junior Engineer
14
salaries
| ₹4.5 L/yr - ₹8.4 L/yr |
Team Lead
12
salaries
| ₹4.7 L/yr - ₹11.2 L/yr |
Assembly Engineer
11
salaries
| ₹4 L/yr - ₹9.6 L/yr |
Volvo Construction Equipment
Caterpillar Inc
Komatsu
JCB