i
Dwello
Filter interviews by
I applied via Approached by Company and was interviewed in Oct 2022. There were 3 interview rounds.
Highlight the benefits of a newly constructed flat and emphasize the quality and modern amenities it offers.
Emphasize the quality of construction and modern amenities in the newly constructed flat.
Highlight the advantages of a new property such as lower maintenance costs, energy efficiency, and warranty on construction.
Explain the potential for appreciation in value over time due to being a new property.
Discuss the pea...
The profit percentage will be 12.68%.
Calculate the profit by subtracting the buying price from the selling price: 80lacs - 71lacs = 9lacs
Calculate the profit percentage by dividing the profit by the buying price and multiplying by 100: (9lacs / 71lacs) * 100 = 12.68%
RERA is Real Estate (Regulation and Development) Act, aimed at regulating the real estate sector in India.
RERA mandates transparency in real estate projects to protect the interests of buyers.
It ensures timely completion of projects and prevents fraudulent practices.
For clients, RERA provides a sense of security and confidence in investing in real estate.
For developers, it may increase compliance costs and paperwork, b...
Top trending discussions
I applied via Company Website and was interviewed in Nov 2024. There was 1 interview round.
I appeared for an interview in Nov 2024.
I applied via Walk-in and was interviewed before Jan 2023. There was 1 interview round.
The painting quantity and type of paint depend on the project requirements and specifications.
The painting quantity is determined by the surface area to be painted and the number of coats required.
The type of paint depends on factors such as the surface material, desired finish, and environmental conditions.
Common types of paint include acrylic, latex, oil-based, and epoxy paints.
The quantity and type of paint may vary...
Bar bending schedule is a document that provides details about the reinforcement steel bars used in a construction project.
Bar bending schedule (BBS) is prepared by a structural engineer or a detailer.
It includes information about the size, shape, and quantity of reinforcement bars required for each structural element.
BBS helps in estimating the amount of steel required, ordering materials, and ensuring proper placemen...
Block work quantity can be calculated by measuring the dimensions of the blocks and the area to be covered.
Measure the length, width, and height of the blocks
Calculate the volume of each block by multiplying the length, width, and height
Determine the area to be covered by measuring the length and height of the wall
Divide the area by the volume of each block to get the quantity needed
Consider adding extra blocks for was
I appeared for an interview before Feb 2024.
General IQ questions
I appeared for an interview before Feb 2024.
General questions related to general knowledge.
I appeared for an interview in Jan 2025.
Fundamental logical inquiries.
I am a dedicated and experienced Project Engineer with a strong background in managing engineering projects from conception to completion.
Bachelor's degree in Engineering
5+ years of experience in project management
Proficient in project planning and scheduling software such as Microsoft Project
Strong communication and leadership skills
Experience working on large-scale construction projects, such as building a new hospit
I have over 5 years of experience in project engineering, including managing multiple projects simultaneously.
Managed various projects from conception to completion
Coordinated with cross-functional teams to ensure project milestones were met
Implemented cost-saving measures to stay within budget
Utilized project management software to track progress and communicate with stakeholders
I led a project to design and implement a new wastewater treatment system for a manufacturing plant.
Researched different wastewater treatment technologies
Collaborated with vendors to select the best equipment for the plant's needs
Designed the layout of the treatment system
Managed the installation and testing of the system
Ensured compliance with environmental regulations
Qualifications for a Project Engineer typically include a bachelor's degree in engineering, relevant work experience, strong technical skills, and project management abilities.
Bachelor's degree in engineering or related field
Relevant work experience in engineering or project management
Strong technical skills in areas such as CAD software, data analysis, and problem-solving
Project management abilities including planning...
Aptitude questions involved reasoning questions
Slump cone test is used to measure the workability of concrete mix.
Determines the consistency and flowability of concrete mix
Helps in ensuring the concrete is of the desired quality and strength
Used to assess the water-cement ratio in the mix
Commonly used in construction projects to monitor the quality of concrete being used
Some of the top questions asked at the Dwello Associate Consultant interview for experienced candidates -
based on 1 interview
Interview experience
Real Estate Consultant
34
salaries
| ₹3 L/yr - ₹6 L/yr |
Sales Consultant
21
salaries
| ₹3 L/yr - ₹5.1 L/yr |
Consultant
19
salaries
| ₹3.1 L/yr - ₹6 L/yr |
Senior Consultant
18
salaries
| ₹4.3 L/yr - ₹10 L/yr |
Team Lead
13
salaries
| ₹8 L/yr - ₹13.5 L/yr |
Omaxe
Runwal Group
Mahindra Lifespace Developers
Realty Assistant