Q1. What is the formula of cutting length of helical stirrup ?
The formula for cutting length of helical stirrup is 2πr + 2L + 10d.
The helical stirrup is used to provide lateral support to columns and beams.
The cutting length is calculated by adding the circumference of the helix to the length of the straight bars.
The diameter of the bar is also taken into consideration in the formula.
The formula is 2πr + 2L + 10d, where r is the radius of the helix, L is the length of the straight bars, and d is the diameter of the bar.
The cutting lengt...read more
Q2. How much deduction is made at the time of shuttering work measurement?
Deduction for shuttering work measurement varies from project to project and depends on the contract agreement.
Deduction is usually made for the thickness of the shuttering material used.
The percentage of deduction can range from 5% to 15% depending on the project.
The contract agreement should specify the percentage of deduction for shuttering work measurement.
The deduction is made to account for the volume of the shuttering material used, which is not part of the final struc...read more
Q3. How much quantity of putty required for 1 sqm work?
The quantity of putty required for 1 sqm work depends on the thickness of the putty layer.
The thickness of the putty layer can vary from 1mm to 3mm.
For a 1mm thick layer, approximately 0.5 kg of putty is required for 1 sqm work.
For a 2mm thick layer, approximately 1 kg of putty is required for 1 sqm work.
For a 3mm thick layer, approximately 1.5 kg of putty is required for 1 sqm work.
Q4. What are the documents required to add with contractor bill?
The documents required to add with contractor bill include measurement book, work order, completion certificate, and any other relevant documents.
Measurement book
Work order
Completion certificate
Relevant documents
Q5. What is the present labour rate of brick work?
The present labour rate of brick work varies depending on factors such as location, complexity of the project, and market conditions.
Labour rates for brick work can range from $10 to $30 per square foot.
Rates may be higher in urban areas compared to rural areas.
Complex brick work designs or intricate patterns may command higher labour rates.
Labour rates can also be influenced by the availability of skilled bricklayers in the market.
It is advisable to obtain quotes from local ...read more
Q6. What is the material & labour rate of flooring work?
The material & labour rate of flooring work varies depending on the type of flooring and location.
The material cost can vary based on the type of flooring material used such as tiles, marble, wood, etc.
The labour cost can vary based on the location and availability of skilled workers.
The cost can also vary based on the size of the flooring area and complexity of the design.
The rates can be obtained from local suppliers and contractors or through online research.
For example, t...read more
Q7. How much cft wood required for door frame?
The amount of cft wood required for a door frame depends on the size of the frame.
The standard size of a door frame is 7 feet by 3 feet.
For a standard size door frame, approximately 20 cft of wood is required.
The type of wood used can also affect the amount required.
It is important to factor in any additional wood needed for hinges and locks.
Q8. How to prepare a costing of any project?
To prepare a costing of any project, one needs to consider various factors such as materials, labor, equipment, and overhead costs.
Identify the scope of work and project requirements
Determine the quantity and cost of materials needed
Estimate the labor costs based on the scope of work and required skill level
Calculate the equipment costs, including rental or purchase costs and maintenance expenses
Include overhead costs such as insurance, permits, and administrative expenses
Pre...read more
Q9. What is the rate of aluminium door window work?
The rate of aluminium door window work varies depending on several factors.
The rate can vary based on the type of aluminium used, the size of the window or door, and the complexity of the design.
The location of the project can also affect the rate.
On average, the rate can range from $200 to $500 per square meter.
It is important to get a detailed quote from a contractor before starting the work.
Q10. How do you prepare a budget?
A budget is prepared by identifying all the expenses and income for a specific period of time.
Identify all the expenses and income for the period
Categorize the expenses and income
Estimate the amount for each category
Allocate funds accordingly
Regularly monitor and adjust the budget as needed
Q11. Multifunction factor of painting work on MS railling ?
Painting work on MS railing has multifunctional factors.
Painting protects the MS railing from corrosion and rusting.
It enhances the aesthetic appeal of the railing.
Painting also makes the railing more visible, improving safety.
The type of paint used can affect the durability and maintenance requirements.
The cost of painting work should be factored into the overall project budget.
Q12. How do you check contractor billing?
Contractor billing is checked by verifying the work done, materials used, and comparing it with the contract terms.
Verify the work done by visiting the site and checking the progress
Check the materials used and ensure they are of the specified quality
Compare the billing with the contract terms and ensure there are no discrepancies
Ensure that the billing is in line with the project schedule and milestones
Check for any additional charges or variations and ensure they are justif...read more
Q13. How do you prepare BOQ?
BOQ is prepared by analyzing drawings and specifications, measuring quantities, and pricing them.
Analyze drawings and specifications to identify items to be included in BOQ
Measure quantities of each item using standard units of measurement
Price each item based on market rates and specifications
Sum up the prices to arrive at the total cost of the project
Include contingencies and taxes as applicable
Q14. How do you plan procurement of construction materials?
I plan procurement of construction materials by analyzing project requirements, creating a detailed material list, obtaining quotes from suppliers, negotiating prices, and ensuring timely delivery.
Analyze project requirements to determine the quantity and type of materials needed
Create a detailed material list specifying the required quantities, specifications, and quality standards
Obtain quotes from multiple suppliers to compare prices and quality of materials
Negotiate with ...read more
Q15. Do you know quantity survey?
Yes, Quantity Survey is a process of estimating and managing costs related to construction projects.
Quantity Survey involves estimating and managing costs related to construction projects
It includes preparing bills of quantities, cost estimates, and tender documents
Quantity Surveyors also manage contracts and ensure projects are completed within budget
They work closely with architects, engineers, and contractors to ensure project success
Q16. What was Modular floor cycle in your last project?
Modular floor cycle is a construction method where floors are built in sections off-site and then assembled on-site.
Modular floor cycle involves prefabricating floor sections off-site
These sections are then transported to the construction site for assembly
This method can help speed up construction timelines and improve quality control
Q17. What is Total Float and Free Float?
Total Float is the amount of time an activity can be delayed without delaying the project completion date, while Free Float is the amount of time an activity can be delayed without delaying the early start of any successor activity.
Total Float is the amount of time an activity can be delayed without delaying the project completion date.
Free Float is the amount of time an activity can be delayed without delaying the early start of any successor activity.
Total Float = Late Fini...read more
Q18. HOW DO YOU HELP DTC TO CREATE A BENCHMARK AS AN EMPLOYEE?
As a Liaison Manager, I help DTC create a benchmark by establishing strong relationships with stakeholders, implementing effective communication strategies, and continuously monitoring and improving processes.
Building strong relationships with stakeholders to understand their needs and expectations
Implementing effective communication strategies to ensure clear and consistent messaging
Monitoring and analyzing key performance indicators to identify areas for improvement
Collabor...read more
Q19. What are the responsibilities of an site engineer??
Site engineers are responsible for overseeing construction projects, managing workers, ensuring safety regulations are followed, and coordinating with various stakeholders.
Managing construction projects from start to finish
Supervising and coordinating construction workers
Ensuring safety regulations and building codes are followed
Collaborating with architects, engineers, and subcontractors
Preparing and presenting progress reports to stakeholders
Q20. How to handle an irrate client ?
Listen actively, empathize, apologize, offer solutions, and follow up.
Remain calm and professional
Listen actively and let the client vent
Empathize with their situation and apologize for any inconvenience
Offer solutions to resolve the issue
Follow up with the client to ensure their satisfaction
Q21. What is FMS Process?
FMS Process stands for Flexible Manufacturing System Process, which is a manufacturing system that is capable of producing a variety of products with minimal manual intervention.
FMS Process involves the use of computer-controlled equipment and automated systems to produce a wide range of products.
It allows for quick changeovers between different product types, making it ideal for high-mix, low-volume production.
FMS Process can improve efficiency, reduce lead times, and increa...read more
Q22. Internal plaster thickness and ratio?
Internal plaster thickness and ratio are important factors in construction projects.
The standard thickness of internal plaster is usually 12mm for walls and 15mm for ceilings.
The ratio of internal plaster is typically 1:6 (1 part cement to 6 parts sand).
The thickness and ratio may vary depending on the specific requirements of the project and the type of surface being plastered.
Q23. External Plaster thickness and ratio?
External plaster thickness and ratio are determined based on the type of surface and desired finish.
External plaster thickness typically ranges from 12mm to 20mm depending on the surface condition.
The ratio of external plaster mix is usually 1:4 (cement:sand) for rough surfaces and 1:6 for smooth finishes.
For better adhesion, a bonding agent may be added to the plaster mix.
Proper curing is essential to ensure the strength and durability of the plaster.
Q24. H R Employee Recruitment process ?
HR employee recruitment process involves sourcing, screening, interviewing, and selecting candidates for job openings.
Sourcing candidates through job boards, social media, referrals, and recruitment agencies
Screening resumes to shortlist qualified candidates
Conducting interviews to assess skills, experience, and cultural fit
Selecting the best candidate and extending a job offer
Onboarding the new employee and facilitating their integration into the organization
Q25. Process of slab checking?
Slab checking involves verifying the structural integrity and load-bearing capacity of concrete slabs.
Check for proper reinforcement placement and spacing
Verify concrete mix design and curing process
Inspect for any cracks or defects
Ensure slab thickness meets design specifications
Perform load testing if necessary
Q26. Copairesion in real-estate field
Comparison in real estate involves evaluating properties based on various factors like location, size, amenities, and market trends.
Comparing properties based on location, such as proximity to schools, shopping centers, and public transportation
Evaluating properties based on size, number of bedrooms and bathrooms, and overall square footage
Considering amenities like swimming pools, gyms, and security features
Analyzing market trends such as property values, rental rates, and d...read more