I applied via Approached by Company and was interviewed in Oct 2022.Ā There were 2 interview rounds.
To check the label, inspect the information printed on it for accuracy and completeness.
Verify that all required information is present on the label, such as product name, ingredients, warnings, and usage instructions.
Ensure that the label is legible and easy to read.
Check for any spelling or grammatical errors on the label.
Confirm that the label meets any regulatory requirements or industry standards.
Compare the label...
To check good harnesses, inspect for proper connections, secure fastenings, correct wire routing, and absence of damage or wear.
Inspect for proper connections between wires and connectors.
Check for secure fastenings, such as properly tightened screws or clamps.
Ensure correct wire routing, with wires organized and protected from potential damage.
Look for any signs of damage or wear, such as frayed wires or broken insula...
The problem mouth press refers to an issue with the pressing mechanism of a machine used in quality inspection.
The problem could be related to a malfunctioning or misaligned press mechanism.
It could result in inconsistent or incorrect pressure being applied during inspection.
Examples of problems could include a stuck press, uneven pressure distribution, or a faulty sensor.
The issue may lead to inaccurate quality assess
Top trending discussions
I appeared for an interview in Oct 2017.
Questions related to torque, gearbox, torque limiter and coupling failure, yawing system bearing, and accumulator.
Torque is a measure of rotational force.
Gearbox works by transmitting power from the engine to the wheels.
Torque limiter failure can be caused by overloading or overheating.
Coupling failure can be caused by misalignment or excessive torque.
Yawing system bearing is a type of roller bearing used to support th...
I applied via Company Website and was interviewed before Dec 2020.Ā There were 3 interview rounds.
I will ensure clear communication channels are established with remote management and implement effective quality control measures.
Establish clear communication channels with remote management
Implement effective quality control measures
Ensure all team members are aware of quality standards and expectations
Regularly review and assess quality control processes
Utilize technology and software to aid in quality control
Maint...
Initial setting time of cement is the time taken by cement to harden and resist penetration by a standard needle.
Initial setting time is affected by factors like temperature, water-cement ratio, and type of cement.
The standard needle used for testing has a diameter of 1.13 mm and a length of 50 mm.
The initial setting time of ordinary Portland cement is around 30 minutes.
The initial setting time of rapid hardening cemen
Lime test stone test brick test
Basic Study
I applied via Campus Placement and was interviewed in May 2024.Ā There was 1 interview round.
I applied via Company Website and was interviewed in Apr 2021.Ā There was 1 interview round.
I have 2 years of experience in the wind field.
I have worked on wind turbine design and optimization projects.
I have conducted wind resource assessments for potential wind farm sites.
I have experience in analyzing wind data and performing wind flow modeling.
I have knowledge of wind energy conversion systems and their components.
I have worked with software tools like WindPRO and WAsP for wind energy analysis.
based on 18 reviews
Rating in categories
Quality Engineer
324
salaries
| ā¹1.1 L/yr - ā¹4.2 L/yr |
Production Engineer
184
salaries
| ā¹0.9 L/yr - ā¹6 L/yr |
Production Supervisor
96
salaries
| ā¹1 L/yr - ā¹4.6 L/yr |
Graduate Engineer Trainee (Get)
90
salaries
| ā¹1 L/yr - ā¹3 L/yr |
Design Engineer
87
salaries
| ā¹1.5 L/yr - ā¹5 L/yr |
Vestas
Wind World
Siemens Energy
Steag Energy Services