Filter interviews by
Finger cam length can be calculated using the formula: L = (2πr)/n
Determine the radius of the cam
Determine the number of lobes on the cam
Use the formula L = (2πr)/n to calculate the cam length
Ensure that the calculated length is within the acceptable range for the application
Top trending discussions
I applied via Naukri.com and was interviewed in Sep 2020. There were 3 interview rounds.
posted on 6 Aug 2021
I applied via Campus Placement
I applied via Campus Placement and was interviewed in May 2024. There was 1 interview round.
posted on 12 Aug 2022
I applied via Campus Placement and was interviewed in Jul 2022. There were 2 interview rounds.
I applied via Referral and was interviewed in Jun 2024. There were 3 interview rounds.
I am a passionate and experienced Design Engineer with a strong background in mechanical engineering.
Graduated with a degree in Mechanical Engineering
Worked at XYZ Company for 5 years designing innovative products
Proficient in CAD software such as SolidWorks and AutoCAD
Strong problem-solving skills and attention to detail
Collaborated with cross-functional teams to bring projects to completion
Passion for designing structures and solving complex problems led me to choose civil engineering.
Passion for designing structures
Interest in solving complex problems
Desire to contribute to infrastructure development
Fascination with construction projects
Inspiration from iconic architectural landmarks
Water ratio refers to the proportion of water in a mixture or solution.
Water ratio is typically expressed as a percentage or ratio of water to the total mixture.
It is commonly used in various industries such as construction, agriculture, and food production.
For example, a concrete mix may have a water ratio of 0.5, meaning there is half as much water as other ingredients.
The estimation for a 1 BHK varies depending on location, size, amenities, and other factors.
Estimation for 1 BHK can range from $50,000 to $500,000 or more.
Factors affecting the estimation include location (urban vs rural), size of the apartment, amenities provided, and demand in the area.
For example, a 1 BHK in a prime location in a metropolitan city will cost more than a similar apartment in a suburban area.
I applied via Company Website and was interviewed in Aug 2022. There was 1 interview round.
I applied via Naukri.com and was interviewed before Apr 2022. There were 2 interview rounds.
Beam column junction is a connection point between a beam and a column in a structure.
The junction should be designed to transfer loads from the beam to the column without failure.
The connection can be made using bolts, welds, or other mechanical fasteners.
The junction should be designed to resist bending, shear, and axial forces.
Proper detailing of reinforcement is necessary to ensure the strength and stability of the...
IS 1893:2016 is a code of practice for earthquake-resistant design of structures in India.
The code has been revised to include new seismic hazard maps for India
It now includes provisions for seismic design of non-structural components
The code has also introduced new seismic performance levels for buildings
It now requires consideration of soil-structure interaction effects in design
The revised code has updated provision
I appeared for an interview before Mar 2023.
The process of submission for a previous project involves several steps to ensure successful completion.
1. Gather all necessary documentation and materials for the project submission.
2. Fill out any required forms or paperwork accurately and completely.
3. Submit the project through the designated platform or method as specified.
4. Follow up with any additional information or revisions as needed.
5. Confirm receipt of th...
Initial setting time of cement is the time taken by cement to harden and resist penetration by a standard needle.
Initial setting time is affected by factors like temperature, water-cement ratio, and type of cement.
The standard needle used for testing has a diameter of 1.13 mm and a length of 50 mm.
The initial setting time of ordinary Portland cement is around 30 minutes.
The initial setting time of rapid hardening cemen
Lime test stone test brick test
Quality Engineer
325
salaries
| ₹1.1 L/yr - ₹4 L/yr |
Production Engineer
168
salaries
| ₹0.9 L/yr - ₹6 L/yr |
Production Supervisor
96
salaries
| ₹1 L/yr - ₹4.6 L/yr |
Graduate Engineer Trainee (Get)
90
salaries
| ₹1 L/yr - ₹3 L/yr |
Design Engineer
87
salaries
| ₹1.5 L/yr - ₹5.5 L/yr |
Vestas
Wind World
Siemens Energy
Steag Energy Services