Filter interviews by
I applied via Referral and was interviewed before Dec 2022. There were 3 interview rounds.
Relevant answer select one among all four
Allocate the budget to the team based on their needs and priorities.
Identify the needs and priorities of each team member
Consider the goals and objectives of the team
Allocate the budget proportionally based on the importance and urgency of each need
Communicate the budget allocation decisions transparently to the team
Top trending discussions
posted on 17 May 2022
I appeared for an interview before May 2021.
I applied via Referral and was interviewed in Nov 2019. There were 3 interview rounds.
I applied via Approached by Company and was interviewed in Mar 2023. There were 2 interview rounds.
The four levels of NABL documentation are Quality Manual, Quality Procedures, Work Instructions, and Records.
Quality Manual provides an overview of the quality management system.
Quality Procedures outline the processes and steps to be followed for quality assurance.
Work Instructions provide detailed instructions for specific tasks or activities.
Records document the results and evidence of quality control measures taken
Fertiliser is a substance added to soil to improve plant growth and yield.
Fertilisers provide essential nutrients like nitrogen, phosphorus, and potassium to plants.
There are different types of fertilisers such as organic, inorganic, and liquid fertilisers.
Overuse of fertilisers can lead to environmental pollution and harm aquatic life.
Fertilisers can be applied in various forms like granules, powders, or liquids.
Prope...
Fertilisers are substances added to soil to improve plant growth and yield.
Organic fertilisers: derived from plant or animal sources (e.g. manure, compost)
Inorganic fertilisers: manufactured chemically (e.g. ammonium nitrate, superphosphate)
Liquid fertilisers: dissolved in water for easy application
Slow-release fertilisers: nutrients released gradually over time
Specialised fertilisers: tailored for specific plants or s
I applied via Recruitment Consulltant and was interviewed in Jul 2022. There were 4 interview rounds.
Chemical handling requires knowledge of basic properties for safe handling.
Chemicals should be stored in appropriate containers and labeled correctly.
Proper ventilation and personal protective equipment should be used when handling chemicals.
Chemicals should be handled with care and caution to prevent accidents or spills.
Basic properties of chemicals such as flammability, toxicity, and reactivity should be understood b...
I want to join the company because of its strong reputation and growth opportunities.
I am impressed by the company's strong reputation in the industry.
I believe the company offers great growth opportunities for career advancement.
The company's values and culture align with my own professional goals.
I am excited about the company's innovative products/services.
I have heard positive feedback about the company from curren
I applied via Recruitment Consulltant and was interviewed in Jan 2023. There were 3 interview rounds.
I have experience managing teams ranging from 5 to 20 members in previous roles.
Managed a team of 10 sales associates in my previous role
Led a team of 15 customer service representatives in a fast-paced environment
Currently overseeing a team of 8 marketing specialists in my current position
The quantum of monthly billing handled refers to the total amount of billing processed or managed on a monthly basis.
Quantum of monthly billing refers to the total amount of billing processed in a month
It includes all invoices, payments, and financial transactions handled by the individual
This metric is important for tracking financial performance and workload
For example, if the deputy manager handles $1 million in mon...
Methods of repairing honey combing in RCC include chipping out damaged concrete, cleaning the area, applying bonding agent, and then reapplying fresh concrete.
Chipping out the damaged concrete to expose the honey combing
Cleaning the area thoroughly to remove any loose debris
Applying a bonding agent to ensure proper adhesion of the new concrete
Reapplying fresh concrete to fill in the honey combing and create a smooth su
Civil quality is implemented on site through strict adherence to specifications, regular inspections, quality control measures, and proper documentation.
Adherence to project specifications and standards
Regular inspections by quality control team
Implementation of quality control measures such as material testing and concrete sampling
Proper documentation of quality checks and test results
Training of site staff on quality
I will immediately investigate the root cause of the concrete quality failure, take corrective actions, and implement preventive measures to avoid future failures.
Investigate the root cause of the quality failure, such as incorrect mix proportions or improper curing methods
Take immediate corrective actions, such as removing and replacing the faulty concrete or adjusting the mix design
Implement preventive measures, such...
I applied via Naukri.com and was interviewed in Nov 2022. There were 4 interview rounds.
Diagrams are visual representations of information and data.
Flowchart: used to represent a process or system flow
Gantt chart: used to represent project timelines and schedules
Venn diagram: used to show relationships between different sets
Pie chart: used to show proportions of a whole
Bar graph: used to compare data between different categories
Mind map: used to organize and visualize information
ER diagram: used to repres...
TPM stands for Total Productive Maintenance, TQM stands for Total Quality Management, MTTR stands for Mean Time To Repair, and MTBF stands for Mean Time Between Failures.
TPM is a maintenance strategy aimed at maximizing the productivity of equipment by involving all employees in the maintenance process.
TQM is a management approach focused on continuous improvement of quality in all aspects of an organization.
MTTR is th...
I applied via Recruitment Consulltant and was interviewed before Apr 2023. There was 1 interview round.
Estimation is done by analyzing project requirements, breaking down tasks, assigning timeframes, and considering potential risks.
Analyze project requirements to understand scope
Break down tasks into smaller components for accurate estimation
Assign timeframes to each task based on complexity and resources
Consider potential risks and uncertainties that may impact the timeline
Use historical data or industry benchmarks for...
I applied via Walk-in and was interviewed in Oct 2023. There was 1 interview round.
Heat exchangers are designed according to specific codes and standards to ensure safety and efficiency.
Heat exchangers are typically designed according to codes such as ASME, TEMA, and API.
These codes provide guidelines for materials, construction, testing, and inspection of heat exchangers.
For example, ASME Boiler and Pressure Vessel Code provides rules for the design and construction of pressure vessels including hea
Cooling tower design parameters include airflow rate, water flow rate, temperature range, and materials used.
Airflow rate is crucial for heat transfer efficiency.
Water flow rate determines the cooling capacity of the tower.
Temperature range affects the performance of the tower.
Materials used should be corrosion-resistant and durable.
Examples: Fiberglass reinforced plastic (FRP), galvanized steel, stainless steel.
Pressure vessel design codes are standards that provide guidelines for the design, fabrication, inspection, and testing of pressure vessels.
Common pressure vessel design codes include ASME Boiler and Pressure Vessel Code, EN 13445, and PD 5500.
Design codes ensure that pressure vessels are safe, reliable, and meet regulatory requirements.
Engineers must follow the specific requirements outlined in the chosen design code ...
based on 1 interview
Interview experience
based on 3 reviews
Rating in categories
Deputy Manager
79
salaries
| ₹7 L/yr - ₹14.4 L/yr |
Sales Officer
54
salaries
| ₹2.4 L/yr - ₹6.1 L/yr |
Senior Officer
40
salaries
| ₹2.5 L/yr - ₹6 L/yr |
Business Development Officer
35
salaries
| ₹2.4 L/yr - ₹5.6 L/yr |
Sales Executive
30
salaries
| ₹3.7 L/yr - ₹9.5 L/yr |
Aarti Industries
UPL
Coromandel International
PI Industries