Filter interviews by
I applied via Company Website and was interviewed in Apr 2024. There were 3 interview rounds.
Manager technical questions
Top trending discussions
I applied via Walk-in and was interviewed before May 2022. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in Jul 2024. There were 2 interview rounds.
Production development and zero deficit protect manufacturing process
I applied via Walk-in and was interviewed in Dec 2024. There were 5 interview rounds.
Round one discuss to your name address qualification which company experience which department
Round 2 check your check your experience your behaviour
I am currently working on the assembly line for the automotive department.
I am responsible for overseeing the production process on the automotive assembly line.
I ensure that production targets are met and quality standards are maintained.
I work closely with the team to troubleshoot any issues that arise during production.
I implement and enforce safety protocols to ensure a safe working environment.
I track production m
First important test for aptitude.
Provide the challenge of employees
Solve problems within given time frame
Some decisions discuss to subordinate
I applied via Job Fair and was interviewed in Feb 2024. There was 1 interview round.
I appeared for an interview before Jul 2016.
I applied via Other and was interviewed before Oct 2019. There were 3 interview rounds.
I applied via Naukri.com and was interviewed before Mar 2020. There was 1 interview round.
I applied via Naukri.com and was interviewed before Sep 2019. There was 1 interview round.
5S quality is a workplace organization method that aims to improve efficiency and safety.
Sort - separate necessary items from unnecessary ones
Set in order - arrange necessary items in a logical and efficient manner
Shine - clean and maintain the workplace
Standardize - establish procedures and standards for maintaining the workplace
Sustain - ensure that the 5S system is continuously implemented and improved
Example: organ...
The 7 tools in production are used for quality control and process improvement.
Check sheets
Control charts
Histograms
Pareto charts
Scatter diagrams
Flowcharts
Cause-and-effect diagrams
Product inspection involves thorough examination of the product to ensure it meets quality standards.
Identify the specific quality standards for the product
Inspect the product visually for defects or irregularities
Use measuring tools to check dimensions and tolerances
Perform functional tests to ensure the product works as intended
Document any issues found and report to appropriate personnel
The root cause of product A's failure in the last stage can be due to various factors.
The failure could be due to a problem in the manufacturing process.
It could be due to a defect in the raw materials used.
The failure could also be due to a design flaw in the product.
Human error during the production process could also be a cause.
Environmental factors such as temperature or humidity could also play a role.
based on 1 interview
Interview experience
based on 2 reviews
Rating in categories
Assistant Manager
146
salaries
| ₹5.5 L/yr - ₹16.9 L/yr |
Senior Engineer
138
salaries
| ₹4.6 L/yr - ₹12 L/yr |
Assistant Engineer
91
salaries
| ₹2.5 L/yr - ₹7.5 L/yr |
Deputy Manager
68
salaries
| ₹9.6 L/yr - ₹20 L/yr |
Engineer
66
salaries
| ₹3.5 L/yr - ₹8.4 L/yr |
Flex
Foxconn
TE Connectivity
Wistron