Add office photos
Premium Employer

Deloitte

3.8
based on 17.4k Reviews
Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards
Filter interviews by

Ashi Industries Interview Questions and Answers

Updated 5 Feb 2024
Popular Designations

Q1. What metrics are collated in Test results report

Ans.

Test results report collates metrics related to performance, load, stress, and scalability testing.

  • Response time

  • Throughput

  • Error rate

  • CPU usage

  • Memory usage

  • Network usage

  • Concurrent users

  • Transactions per second

  • Peak response time

  • Peak throughput

  • Peak error rate

Add your answer

Q2. Workload modeling, how you will design it

Ans.

Workload modeling involves designing a realistic simulation of user behavior and system usage.

  • Identify user personas and their typical actions

  • Determine the frequency and duration of each action

  • Consider peak usage times and seasonal variations

  • Use real-world data and historical trends to inform the model

  • Validate the model through testing and iteration

Add your answer

Q3. Types of Performance tests you have executed?

Ans.

I have executed load, stress, endurance, spike and scalability tests.

  • Load testing to check system performance under normal and peak load conditions.

  • Stress testing to identify system breaking point and measure its recovery time.

  • Endurance testing to check system performance under sustained load conditions.

  • Spike testing to check system performance under sudden load spikes.

  • Scalability testing to check system performance under increasing load and measure its ability to scale.

Add your answer

Q4. Monitoring tools, you have worked on?

Ans.

I have worked on various monitoring tools such as JMeter, LoadRunner, and Gatling.

  • JMeter for load testing web applications

  • LoadRunner for performance testing client-server applications

  • Gatling for stress testing and real-time monitoring

Add your answer
Discover Ashi Industries interview dos and don'ts from real experiences

Q5. What is performance test plan

Ans.

A performance test plan is a document that outlines the objectives, scope, approach, and resources required for conducting performance testing.

  • Defines the goals and objectives of the performance testing

  • Specifies the scope of the testing, including the systems, components, and functionalities to be tested

  • Outlines the test approach, including the tools, techniques, and methodologies to be used

  • Identifies the performance metrics and success criteria

  • Defines the test environment an...read more

View 1 answer

Q6. Challenges faced in scripting

Ans.

Scripting challenges include dynamic parameters, correlation, and handling complex scenarios.

  • Dynamic parameters require capturing and replacing values in scripts

  • Correlation involves identifying and handling dynamic values in responses

  • Complex scenarios require careful planning and scripting to ensure accurate simulation

  • Debugging and troubleshooting can be time-consuming and require attention to detail

Add your answer
Contribute & help others!
Write a review
Share interview
Contribute salary
Add office photos

Interview Process at Ashi Industries

based on 3 interviews
Interview experience
4.3
Good
View more
Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories

Top Performance Test Engineer Interview Questions from Similar Companies

3.6
 • 16 Interview Questions
View all
Share an Interview
Stay ahead in your career. Get AmbitionBox app
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
70 Lakh+

Reviews

5 Lakh+

Interviews

4 Crore+

Salaries

1 Cr+

Users/Month

Contribute to help millions

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter