Filter interviews by
Clear (1)
posted on 4 May 2019
I applied via Approached by Company and was interviewed in Oct 2018. There were 5 interview rounds.
I was interviewed in Dec 2024.
I am a dedicated Electrical Engineer with a strong background in designing and implementing electrical systems.
Graduated with a degree in Electrical Engineering from XYZ University
Experienced in designing and testing electrical systems for commercial buildings
Proficient in using CAD software for schematic design
Strong problem-solving skills and attention to detail
Completed internships at ABC Engineering firm
The procedure for checking an induction motor involves visual inspection, insulation resistance testing, and running tests.
Perform a visual inspection to check for any physical damage or loose connections.
Conduct insulation resistance testing to ensure the motor windings are not shorted to ground.
Run no-load and full-load tests to check the motor's performance and efficiency.
Check the motor's temperature during operati...
I am a dedicated Electrical Engineer with a strong background in designing and implementing electrical systems.
Graduated with a degree in Electrical Engineering from XYZ University
Experienced in designing and testing electrical systems for commercial buildings
Proficient in using CAD software for schematic design
Strong problem-solving skills and attention to detail
Completed internships at ABC Company and gained hands-on
Procedure to check industrial earthing involves visual inspection, resistance measurement, and continuity testing.
Visually inspect the earthing system for any signs of damage or corrosion.
Measure the resistance of the earthing system using a earth tester to ensure it is within acceptable limits.
Perform continuity testing to ensure all components of the earthing system are properly connected.
Check for proper bonding bet...
It is from the indiabix website
I applied via Walk-in and was interviewed in Nov 2023. There were 3 interview rounds.
Coordination is the process of ensuring that different parts of a system work together effectively.
Coordination involves identifying the different parameters that need to be filled in order to achieve the desired outcome.
These parameters can include things like timing, resource allocation, communication protocols, and more.
Effective coordination requires clear communication, careful planning, and ongoing monitoring and...
posted on 28 Jun 2024
I applied via Company Website and was interviewed before Jun 2023. There was 1 interview round.
posted on 5 Mar 2025
I was interviewed in Feb 2025.
Erecting a power panel involves careful planning, installation, and safety measures to ensure proper functionality and compliance.
1. Site Preparation: Ensure the installation site is clean, level, and free from obstructions.
2. Equipment Check: Verify that all components of the power panel are present and undamaged.
3. Mounting: Securely mount the panel to a wall or a dedicated structure using appropriate fasteners.
4. El...
based on 1 interview
Interview experience
based on 6 reviews
Rating in categories
Assistant Manager
246
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Manager
134
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Officer
87
salaries
| ₹0 L/yr - ₹0 L/yr |
Joint Manager
81
salaries
| ₹0 L/yr - ₹0 L/yr |
Executive
59
salaries
| ₹0 L/yr - ₹0 L/yr |
Grasim Industries
Tata Chemicals
Pidilite Industries
UPL