Filter interviews by
I applied via Job Fair and was interviewed in Sep 2024. There was 1 interview round.
Implementing process control techniques like statistical process control, automation, and optimization to increase production efficiency.
Utilizing statistical process control methods to monitor and analyze production data in real-time
Implementing automation systems to streamline processes and reduce human error
Optimizing production parameters based on data analysis to maximize output
Regularly calibrating equipment and ...
Low purity of final molasses can be caused by various factors such as inadequate purification processes or impurities in the raw materials.
Check the purification processes to ensure they are effective in removing impurities.
Analyze the raw materials used in the production process for any impurities or contaminants.
Consider optimizing the production process to improve the purity of the final molasses.
Consult with expert...
Machine and tools apprattoindone by workers suddenly no fault ofthe machine or tools etc
Yes timelywork because production of the smoothly product any no faulte
Top trending discussions
I applied via Referral and was interviewed before May 2023. There was 1 interview round.
I applied via Recruitment Consultant and was interviewed in May 2021. There were 3 interview rounds.
I appeared for an interview in Oct 2023.
I have 2 years of experience as a Junior Engineer in a manufacturing company.
Worked on designing and implementing mechanical systems for production lines
Collaborated with senior engineers to troubleshoot and resolve technical issues
Assisted in conducting quality control tests and inspections
Participated in the development of new products and improvement of existing ones
Utilized CAD software to create detailed engineeri...
I applied via Naukri.com and was interviewed in Nov 2020. There were 3 interview rounds.
🙏🙏 please check my resume sir
posted on 20 Nov 2024
I applied via Approached by Company and was interviewed in Oct 2024. There was 1 interview round.
The 321 principle in GD&T refers to the rule that a feature must be within a specified tolerance zone defined by three datums.
321 principle states that a feature must be located within a tolerance zone defined by three datums
The first datum constrains movement in one direction, the second datum constrains movement in a second direction, and the third datum constrains movement in a third direction
This principle ensures ...
Quality of product is ensured through rigorous testing, adherence to standards, continuous improvement, and collaboration with cross-functional teams.
Implementing quality control measures throughout the production process
Conducting regular inspections and audits to identify and address any issues
Utilizing statistical process control techniques to monitor and improve product quality
Collaborating with suppliers to ensure...
posted on 4 Jul 2024
I applied via Referral and was interviewed before Jul 2023. There were 2 interview rounds.
Hydraulic calculation for pumps involves determining the flow rate, pressure, power, and efficiency of a pump system.
Calculate flow rate using the formula Q = VA, where Q is flow rate, V is velocity, and A is cross-sectional area.
Determine pressure using the formula P = F/A, where P is pressure, F is force, and A is area.
Calculate power using the formula P = Q*H*rho*g, where P is power, Q is flow rate, H is head, rho i...
Types of pumps include centrifugal pumps, positive displacement pumps, and axial flow pumps.
Centrifugal pumps: use a rotating impeller to increase the pressure of a fluid.
Positive displacement pumps: trap a fixed amount of fluid and then force it into a discharge pipe.
Axial flow pumps: move fluid parallel to the pump shaft.
Examples: Centrifugal pump - water pump, Positive displacement pump - diaphragm pump, Axial flow
I have successfully led process improvement projects resulting in cost savings and increased efficiency.
Led a team in implementing a new production process that reduced waste by 20%
Developed and implemented a new quality control system that improved product quality by 15%
Identified and resolved bottlenecks in the production line, increasing output by 10%
Yes, I have experience in implementing cost reduction strategies in process plants.
Implemented lean manufacturing principles to reduce waste and improve efficiency
Optimized equipment maintenance schedules to minimize downtime and reduce costs
Negotiated better pricing with suppliers to lower material costs
Introduced automation technologies to streamline processes and reduce labor costs
I have extensive troubleshooting experience in process plants, identifying and resolving issues to ensure smooth operations.
Identifying root causes of process issues
Developing and implementing solutions to improve efficiency
Collaborating with cross-functional teams to troubleshoot complex problems
Utilizing data analysis and problem-solving skills
Adapting quickly to changing situations and priorities
Pump hydraulic calculation involves determining the pump head, flow rate, and power requirements for a specific system.
Calculate total dynamic head (TDH) by adding the static head, friction head, and velocity head
Determine the required flow rate based on system requirements
Calculate the pump power requirements using the formula: Power (kW) = (Q x TDH) / (3.6 x efficiency)
Consider factors such as pump efficiency, pipe s
The coefficient of a control valve is a measure of the valve's flow capacity relative to the pressure drop across it.
The coefficient of a control valve, also known as the flow coefficient (Cv), is a dimensionless number that represents the flow capacity of the valve for a given pressure drop.
It is used to compare the performance of different valves and is typically determined experimentally.
A higher coefficient indicat...
Seeking new challenges and opportunities for professional growth.
Looking for new challenges to expand my skill set
Seeking opportunities for career advancement
Interested in working in a different industry or with new technologies
I applied via Recruitment Consulltant and was interviewed in Jan 2022. There were 2 interview rounds.
Some of the top questions asked at the Daurala Sugar Works Process Engineer interview -
based on 1 interview
Interview experience
Maintenance Fitter
32
salaries
| ₹1.5 L/yr - ₹3.2 L/yr |
Fitter
25
salaries
| ₹2 L/yr - ₹3.8 L/yr |
ITI Fitter
15
salaries
| ₹1.7 L/yr - ₹2.5 L/yr |
Deputy Manager
11
salaries
| ₹8.5 L/yr - ₹11.5 L/yr |
Electrician
10
salaries
| ₹0.9 L/yr - ₹3.5 L/yr |
Anmol Industries
Ferrero
Cpf India
Paras Dairy