I applied via Ceil and was interviewed in Sep 2021. There was 1 interview round.
Top trending discussions
I applied via Job Portal and was interviewed before Sep 2020. There was 1 interview round.
Cable manufacturing involves several steps including wire drawing, stranding, insulation, and jacketing.
Wire drawing involves pulling metal through a die to reduce its diameter.
Stranding involves twisting multiple wires together to form a cable.
Insulation is added to protect the wires from damage and prevent electrical interference.
Jacketing is the final step where a protective outer layer is added to the cable.
Quality...
I applied via Local and was interviewed in Jan 2021. There were 3 interview rounds.
I applied via Campus Placement and was interviewed before Nov 2022. There were 3 interview rounds.
Technical, aptitude, English,Gk
I applied via Company Website and was interviewed in Nov 2021. There was 1 interview round.
I applied via Company Website and was interviewed in Nov 2021. There was 1 interview round.
Production Operator
35
salaries
| ₹1.9 L/yr - ₹4.8 L/yr |
Quality Controller
31
salaries
| ₹3.3 L/yr - ₹4.5 L/yr |
Plant Operator
18
salaries
| ₹3 L/yr - ₹5.5 L/yr |
Operator
17
salaries
| ₹2.3 L/yr - ₹6.6 L/yr |
Forklift Operator
16
salaries
| ₹2.5 L/yr - ₹5 L/yr |
Havells
BHEL
Polycab Wires
CG Power and Industrial Solutions