I applied via Recruitment Consultant and was interviewed in Oct 2019. There were 3 interview rounds.
A signal line diagram is a graphical representation of a system's electrical circuitry.
It shows the flow of electrical signals through the system
It includes symbols for components such as switches, transformers, and relays
It is used by technicians to troubleshoot and repair electrical systems
It can also be used to design new systems or modify existing ones
Power factor can be found by dividing the real power by the apparent power.
Real power is measured in watts (W)
Apparent power is measured in volt-amperes (VA)
Power factor ranges from 0 to 1, with 1 being ideal
Power factor can be improved by using capacitors or correcting the phase angle
Top trending discussions
posted on 5 Aug 2024
I applied via Company Website and was interviewed in Jul 2024. There was 1 interview round.
I chose Electrical Engineering because of my passion for understanding and working with technology.
Fascination with technology and how things work
Interest in problem-solving and innovation
Desire to contribute to advancements in the field
Enjoyment of hands-on projects and experimentation
posted on 20 Feb 2024
I applied via Company Website and was interviewed in Jan 2024. There was 1 interview round.
posted on 9 Apr 2024
I applied via Walk-in and was interviewed before Apr 2023. There was 1 interview round.
Gravels are used in switch yards to provide a stable surface for equipment and to improve drainage.
Gravels help in reducing the risk of equipment damage due to flooding or standing water.
They also help in preventing erosion and maintaining the stability of the ground.
Gravels are easy to install and maintain, making them a cost-effective option for switch yards.
They allow for better heat dissipation, which is important ...
A Single Line Diagram (SLD) of a 33/11 kV switchyard shows the layout and connections of electrical equipment.
Key equipments include transformers, circuit breakers, isolators, busbars, surge arresters, and control panels.
Transformers step down voltage from 33 kV to 11 kV for distribution.
Circuit breakers protect the system from overloads and short circuits.
Isolators are used for isolating equipment for maintenance.
Busb...
OC and SC tests are conducted on transformers to determine their efficiency and performance under different load conditions.
OC test (Open Circuit test) is conducted to determine the no-load loss and magnetizing impedance of the transformer.
SC test (Short Circuit test) is conducted to determine the full-load copper loss and equivalent resistance of the transformer.
Both tests help in evaluating the efficiency and voltage...
posted on 19 Sep 2022
based on 1 review
Rating in categories
Quality Controller
29
salaries
| ₹3.3 L/yr - ₹4.5 L/yr |
Production Operator
29
salaries
| ₹1.9 L/yr - ₹4.7 L/yr |
Plant Operator
18
salaries
| ₹3 L/yr - ₹5.5 L/yr |
Operator
17
salaries
| ₹2.3 L/yr - ₹6.6 L/yr |
Forklift Operator
16
salaries
| ₹2.5 L/yr - ₹5 L/yr |
UBE Industries
Covestro
Sumitomo Chemical
Teijin