The power plant process involves converting fuel into electricity through various stages.
Fuel is burned to produce heat
Heat is used to create steam
Steam turns a turbine
Turbine generates electricity
Electricity is sent to the grid for distribution
I applied via Naukri.com and was interviewed before May 2020. There was 1 interview round.
I applied via Walk-in and was interviewed before Apr 2021. There was 1 interview round.
Compilation process involves several steps to convert source code into executable code.
Preprocessing: Includes header file inclusion, macro expansion, and conditional compilation.
Compilation: Translates source code into assembly code.
Assembly: Converts assembly code into machine code.
Linking: Combines object files and libraries to create an executable file.
Loading: Loads the executable file into memory and prepares it
I applied via Referral and was interviewed before Jun 2020. There were 3 interview rounds.
I applied via Recruitment Consultant and was interviewed in Mar 2020. There were 4 interview rounds.
I appeared for an interview in Dec 2020.
I applied via Naukri.com and was interviewed in Apr 2023. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in Sep 2023. There was 1 interview round.
posted on 19 Oct 2023
based on 1 interview
Interview experience
based on 8 reviews
Rating in categories
Senior Engineer
46
salaries
| ₹6 L/yr - ₹23.2 L/yr |
Deputy Manager
40
salaries
| ₹6 L/yr - ₹17.6 L/yr |
Engineer
39
salaries
| ₹6.4 L/yr - ₹20 L/yr |
Trainee
29
salaries
| ₹1.5 L/yr - ₹3 L/yr |
Assistant Manager
28
salaries
| ₹7.5 L/yr - ₹18 L/yr |
John Deere
Cummins
ABB
Caterpillar Inc