Cube Construction Engineering Project Coordinator Interview Questions and Answers

Updated 25 May 2024

Cube Construction Engineering Project Coordinator Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Referral and was interviewed before May 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Basic knowledge like What is M in M20, What is Strength of Concrete
  • Ans. MIN. and MAX. limits of HOOKS, BENDS, COVER of members
  • Answered by organisedlobster
  • Q2. Types of Concrete
  • Ans. 

    Types of concrete include ready-mix, precast, shotcrete, high-strength, and lightweight concrete.

    • Ready-mix concrete is produced in a plant and delivered to the construction site in a truck.

    • Precast concrete is cast in a reusable mold and cured in a controlled environment before being transported to the construction site.

    • Shotcrete is a type of concrete that is sprayed onto a surface using a pneumatic applicator.

    • High-stre...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for Cube Construction Engineering Project Coordinator interview:
  • RCC
  • DSS
Interview preparation tips for other job seekers - Stick to your basic knowledge in any interview and one must read an IS CODE

Interview questions from similar companies

Interview Questionnaire 

2 Questions

  • Q1. About my past projects
  • Q2. About myself and family
Interview experience
3
Average
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed before Mar 2024.

Round 1 - Technical 

(4 Questions)

  • Q1. Distribution buisness working process
  • Q2. Billing process
  • Q3. CTC process
  • Q4. Planning scope
Round 2 - HR 

(2 Questions)

  • Q1. Last salary withdrawal
  • Q2. Certificate details

Interview Preparation Tips

Interview preparation tips for other job seekers - Having same job experience makes 70 percent yes, having little reference makes 100%

Interview Questionnaire 

4 Questions

  • Q1. What are your job responsibilities and day to day works ?
  • Q2. Why LNT and not any other company ?
  • Q3. When can you join ?
  • Q4. Are you ok working anywhere through out India ?

Interview Preparation Tips

Interview preparation tips for other job seekers - Be smart, responsive, avoid bluffs/lie, be prepared to answer questions like y do u want to join? , Whats wrong in your current company ?, Etc.

I applied via Naukri.com and was interviewed before Feb 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(4 Questions)

  • Q1. What are your salary expectations?
  • Q2. Share details of your previous job.
  • Q3. Why are you looking for a change?
  • Q4. Tell me about yourself.

Interview Preparation Tips

Interview preparation tips for other job seekers - JUST BE CONFIDENT THEY ARE LOOKING FOR CANDIDATE WHO HAVE GOOD DECISION MAKING POWER.

I applied via Recruitment Consultant and was interviewed before Mar 2020. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. General project management questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Be honest

I applied via Approached by Company and was interviewed before May 2021. There were 2 interview rounds.

Round 1 - HR 

(1 Question)

  • Q1. Asked me to brief about me.He will test English speaking ability.
  • Ans. I breifed about my qualification and experience.speak only English.
  • Answered Anonymously
Round 2 - Case Study 

Online meeting conducted with me.About 4 to 5 people along with HR had a discussion with me.Asked questions regarding my work exposure and technical questions.

Interview Preparation Tips

Interview preparation tips for other job seekers - They first look at English speaking ability.Speak confidently with out fear.
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. Self introduction
  • Q2. Experience in the concern field
Round 2 - HR 

(2 Questions)

  • Q1. They will ask about your previous experience
  • Q2. Will ask about previous salary

Interview Preparation Tips

Interview preparation tips for other job seekers - Good company

I applied via Company Website and was interviewed in Oct 2020. There were 4 interview rounds.

Interview Questionnaire 

13 Questions

  • Q1. What your experience
  • Q2. Crust thickness
  • Q3. How to cut 150 hill in 60 degree slope
  • Ans. 

    Cutting 150 hill in 60 degree slope requires careful planning and execution.

    • Conduct a thorough survey of the area to determine the best approach

    • Use heavy machinery such as excavators and bulldozers to remove the hill

    • Ensure safety measures are in place to prevent accidents

    • Consider environmental impact and take necessary precautions

    • Consult with experts in the field for advice and guidance

  • Answered by AI
  • Q4. How we do Protection in 150m height
  • Ans. 

    Protection in 150m height can be achieved through various means.

    • Use of safety harness and fall protection equipment

    • Installation of guardrails and safety nets

    • Implementation of a comprehensive safety plan

    • Regular inspection and maintenance of equipment

    • Training and education of workers on safety procedures

  • Answered by AI
  • Q5. Which grade of bitumin used in hill area
  • Ans. 

    The grade of bitumen used in hill areas depends on the temperature and altitude of the region.

    • The higher the altitude, the harder the bitumen used.

    • The temperature also plays a crucial role in determining the grade of bitumen.

    • For example, in colder regions, a harder grade of bitumen is used to prevent cracking and deformation.

    • In contrast, in warmer regions, a softer grade of bitumen is used to prevent rutting and deform

  • Answered by AI
  • Q6. How do we concrete in min temp
  • Ans. 

    Concrete in minimum temperature requires proper mix design, curing, and protection from freezing.

    • Use a mix design with low water-cement ratio and proper amount of cement and admixtures.

    • Ensure proper curing by covering the concrete with blankets or insulating materials.

    • Protect the concrete from freezing by using heaters or insulating blankets.

    • Monitor the temperature of the concrete and the environment during and after p...

  • Answered by AI
  • Q7. How do we protect cavity in tunnel
  • Ans. 

    Cavity in tunnels can be protected by using various methods.

    • Waterproofing the tunnel lining

    • Using grouting techniques to fill the cavity

    • Installing drainage systems to prevent water accumulation

    • Regular inspections and maintenance

    • Using shotcrete to reinforce the tunnel lining

    • Applying rock bolts to stabilize the surrounding rock

    • Using steel ribs to support the tunnel lining

  • Answered by AI
  • Q8. Cycle time in tunnel
  • Ans. 

    Cycle time in tunnel refers to the time taken to complete one cycle of a process or operation within the tunnel.

    • Cycle time can vary depending on the type of tunnel and the process being carried out.

    • For example, in a transportation tunnel, cycle time may refer to the time taken for a vehicle to enter and exit the tunnel.

    • In a manufacturing tunnel, cycle time may refer to the time taken to complete one production cycle.

    • Ef...

  • Answered by AI
  • Q9. NATM full form
  • Ans. 

    NATM stands for New Austrian Tunneling Method, a technique used in underground construction.

    • NATM is a tunneling method that involves excavating the tunnel while providing support to the surrounding rock mass.

    • It was developed in Austria in the 1950s and has since been used in various tunneling projects worldwide.

    • NATM involves the use of shotcrete, rock bolts, and steel ribs to support the tunnel walls and roof.

    • Examples ...

  • Answered by AI
  • Q10. How much we drill holes in face
  • Ans. 

    The frequency of drilling holes in the face depends on the specific project requirements and geological conditions.

    • The number of holes drilled in the face will vary depending on the project's needs and the geological conditions of the site.

    • Factors such as the type of rock, the size of the excavation, and the equipment being used will all influence the frequency of drilling.

    • It is important to carefully plan and execute ...

  • Answered by AI
  • Q11. What is proholes and what it's uses
  • Ans. 

    Proholes is not a known term in engineering. No data available.

    • Answered by AI
    • Q12. Why is drain holes we do
    • Ans. 

      Drain holes are necessary to prevent water accumulation and damage to structures or equipment.

      • Drain holes allow water to escape from areas where it can cause damage or corrosion.

      • They are commonly used in outdoor furniture, boats, and buildings to prevent water accumulation.

      • Drain holes can also be used in machinery to prevent damage from water or other liquids.

      • Proper placement and size of drain holes is important to ens

    • Answered by AI
    • Q13. How much asscelerate we used in shotcrete
    • Ans. 

      The amount of accelerator used in shotcrete depends on various factors.

      • The type of accelerator used affects the amount required.

      • The desired strength and setting time also play a role.

      • The ambient temperature and humidity can affect the amount needed.

      • Typically, 1-5% of the cement weight is used as accelerator.

      • The manufacturer's recommendations should be followed for best results.

    • Answered by AI

    Interview Preparation Tips

    Interview preparation tips for other job seekers - Be confident always think and speake
    Interview experience
    5
    Excellent
    Difficulty level
    Moderate
    Process Duration
    Less than 2 weeks
    Result
    Selected Selected

    I applied via Walk-in and was interviewed before Apr 2020. There was 1 interview round.

    Round 1 - One-on-one 

    (2 Questions)

    • Q1. Brief about your carrier
    • Ans. 

      Experienced project manager with a proven track record of successfully leading and delivering projects on time and within budget.

      • Managed cross-functional teams to achieve project goals

      • Developed and implemented project plans, schedules, and budgets

      • Communicated effectively with stakeholders to ensure project alignment

      • Utilized project management tools such as Gantt charts and Kanban boards

      • Led the successful implementation...

    • Answered by AI
    • Q2. In which field you have experience

    Interview Preparation Tips

    Topics to prepare for Nagarjuna Construction Company Project Manager interview:
    • Not specific
    Interview preparation tips for other job seekers - Very good working environmental to job holders

    Cube Construction Engineering Interview FAQs

    How many rounds are there in Cube Construction Engineering Project Coordinator interview?
    Cube Construction Engineering interview process usually has 1 rounds. The most common rounds in the Cube Construction Engineering interview process are Technical.
    What are the top questions asked in Cube Construction Engineering Project Coordinator interview?

    Some of the top questions asked at the Cube Construction Engineering Project Coordinator interview -

    1. Types of Concr...read more
    2. Basic knowledge like What is M in M20, What is Strength of Concr...read more

    Tell us how to improve this page.

    Cube Construction Engineering Project Coordinator Interview Process

    based on 1 interview

    Interview experience

    5
      
    Excellent
    View more

    Interview Questions from Similar Companies

    L&T Construction Interview Questions
    4.0
     • 741 Interviews
    Tata Projects Interview Questions
    4.2
     • 424 Interviews
    KEC International Interview Questions
    4.0
     • 297 Interviews
    Dilip Buildcon Interview Questions
    4.0
     • 140 Interviews
    G R Infraprojects Interview Questions
    4.1
     • 132 Interviews
    View all
    Cube Construction Engineering Project Coordinator Salary
    based on 9 salaries
    ₹1.6 L/yr - ₹3.7 L/yr
    46% less than the average Project Coordinator Salary in India
    View more details

    Cube Construction Engineering Project Coordinator Reviews and Ratings

    based on 1 review

    1.0/5

    Rating in categories

    1.0

    Skill development

    1.0

    Work-life balance

    1.0

    Salary

    1.0

    Job security

    1.0

    Company culture

    1.0

    Promotions

    1.0

    Work satisfaction

    Explore 1 Review and Rating
    Electrical Engineer
    15 salaries
    unlock blur

    ₹0 L/yr - ₹0 L/yr

    Civil Site Engineer
    15 salaries
    unlock blur

    ₹0 L/yr - ₹0 L/yr

    Site Engineer
    12 salaries
    unlock blur

    ₹0 L/yr - ₹0 L/yr

    Senior Engineer
    10 salaries
    unlock blur

    ₹0 L/yr - ₹0 L/yr

    Project Manager
    9 salaries
    unlock blur

    ₹0 L/yr - ₹0 L/yr

    Explore more salaries
    Compare Cube Construction Engineering with

    Larsen & Toubro Limited

    4.0
    Compare

    Tata Projects

    4.2
    Compare

    Shapoorji Pallonji Group

    4.1
    Compare

    Punj Lloyd

    4.3
    Compare
    Did you find this page helpful?
    Yes No
    write
    Share an Interview