Filter interviews by
To find the quantity, calculate the amount of material needed based on the project specifications.
Review project plans and specifications to determine the required materials
Measure the area or volume of the space to be constructed
Calculate the amount of materials needed based on the measurements and project specifications
Consider any waste or excess material that may be needed
Adjust calculations as necessary based on a...
To find the area, multiply the length by the width.
Measure the length and width of the shape
Multiply the length by the width
For irregular shapes, break it down into smaller shapes and add their areas
Use appropriate units for the area, such as square feet or square meters
Customer Service Representative
6
salaries
| ₹1.4 L/yr - ₹3.5 L/yr |
Senior Associate
5
salaries
| ₹2.4 L/yr - ₹3.2 L/yr |
Consultant
4
salaries
| ₹4.1 L/yr - ₹5 L/yr |
Accountant
4
salaries
| ₹2.4 L/yr - ₹6 L/yr |
Computer Operator
4
salaries
| ₹10.1 L/yr - ₹10.1 L/yr |
Tata Group
Reliance Industries
Aditya Birla Group
Mahindra & Mahindra