Filter interviews by
Top trending discussions
posted on 5 Mar 2024
I applied via Approached by Company and was interviewed in Feb 2024. There were 2 interview rounds.
posted on 23 Oct 2023
The question is unclear and lacks context.
Please provide more information about the 'update shuttering system'.
Specify the time frame for the updates.
Clarify the purpose or objective of the updates.
Provide any relevant examples or scenarios.
I want to work as an execution engineer because I enjoy the challenge of overseeing and coordinating all aspects of a project.
As an execution engineer, I would have the opportunity to work on a variety of projects and oversee all aspects of their execution.
I enjoy the challenge of coordinating different teams and ensuring that everything runs smoothly.
While working on a formwork or quality team would be valuable experi...
Concrete is the most important as it provides the strength and durability to the structure.
Concrete is the backbone of any RCC structure.
It provides the strength and durability to the structure.
Reinforcements and formwork are important too, but without concrete, they are useless.
Proper mix design and curing of concrete are crucial for the longevity of the structure.
I applied via Walk-in and was interviewed before Jan 2022. There were 3 interview rounds.
Medium range tough questions were asked
HIRA stands for Hazard Identification and Risk Assessment. There are four types of fires: Class A, B, C, and D.
HIRA is a process of identifying potential hazards and assessing the risks associated with them.
It involves identifying the hazards, evaluating the risks, and implementing control measures to mitigate the risks.
Class A fires involve ordinary combustibles like wood, paper, and cloth.
Class B fires involve flamma...
Acts used in safety include preventive, corrective, detective, and compensatory measures.
Preventive measures aim to avoid accidents or incidents from happening, such as safety training, equipment maintenance, and hazard identification.
Corrective measures are taken after an accident or incident has occurred, such as first aid, repairs, and investigations.
Detective measures involve monitoring and identifying potential ha...
Noramal basic algorithm and ,fetch api
based on 1 interview
Interview experience
Formwork Engineer
5
salaries
| ₹0 L/yr - ₹0 L/yr |
Design Engineer
4
salaries
| ₹0 L/yr - ₹0 L/yr |
HR Manager
4
salaries
| ₹0 L/yr - ₹0 L/yr |
Maintenance Engineer
4
salaries
| ₹0 L/yr - ₹0 L/yr |
Production Engineer
4
salaries
| ₹0 L/yr - ₹0 L/yr |
Ajax Fiori Engineering
Schwing Stetter
Putzmeister Concrete Machines
Kyb Conmat