i
CommScope
Filter interviews by
Clear (1)
I applied via LinkedIn and was interviewed before Jun 2022. There were 3 interview rounds.
Top trending discussions
I applied via Recruitment Consultant and was interviewed in Nov 2019. There were 3 interview rounds.
I applied via Campus Placement and was interviewed before Apr 2019. There was 1 interview round.
I applied via Naukri.com and was interviewed in Jun 2019. There were 3 interview rounds.
Why-Why analysis is a problem-solving technique used to identify the root cause of a problem by repeatedly asking 'why' until the underlying cause is determined.
Why-Why analysis is also known as the 5 Whys technique.
It helps to uncover the underlying causes of a problem rather than just addressing the symptoms.
The technique involves asking 'why' multiple times to dig deeper into the problem.
Each 'why' question leads to...
5s is a workplace organization method that aims to improve efficiency and productivity by organizing and standardizing the workplace.
Sort - separate necessary items from unnecessary ones
Set in order - arrange necessary items in a logical manner
Shine - clean and inspect the workplace regularly
Standardize - establish procedures and guidelines for maintaining the workplace
Sustain - maintain the 5s system through continuou...
I applied via Recruitment Consultant
I will drive innovation through cross-functional collaboration, continuous learning, and data-driven decision-making.
Promote cross-functional collaboration to leverage diverse perspectives and expertise
Encourage continuous learning and development to stay ahead of industry trends
Utilize data-driven decision-making to identify opportunities for growth and optimization
I applied via Walk-in and was interviewed in Nov 2024. There was 1 interview round.
I applied via Walk-in
BOQ of 1 km LT line is a document that lists all the items required for the construction of a 1 km low tension line.
BOQ stands for Bill of Quantities
The BOQ includes details of materials, quantities, and prices
The BOQ helps in estimating the total cost of the project
Example items in the BOQ for a 1 km LT line: conductor, insulators, poles, transformers, hardware fittings, etc.
I applied via Recruitment Consulltant and was interviewed in Sep 2023. There was 1 interview round.
Standard size of a brick is 3 5/8 inches x 2 1/4 inches x 8 inches.
Standard size of a brick is 3 5/8 inches x 2 1/4 inches x 8 inches
Brick sizes can vary slightly depending on the manufacturer or region
Bricks are commonly used in construction for building walls, pavements, and other structures
I applied via Naukri.com and was interviewed before Jan 2022. There were 3 interview rounds.
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Senior Software Engineer
66
salaries
| ₹0 L/yr - ₹0 L/yr |
Team Lead
48
salaries
| ₹0 L/yr - ₹0 L/yr |
Telecom Engineer
45
salaries
| ₹0 L/yr - ₹0 L/yr |
Staff Engineer
44
salaries
| ₹0 L/yr - ₹0 L/yr |
Operator
43
salaries
| ₹0 L/yr - ₹0 L/yr |
Sterlite Technologies
Tejas Networks
HFCL Limited
Bharti Infratel