Installation and replacement of motors with safety handling of electric cables is crucial for Rmc Plant Supervisor role.
Ensure proper grounding of all electrical equipment
Use appropriate personal protective equipment (PPE) such as gloves, safety glasses, and hard hats
Follow lockout/tagout procedures to prevent accidental start-up of equipment
Properly label all electrical cables and wires
Regularly inspect and maintain e...
Top trending discussions
posted on 13 Jun 2024
I applied via Naukri.com and was interviewed before Jun 2023. There was 1 interview round.
SFD stands for Shear Force Diagram and BMD stands for Bending Moment Diagram in structural analysis.
SFD shows the variation of shear force along the length of a beam or structure.
BMD shows the variation of bending moment along the length of a beam or structure.
Both diagrams are essential for analyzing the internal forces in a structure.
They are commonly used in civil and mechanical engineering for designing and analyzi...
Thrust forces for beams can be calculated using equations of equilibrium and considering external loads.
Calculate the sum of all external forces acting on the beam.
Determine the direction of the forces (compression or tension) based on the beam's support conditions.
Apply equations of equilibrium to calculate the thrust forces at different points along the beam.
Consider any distributed loads or moments that may affect t...
I applied via LinkedIn and was interviewed in Mar 2021. There was 1 interview round.
I applied via Referral and was interviewed before Apr 2023. There was 1 interview round.
posted on 10 Oct 2024
I applied via Referral and was interviewed in Nov 2024. There was 1 interview round.
Previous all work experience
I applied via Naukri.com and was interviewed before Oct 2021. There was 1 interview round.
Safety precautions include wearing appropriate PPE, following proper procedures, and regular equipment maintenance. Steel wastage control involves accurate BBS preparation and monitoring on site.
Wear appropriate PPE such as hard hats, safety glasses, and steel-toed boots
Follow proper procedures for handling equipment and materials
Regularly maintain equipment to ensure it is in good working condition
Prepare accurate BBS...
The skill for finishing activities till handover to client requires attention to detail, effective communication, and time management.
Create a detailed project plan with clear timelines and milestones
Regularly communicate progress and any potential delays to the client
Ensure all tasks are completed to a high standard and meet client expectations
Conduct thorough testing and quality assurance before handover
Provide clear...
I applied via Naukri.com and was interviewed in Nov 2021. There were 3 interview rounds.
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Executive Accountant
22
salaries
| ₹2.2 L/yr - ₹3.7 L/yr |
Geotechnical Engineer
15
salaries
| ₹3.2 L/yr - ₹7.8 L/yr |
Assistant Manager
13
salaries
| ₹6 L/yr - ₹14.2 L/yr |
Site Engineer
11
salaries
| ₹2.8 L/yr - ₹4.8 L/yr |
Senior Engineer
9
salaries
| ₹6 L/yr - ₹8 L/yr |
Sterling & Wilson
Nasser S. Al Hajri Corporation
Navayuga Engineering Company
B.L. Kashyap & Sons