The cost of labor per one cubic meter of concrete varies depending on the location, complexity of the project, and experience of the workers.
Labor cost can range from $50 to $200 per cubic meter of concrete
Factors affecting labor cost include location, project complexity, and worker experience
Labor cost may also vary depending on the type of concrete being used
It is important to consider labor cost when estimating the
Factors to consider while concreting
Quality of materials used
Proper mixing of materials
Correct proportion of water to cement
Suitable curing time and conditions
Proper compaction of concrete
Weather conditions
Site conditions
Availability of equipment and labor
Adherence to safety standards
The grade of concrete refers to its strength and is determined by the ratio of cement, sand, and aggregate used in its composition.
The grade of concrete is denoted by a number, such as M20 or M30, where the letter 'M' stands for mix and the number denotes the strength in megapascals (MPa).
The strength of concrete increases with the increase in the grade number.
The ratio of cement, sand, and aggregate used in the mix de...
Top trending discussions
I applied via Approached by Company and was interviewed in Oct 2022. There were 3 interview rounds.
posted on 10 Jul 2024
RDBMS stands for Relational Database Management System, a type of database management system that stores data in a structured format.
Organizes data into tables with rows and columns
Uses SQL for querying and managing data
Supports ACID properties for data consistency
Examples: MySQL, Oracle Database, SQL Server
I applied via Job Fair and was interviewed before May 2023. There was 1 interview round.
The previous projects involved various types of formwork with a total shuttering area of approximately 10,000 square meters.
Used traditional timber formwork for a residential building project
Implemented modular steel formwork for a commercial complex
Utilized aluminum formwork for a high-rise construction
Employed tunnel formwork for an underground structure
I applied via Walk-in and was interviewed before Jan 2022. There were 2 interview rounds.
I am unable to provide my previous salary as it is confidential. However, I am expecting a competitive salary based on my qualifications and experience.
My previous salary is confidential and I am unable to disclose it.
I am expecting a salary that is commensurate with my qualifications and experience.
I am open to discussing salary expectations during the negotiation process.
I believe that a competitive salary is importa...
I applied via Approached by Company and was interviewed before Jul 2021. There were 2 interview rounds.
Planning for execution and laying of bituminous involves detailed scheduling, coordination, and quality control.
Develop a detailed project plan outlining tasks, timelines, and resources required
Coordinate with suppliers for timely delivery of materials
Ensure proper equipment and manpower are available for the execution
Implement quality control measures to ensure the final product meets specifications
Regularly monitor p...
posted on 24 Mar 2021
Some of the top questions asked at the Cherian Varkey Construction Company Quantity Surveyor interview for experienced candidates -
Site Engineer
6
salaries
| ₹2.4 L/yr - ₹3 L/yr |
Civil Engineer
5
salaries
| ₹1.4 L/yr - ₹5 L/yr |
Accountant
4
salaries
| ₹1.8 L/yr - ₹3 L/yr |
Junior Engineer
4
salaries
| ₹2.4 L/yr - ₹3.8 L/yr |
MEP Engineer
4
salaries
| ₹3 L/yr - ₹6 L/yr |
Patel Infrastructure
CTS Consulting & Technical Support
J K Fenner
Saudi Binladin Group