posted on 9 Dec 2021
I applied via Company Website and was interviewed in Jun 2021. There were 4 interview rounds.
Capabilities method is a process used to identify and evaluate the skills and abilities of an individual or organization.
The method involves assessing the current skills and abilities of the individual or organization
It also involves identifying areas for improvement and developing a plan to address those areas
The capabilities method can be used in various industries, including manufacturing, healthcare, and technology
...
Top trending discussions
posted on 14 Dec 2024
I applied via Referral and was interviewed in Nov 2024. There was 1 interview round.
I applied via Recruitment Consultant and was interviewed in Jul 2021. There was 1 interview round.
posted on 22 Jan 2022
I applied via Campus Placement and was interviewed before Jan 2021. There was 1 interview round.
Voltage can be measured using a voltmeter or multimeter.
Use a voltmeter or multimeter to measure voltage
Connect the voltmeter or multimeter in parallel to the circuit or component being measured
Ensure the voltmeter or multimeter is set to the appropriate voltage range
Read the voltage value displayed on the voltmeter or multimeter
The unit of resistance is ohm (Ω).
The unit of resistance is a measure of how much a material opposes the flow of electric current.
It is represented by the symbol Ω (omega).
Resistance is measured using an instrument called an ohmmeter.
Examples of resistance values: 10 Ω, 100 Ω, 1000 Ω.
The unit of current is Ampere (A).
The unit of current is a fundamental unit in the International System of Units (SI).
Current is the flow of electric charge in a circuit.
The symbol for current is 'I' and it is measured using an ammeter.
One ampere is defined as the amount of current that flows through a conductor when a potential difference of one volt is applied across it.
I applied via Naukri.com and was interviewed in Jun 2021. There was 1 interview round.
I applied via Times Job and was interviewed before Dec 2020. There were 3 interview rounds.
Takt time is the rate at which a product must be produced to meet customer demand. Cycle time is the time it takes to complete one cycle of a process.
Takt time is calculated by dividing the available production time by the customer demand.
Cycle time is the time it takes to complete one unit of a product.
Cycle time can be used to identify bottlenecks in the production process.
Reducing cycle time can increase productivit...
Line balancing is the process of optimizing workloads across an assembly line to improve efficiency and productivity.
Identify the tasks required to complete the assembly process
Determine the cycle time for each task
Calculate the total available work time
Allocate tasks to workstations based on cycle time and available work time
Adjust the allocation to minimize idle time and maximize efficiency
I applied via Naukri.com and was interviewed in May 2019. There were 5 interview rounds.
Design Engineer
212
salaries
| ₹6.8 L/yr - ₹18.2 L/yr |
Engineer
188
salaries
| ₹7 L/yr - ₹26.5 L/yr |
Software Engineer
183
salaries
| ₹6 L/yr - ₹22.3 L/yr |
Senior Associate Engineer
161
salaries
| ₹7.2 L/yr - ₹22 L/yr |
Associate Engineer
154
salaries
| ₹4.5 L/yr - ₹17 L/yr |
Komatsu
Volvo Construction Equipment
Tata Hitachi Construction Machinery
Liebherr