Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Atlas Copco Team. If you also belong to the team, you can get access from here

Atlas Copco Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

Atlas Copco Manufacturing Engineer Interview Questions and Answers

Updated 16 Nov 2019

Atlas Copco Manufacturing Engineer Interview Experiences

1 interview found

I applied via Naukri.com and was interviewed in May 2019. There were 5 interview rounds.

Interview Questionnaire 

7 Questions

  • Q1. First round was technical and second was final with GM. They were very streight forward and very patient to listen. They knew that i was a suitable candidate by seeing at my resume. They have checked wheth...
  • Q2. Basic personal interview questions they asked
  • Q3. Tell me about yourselsf, questions from resume do you know about value stream mapping, time study, pokayoke etc. Then achievements, challenges faced, how did i tackle challenges, etc etc
  • Q4. They have also checked my communication and qualifications.
  • Q5. If you have done masters degree then, there are high chances to get selected
  • Q6. They had called only to me, may be they did not want to waste time on interviewing candidates.
  • Q7. But both the rounds were tough to crack.they asked very tough & logical questions.you need to be very sharp.

Interview Preparation Tips

Interview preparation tips for other job seekers - Lengthy hiring process. It took me around 1 month to get an offer.

Interview questions from similar companies

I applied via Naukri.com and was interviewed in Apr 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. All aboutElectrical distribution

Interview Preparation Tips

Interview preparation tips for other job seekers - Interview is purely based on electrical basics and they asked questions only from your resume please prepare your resume clearly
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Substation related questions
Round 3 - HR 

(1 Question)

  • Q1. Salary Negotiation

Interview Questionnaire 

3 Questions

  • Q1. What is the effect of temperature and irradiance on solar panels?
  • Ans. 

    Temperature and irradiance affect the performance and efficiency of solar panels.

    • High temperatures can decrease the efficiency of solar panels.

    • Increased irradiance levels can lead to higher power output.

    • Temperature coefficient determines the panel's performance at different temperatures.

    • Irradiance levels vary based on factors like time of day, weather conditions, and panel orientation.

    • Temperature and irradiance should

  • Answered by AI
  • Q2. What are co-generation plants? How do you link co-generation plants with solar Pv plants?
  • Ans. 

    Co-generation plants produce both electricity and heat. They can be linked with solar PV plants to increase energy efficiency.

    • Co-generation plants use a single fuel source to produce both electricity and heat

    • Solar PV plants generate electricity from sunlight

    • Linking co-generation plants with solar PV plants can increase overall energy efficiency

    • Excess heat from co-generation plants can be used to power solar thermal sys...

  • Answered by AI
  • Q3. They asked about my profile? what do you need?

Interview Preparation Tips

Interview preparation tips for other job seekers - If you want to work in TUV SUD corporate then you need to have some kind of references.
Interview experience
3
Average
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Mar 2023. There was 1 interview round.

Round 1 - One-on-one 

(1 Question)

  • Q1. Basic of Electrical engineering and presence of mind

Interview Preparation Tips

Topics to prepare for TÜV SÜD Project Engineer interview:
  • Electricals
  • Electronics

Interview Questionnaire 

4 Questions

  • Q1. Instrumentation Basics
  • Q2.  DCS Architecture for various Projects handled in my career
  • Ans. 

    I have worked on various DCS architectures in my career, including those for chemical plants and power plants.

    • Designed and implemented DCS architecture for a chemical plant project

    • Developed DCS architecture for a power plant project

    • Worked on DCS architecture for a water treatment plant project

    • Collaborated with team to create DCS architecture for a pharmaceutical plant project

  • Answered by AI
  • Q3. Boiler Process and Logic Configurations
  • Q4. Package Negotiation

Interview Preparation Tips

Round: Resume Shortlist
Experience: DCS and Industrial Automation

Interview experience
3
Average
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Not Selected

I applied via Naukri.com and was interviewed in Dec 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(11 Questions)

  • Q1. Introduce yourself briefly?
  • Ans. 

    I am a highly skilled and experienced Project Engineer with a strong background in managing complex engineering projects.

    • Over 10 years of experience in project management and engineering

    • Proficient in utilizing project management software and tools

    • Strong leadership and communication skills

    • Proven track record of successfully delivering projects on time and within budget

    • Experience in coordinating with cross-functional tea...

  • Answered by AI
  • Q2. What projects you have done in previous company
  • Ans. 

    I have worked on various projects in my previous company, including the construction of a new office building and the implementation of a software system for project management.

    • Construction of a new office building

    • Implementation of a software system for project management

  • Answered by AI
  • Q3. What is lifecycle of project
  • Ans. 

    The lifecycle of a project refers to the stages it goes through from initiation to closure.

    • Initiation: project is defined and approved

    • Planning: project objectives, scope, and resources are determined

    • Execution: project plan is put into action

    • Monitoring and Control: project progress is tracked and necessary adjustments are made

    • Closure: project is completed and evaluated

    • Examples: construction of a building, development of...

  • Answered by AI
  • Q4. What are the industrial communication protocols
  • Ans. 

    Industrial communication protocols are standards for data exchange between devices in industrial automation and control systems.

    • Some common industrial communication protocols include Modbus, Profibus, DeviceNet, Ethernet/IP, and CANopen.

    • These protocols enable devices from different manufacturers to communicate with each other and exchange data.

    • Industrial communication protocols can be wired or wireless, and can operate...

  • Answered by AI
  • Q5. What are the settings required in MODBUS
  • Ans. 

    MODBUS settings include baud rate, parity, data bits, stop bits, and slave address.

    • Baud rate determines the speed of communication between devices.

    • Parity is used for error checking and can be set to even, odd, or none.

    • Data bits determine the number of bits used to represent each character.

    • Stop bits indicate the end of a character and can be set to 1 or 2.

    • Slave address is used to identify the device on the network.

    • Examp...

  • Answered by AI
  • Q6. Maximum speed in modbus
  • Ans. 

    The maximum speed in Modbus depends on the baud rate and cable length.

    • Modbus speed is measured in baud rate

    • Higher baud rates allow for faster data transfer

    • Cable length can also affect the maximum speed

    • For example, at 9600 baud rate, the maximum cable length is 1200 meters

  • Answered by AI
  • Q7. How many device add in modbus
  • Ans. 

    The number of devices that can be added in Modbus depends on the network architecture and the number of available addresses.

    • The maximum number of devices that can be added to a Modbus network is 247.

    • The number of available addresses depends on the type of Modbus protocol used (RTU or TCP/IP).

    • The network architecture also plays a role in determining the number of devices that can be added.

    • It is important to ensure that ...

  • Answered by AI
  • Q8. Types of modbus communication
  • Ans. 

    Modbus communication types include RTU, ASCII, and TCP/IP.

    • RTU (Remote Terminal Unit) is a serial communication protocol that uses binary code to transmit data.

    • ASCII (American Standard Code for Information Interchange) is a serial communication protocol that uses ASCII characters to transmit data.

    • TCP/IP (Transmission Control Protocol/Internet Protocol) is a network communication protocol that uses Ethernet to transmit d...

  • Answered by AI
  • Q9. On which scada you are worked
  • Ans. 

    I have worked on multiple SCADA systems including Wonderware, Ignition, and Inductive Automation.

    • I have experience with configuring and programming SCADA systems

    • I have worked with Wonderware, Ignition, and Inductive Automation

    • I am familiar with creating HMI screens, alarms, and trends

    • I have experience with PLC communication and data acquisition

    • I have worked on projects in various industries including manufacturing and

  • Answered by AI
  • Q10. What is maximum Input output handle
  • Ans. 

    The maximum input output handle refers to the maximum number of inputs and outputs that a device can handle.

    • The maximum input output handle varies depending on the device and its specifications.

    • It is important to consider the maximum input output handle when selecting a device for a project.

    • For example, a PLC may have a maximum input output handle of 256 inputs and 256 outputs.

    • Another example is a microcontroller with ...

  • Answered by AI
  • Q11. How many pages designed in HMI
  • Ans. 

    The number of pages designed in HMI depends on the project requirements and complexity.

    • The number of pages can range from a few to hundreds depending on the project scope.

    • The complexity of the HMI design and functionality also affects the number of pages.

    • Factors such as user interface, data visualization, and system integration can impact the number of pages.

    • It is important to prioritize user experience and ease of nav

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Currently they having vacancy for project engineer who is having experience of process automation in oil and gas field,chemical.

Skills evaluated in this interview

Project Engineer Interview Questions & Answers

ABB user image B.Mohammed Amjad

posted on 19 Sep 2023

Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Mar 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - One-on-one 

(13 Questions)

  • Q1. Hazardous classification
  • Q2. Environment conditions for Panel installation
  • Ans. 

    Environment conditions such as temperature, humidity, and cleanliness are crucial for panel installation.

    • Temperature should be within specified range to prevent damage to components.

    • Humidity levels should be controlled to avoid condensation and corrosion.

    • Cleanliness is important to prevent dust and debris from affecting performance.

    • Proper ventilation is necessary to prevent overheating.

    • Avoid exposure to direct sunlight...

  • Answered by AI
  • Q3. Restricted Earth Fault -explain
  • Ans. 

    Restricted Earth Fault is a type of fault in electrical systems where the fault current is limited to a specific section of the system.

    • Occurs when a fault current flows from a phase conductor to the earth through a restricted path

    • Usually detected by a relay that monitors the current imbalance between the phase and neutral conductors

    • Helps in quickly identifying and isolating the fault to prevent damage to equipment and ...

  • Answered by AI
  • Q4. Differential earth fault -explain
  • Ans. 

    Differential earth fault is a type of fault in electrical systems where the current flowing into and out of the system is not equal due to an earth fault.

    • Differential earth fault protection is used to detect such faults by comparing the current entering and leaving the system.

    • It is important for safety as it helps prevent damage to equipment and potential electric shocks.

    • Examples of differential earth fault protection ...

  • Answered by AI
  • Q5. Transformer insulation class
  • Ans. 

    Transformer insulation class indicates the temperature at which the insulation can operate safely.

    • Transformer insulation class is denoted by a letter (e.g. A, B, F, H) which corresponds to a maximum allowable temperature rise above ambient.

    • Higher insulation classes can withstand higher temperatures, providing better protection for the transformer.

    • Common insulation classes include A (105°C), B (130°C), F (155°C), and H

  • Answered by AI
  • Q6. Scheme to detect transformer temperature
  • Ans. 

    Implement a scheme using temperature sensors to detect transformer temperature.

    • Install temperature sensors at key points on the transformer

    • Set up a monitoring system to continuously track temperature readings

    • Establish temperature thresholds for alerts and shutdowns

    • Implement a cooling system to regulate temperature if needed

  • Answered by AI
  • Q7. Intelligence control system
  • Q8. Standby earth fault
  • Q9. Earthed system and unearthed system
  • Q10. Voltage Levels- As per standards
  • Ans. 

    Voltage levels as per standards vary depending on the application and region, with common levels including 110V, 220V, and 415V.

    • Voltage levels can vary depending on the application and region

    • Common residential voltage levels include 110V and 220V

    • Industrial voltage levels are typically higher, such as 415V

    • International standards like IEC and ANSI provide guidelines for voltage levels

  • Answered by AI
  • Q11. Types of MCCB to explain
  • Ans. 

    Molded Case Circuit Breakers (MCCBs) are types of circuit breakers that provide protection against overcurrents.

    • Thermal-magnetic MCCB: Trips when a current overload or short circuit is detected.

    • Electronic MCCB: Uses electronic components for more precise and adjustable protection.

    • Compact MCCB: Smaller in size for limited space installations.

    • Adjustable MCCB: Allows for manual adjustment of trip settings.

    • Motor protection...

  • Answered by AI
  • Q12. Lighting Calculation- Manually
  • Q13. Factors to consider for Lighting Calculation
  • Ans. 

    Factors to consider for lighting calculation include type of space, desired lighting levels, fixture efficiency, and lighting layout.

    • Type of space (office, warehouse, retail, etc.)

    • Desired lighting levels (measured in lux or foot-candles)

    • Fixture efficiency (lumens per watt)

    • Lighting layout (spacing and placement of fixtures)

    • Natural lighting sources (windows, skylights)

    • Color rendering index (CRI) for accurate color repres...

  • Answered by AI

Interview Preparation Tips

Topics to prepare for ABB Project Engineer interview:
  • Switchgear Component
  • Transformers
  • Panels
  • relay protection
  • MCCB
  • Lighting Design
Interview preparation tips for other job seekers - To cover all topics related to Transformer and Switchgear
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

What is relay..who it's work what is conductor tell about plc,scada,hmi

Round 3 - Technical 

(1 Question)

  • Q1. What is ur first project tell about it ..plc motor logic with 5 sec delay
Round 4 - HR 

(1 Question)

  • Q1. Where are form,when u start a carrer, i like to join in this comany

Interview Preparation Tips

Interview preparation tips for other job seekers - Focus on study do more extra activitie what ever learn
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Company Website and was interviewed in May 2024. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Communication between PLC controllers and DCS
  • Ans. 

    Communication between PLC controllers and DCS involves establishing a reliable connection for data exchange.

    • PLC controllers and DCS communicate through various communication protocols such as Modbus, Profibus, Ethernet/IP, etc.

    • Data is exchanged between PLC controllers and DCS for process control and monitoring.

    • Communication can be bidirectional, allowing both systems to send and receive data.

    • Proper configuration and pr...

  • Answered by AI
  • Q2. PID tunning and control
Round 2 - HR 

(2 Questions)

  • Q1. Why do you wanna join ABB
  • Q2. What make you chose abb over other companies

Interview Preparation Tips

Interview preparation tips for other job seekers - Be calm and confidential

Skills evaluated in this interview

Atlas Copco Interview FAQs

What are the top questions asked in Atlas Copco Manufacturing Engineer interview?

Some of the top questions asked at the Atlas Copco Manufacturing Engineer interview -

  1. First round was technical and second was final with GM. They were very streight...read more
  2. Tell me about yourselsf, questions from resume do you know about value stream m...read more
  3. If you have done masters degree then, there are high chances to get selec...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

ABB Interview Questions
4.1
 • 241 Interviews
John Deere Interview Questions
4.1
 • 235 Interviews
Cummins Interview Questions
4.3
 • 233 Interviews
Caterpillar Inc Interview Questions
4.2
 • 177 Interviews
KONE Interview Questions
4.1
 • 104 Interviews
Hitachi Interview Questions
4.0
 • 81 Interviews
TechnipFMC Interview Questions
4.0
 • 73 Interviews
TÜV SÜD Interview Questions
3.9
 • 65 Interviews
Hilti Interview Questions
3.4
 • 61 Interviews
View all
Atlas Copco Manufacturing Engineer Salary
based on 7 salaries
₹5 L/yr - ₹7.3 L/yr
18% more than the average Manufacturing Engineer Salary in India
View more details

Atlas Copco Manufacturing Engineer Reviews and Ratings

based on 2 reviews

3.0/5

Rating in categories

2.2

Skill development

4.0

Work-life balance

3.1

Salary

4.1

Job security

2.2

Company culture

2.1

Promotions

3.1

Work satisfaction

Explore 2 Reviews and Ratings
Design Engineer
279 salaries
unlock blur

₹2.4 L/yr - ₹12 L/yr

Service Engineer
225 salaries
unlock blur

₹1.8 L/yr - ₹10 L/yr

Senior Design Engineer
206 salaries
unlock blur

₹5.8 L/yr - ₹15.5 L/yr

Project Engineer
182 salaries
unlock blur

₹6 L/yr - ₹15 L/yr

Senior Service Engineer
102 salaries
unlock blur

₹4.5 L/yr - ₹14 L/yr

Explore more salaries
Compare Atlas Copco with

John Deere

4.1
Compare

Cummins

4.3
Compare

ABB

4.1
Compare

Tractors and Farm Equipment

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview