I applied via Approached by Company and was interviewed before Dec 2022. There were 2 interview rounds.
Check compressor by monitoring performance, inspecting for leaks, and listening for unusual noises.
Monitor performance by checking pressure levels and temperature readings.
Inspect for leaks by using a soap solution to detect air bubbles.
Listen for unusual noises such as knocking or rattling sounds.
Check for proper lubrication and ensure all connections are secure.
Inspect the compressor motor for any signs of overheatin
VCR's cycle involves recording and playback of video content using magnetic tape.
VCR records video content onto magnetic tape during the recording phase
During playback, the recorded video content is read from the tape and displayed on the screen
The cycle involves the user inserting a tape, recording content, and then playing back the recorded content
VCR's cycle can be represented in a diagram showing the flow of record
The machine may not work properly due to issues with the cooling system, such as low refrigerant levels or a malfunctioning compressor.
Low refrigerant levels can lead to inadequate cooling capacity
A malfunctioning compressor can result in poor cooling performance
Blocked air filters or condenser coils can restrict airflow and reduce cooling efficiency
Possible reasons for no cooling in a machine include dust in evaporator coil, lack of refrigerant, improper compressor pumping, and a chocked expansion valve.
Check for dust accumulation in the evaporator coil and clean if necessary
Inspect for any leaks or lack of refrigerant in the unit
Ensure the compressor is functioning properly and pumping refrigerant effectively
Check for any blockages or issues with the expansion v
Top trending discussions
posted on 22 Apr 2021
I applied via Naukri.com and was interviewed in Oct 2020. There were 4 interview rounds.
I applied via Company Website and was interviewed in Jan 2024. There were 2 interview rounds.
posted on 23 May 2021
Quality tools are techniques used to ensure quality in a product or service.
Quality control charts
Pareto charts
Fishbone diagrams
Histograms
Control charts
Scatter diagrams
Statistical process control
A histogram is used to represent the distribution of numerical data. Frequency is the number of occurrences and interval is the range of values.
Histograms are useful for visualizing data and identifying patterns.
Frequency refers to the number of times a value appears in the data set.
Interval refers to the range of values that are grouped together in the histogram.
Histograms are commonly used in statistics, finance, and...
Rework of produced parts affects the factors of Overall Equipment Efficiency (OEE).
Rework increases the time required to produce a part, reducing the availability factor of OEE.
Rework increases the number of defects, reducing the quality factor of OEE.
Rework increases the amount of scrap or waste, reducing the performance factor of OEE.
Rework can lead to increased downtime for equipment setup and adjustments, reducing ...
Autonomous maintenance is a maintenance approach where operators take responsibility for routine maintenance tasks.
Operators are trained to perform routine maintenance tasks
Operators conduct inspections and minor repairs
Autonomous maintenance reduces downtime and improves equipment reliability
It also frees up maintenance staff to focus on more complex tasks
Companies are going for TPM to improve productivity, reduce downtime, and increase efficiency.
TPM helps in identifying and eliminating equipment failures before they occur
It ensures that equipment is maintained properly and in a timely manner
TPM also helps in reducing the need for emergency repairs and downtime
It improves overall equipment effectiveness and reduces costs
Companies that have implemented TPM have seen sig...
SPC stands for Statistical Process Control. Cp and Cpk are statistical tools used to measure process capability.
SPC is a method of monitoring and controlling a process to ensure it is operating within acceptable limits.
Cp is a measure of how well the process is centered between the upper and lower specification limits.
Cpk is a measure of how well the process is capable of producing within the specification limits.
Cp an...
OEE can be calculated by multiplying Availability, Performance, and Quality percentages.
Calculate Availability by dividing Operating Time by Planned Production Time.
Calculate Performance by dividing Actual Production by Maximum Production.
Calculate Quality by dividing Good Units by Total Units Produced.
Multiply Availability, Performance, and Quality percentages to get OEE.
Major losses affecting OEE include availability, performance, and quality losses.
Availability losses occur when equipment is not running due to breakdowns, changeovers, or lack of materials.
Performance losses occur when equipment is running below its maximum speed or efficiency.
Quality losses occur when defective products are produced and need to be scrapped or reworked.
Other losses may include startup and shutdown los...
IATF stands for International Automotive Task Force and its current revised name is IATF 16949:2016.
IATF stands for International Automotive Task Force
Its current revised name is IATF 16949:2016
A capacitor is an electronic component that stores electrical energy in an electric field. It is used in various electronic circuits.
Capacitors are used to filter out noise and stabilize voltage in power supplies.
They are used in timing circuits, oscillators, and filters.
Capacitors are also used in audio equipment to filter out unwanted frequencies.
They can be found in electronic devices such as TVs, computers, and sma...
posted on 15 Sep 2021
I applied via Naukri.com and was interviewed in Aug 2021. There was 1 interview round.
I applied via Approached by Company and was interviewed in May 2022. There were 5 interview rounds.
I applied via Company Website and was interviewed before Jan 2023. There were 2 interview rounds.
Simple Python Coding questions.
I applied via Approached by Company and was interviewed in Feb 2024. There were 3 interview rounds.
I have worked on projects related to developing software for autonomous vehicles and implementing machine learning algorithms for predictive maintenance.
Developed software for autonomous vehicles to improve navigation and obstacle avoidance
Implemented machine learning algorithms for predictive maintenance in manufacturing plants
Collaborated with cross-functional teams to integrate new technologies into existing systems
I have experience with Java, Python, SQL, AWS, Docker, and Kubernetes in my previous projects.
Java
Python
SQL
AWS
Docker
Kubernetes
Docker is a platform for developing, shipping, and running applications in containers.
Docker allows applications to be isolated in containers, making them portable and easy to deploy across different environments.
Containers share the host OS kernel but run as isolated processes, providing lightweight and efficient virtualization.
Docker simplifies the process of packaging applications and their dependencies, ensuring co...
Database normalization is the process of organizing data in a database to reduce redundancy and improve data integrity.
Database normalization involves breaking down data into smaller, more manageable tables and defining relationships between them.
It helps in reducing data redundancy, improving data integrity, and making the database more efficient.
For example, in a project I worked on, we normalized the database by spl...
I have extensive experience working on challenging projects in various industries.
Led a team in developing a complex software solution for a major client
Managed a project with tight deadlines and limited resources
Implemented innovative solutions to overcome technical obstacles
Collaborated with cross-functional teams to deliver successful outcomes
I would approach learning about new domain and technologies with a different background by leveraging my existing skills, seeking out resources, and collaborating with experts in the field.
Identify key concepts and terminology in the new domain
Seek out online courses, tutorials, and books to gain foundational knowledge
Collaborate with colleagues or mentors who have experience in the new domain
Experiment with hands-on p...
I applied via Referral and was interviewed before Jul 2022. There were 3 interview rounds.
I applied via Company Website and was interviewed before May 2023. There was 1 interview round.
Questions related to digital and Analog electronics were asked
based on 1 interview
Interview experience
based on 9 reviews
Rating in categories
Diploma Trainee Engineer
45
salaries
| ₹1.5 L/yr - ₹2.5 L/yr |
Assistant Manager
36
salaries
| ₹6 L/yr - ₹14 L/yr |
Area Sales Manager
33
salaries
| ₹5 L/yr - ₹17.5 L/yr |
Senior Executive
30
salaries
| ₹5.1 L/yr - ₹10 L/yr |
Quality Engineer
24
salaries
| ₹1.7 L/yr - ₹6 L/yr |
Apar Industries
TDK India Private Limited
Molex
Micron Technology