i
CADTECH Engineering Solutions
Filter interviews by
I applied via Other and was interviewed in Jun 2021. There were 3 interview rounds.
VW and BMW have different design and engineering standards for their vehicles.
VW focuses on affordability and practicality while BMW emphasizes luxury and performance.
VW uses more standardized parts and components while BMW uses more proprietary technology.
VW has a more conservative design approach while BMW has a more avant-garde design philosophy.
VW has a larger market share and produces more vehicles than BMW.
Both c...
3D finish points refer to the final surface texture of a 3D model.
They are the points where the surface of the model is finished to the desired texture.
They are important for ensuring the model meets design specifications and looks aesthetically pleasing.
Examples include smooth, matte, glossy, or textured finishes.
Top trending discussions
I applied via Approached by Company and was interviewed before Apr 2023. There were 2 interview rounds.
About your role and responsibilities and technical questions from your cv
I appeared for an interview in Sep 2023.
There was a aptitude test
Stress is the force applied to a material, while strain is the resulting deformation. A stress-strain graph for ductile materials shows the relationship between stress and strain. Vernier calipers formula is used for precise measurements.
Stress is the force applied per unit area on a material, measured in units like N/m^2 or Pa.
Strain is the ratio of the change in length to the original length of a material.
A stress-st...
My name is John Smith.
My first name is John.
My last name is Smith.
I go by the name John Smith in professional settings.
Suzuki offers a wide range of car models.
Suzuki has multiple car models across different segments.
Some popular Suzuki car models include Swift, Baleno, Vitara, and Jimny.
Suzuki offers hatchbacks, sedans, SUVs, and compact cars.
The exact number of car models may vary depending on the region.
Nth
I applied via Referral and was interviewed in Oct 2020. There were 3 interview rounds.
posted on 21 Jun 2021
I applied via Walk-in and was interviewed in Dec 2020. There was 1 interview round.
I applied via Naukri.com and was interviewed in Nov 2020. There were 5 interview rounds.
The productivity of the assembly lines depends on various factors such as equipment, labor, and process efficiency.
Productivity can be measured by the number of units produced per hour or day.
Efficient use of equipment and labor can increase productivity.
Process improvements such as reducing downtime and optimizing workflows can also boost productivity.
Regular monitoring and analysis of productivity metrics can help id...
I control non-conformity by implementing a quality management system and conducting regular audits.
Implementing a quality management system to ensure all processes are standardized and documented
Conducting regular audits to identify non-conformities and take corrective actions
Training employees on quality standards and procedures to prevent non-conformities
Establishing a system for reporting and investigating non-confo...
Reducing manpower cost can be achieved through automation, process optimization, and outsourcing.
Automate repetitive tasks to reduce the need for manual labor
Optimize production processes to eliminate inefficiencies and reduce waste
Consider outsourcing non-core functions to reduce the size of the workforce
Implement training programs to improve employee skills and productivity
Use technology to monitor and manage employe...
Defects during product assembly can be of various types
Missing parts or components
Incorrectly installed parts
Misaligned parts
Loose or over-tightened fasteners
Scratches or dents on the product
Electrical or wiring issues
Inconsistent product quality
Incomplete assembly
Poorly finished surfaces
TPM stands for Total Productive Maintenance. It is a maintenance strategy that aims to maximize equipment effectiveness and minimize downtime.
TPM involves all employees in the maintenance process
It focuses on proactive maintenance to prevent breakdowns
There are 8 pillars of TPM, including autonomous maintenance, planned maintenance, and quality maintenance
TPM aims to improve overall equipment effectiveness (OEE) by red...
OEE stands for Overall Equipment Effectiveness. It is a measure of manufacturing productivity.
OEE is calculated by multiplying Availability, Performance, and Quality.
Availability is the percentage of time the equipment is available for production.
Performance is the percentage of the maximum speed the equipment is running.
Quality is the percentage of good quality products produced.
OEE = Availability x Performance x Qual...
Lean manufacturing is a systematic approach to minimize waste and maximize value in production processes.
It focuses on continuous improvement and elimination of non-value adding activities.
Tools include 5S, Kanban, Value Stream Mapping, and Just-in-Time production.
It aims to increase efficiency, reduce lead times, and improve quality.
Examples of lean manufacturing implementation include Toyota Production System and Lea
WIP can be managed by setting clear priorities, monitoring progress, and adjusting schedules as needed.
Establish clear priorities for each project
Monitor progress regularly to identify potential delays
Adjust schedules as needed to ensure timely completion
Communicate with team members to ensure everyone is on the same page
Use tools such as Kanban boards or Gantt charts to visualize progress
Design Engineer
43
salaries
| ₹2.5 L/yr - ₹5.3 L/yr |
CAD Engg
8
salaries
| ₹2 L/yr - ₹3.7 L/yr |
Lead Engineer
5
salaries
| ₹3.5 L/yr - ₹8.5 L/yr |
System Administrator
4
salaries
| ₹2 L/yr - ₹2 L/yr |
Project Lead
4
salaries
| ₹5.2 L/yr - ₹5.6 L/yr |
Kiswok Industries
Sundaram Motors
Pps Motors
Rajesh Motors