i
Bull Machines
Filter interviews by
Clear (1)
I applied via Approached by Company and was interviewed in Jul 2022. There were 3 interview rounds.
Top trending discussions
The question is unclear and lacks context.
Please provide more information about the 'update shuttering system'.
Specify the time frame for the updates.
Clarify the purpose or objective of the updates.
Provide any relevant examples or scenarios.
I want to work as an execution engineer because I enjoy the challenge of overseeing and coordinating all aspects of a project.
As an execution engineer, I would have the opportunity to work on a variety of projects and oversee all aspects of their execution.
I enjoy the challenge of coordinating different teams and ensuring that everything runs smoothly.
While working on a formwork or quality team would be valuable experi...
Concrete is the most important as it provides the strength and durability to the structure.
Concrete is the backbone of any RCC structure.
It provides the strength and durability to the structure.
Reinforcements and formwork are important too, but without concrete, they are useless.
Proper mix design and curing of concrete are crucial for the longevity of the structure.
I applied via Company Website and was interviewed in Mar 2021. There was 1 interview round.
I applied via Job Portal and was interviewed in Oct 2020. There was 1 interview round.
I applied via Company Website and was interviewed before Apr 2020. There were 4 interview rounds.
Mix design of concrete and BTech project
Mix design involves determining the proportions of cement, water, aggregates, and admixtures to achieve desired properties of concrete
Factors like strength, workability, durability, and cost are considered while designing the mix
BTech project can involve studying the effect of different mix designs on properties of concrete or developing a new mix design
Examples of BTech projects...
I applied via Walk-in and was interviewed in Dec 2020. There were 3 interview rounds.
I was interviewed before Jul 2016.
posted on 15 Feb 2018
I applied via Approached by Company and was interviewed in Feb 2018. There were 6 interview rounds.
posted on 25 Jan 2024
I applied via Campus Placement and was interviewed before Jan 2023. There were 2 interview rounds.
Company taken an aptitude test after that interview
based on 6 reviews
Rating in categories
Territory Manager
28
salaries
| ₹0 L/yr - ₹0 L/yr |
Junior Engineer
17
salaries
| ₹0 L/yr - ₹0 L/yr |
Quality Engineer
17
salaries
| ₹0 L/yr - ₹0 L/yr |
Design Engineer
16
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
16
salaries
| ₹0 L/yr - ₹0 L/yr |
JCB
Mahindra Construction Equipment
Tata Hitachi Construction Machinery
Action Construction Equipment