Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by Blackstone Group Technologies Team. If you also belong to the team, you can get access from here

Blackstone Group Technologies Verified Tick

Compare button icon Compare button icon Compare
3.6

based on 43 Reviews

Filter interviews by

Blackstone Group Technologies Interview Questions and Answers

Updated 7 Mar 2024

Blackstone Group Technologies Interview Experiences

Popular Designations

3 interviews found

Chennai Interview Questions & Answers

user image Anonymous

posted on 7 Sep 2023

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed in Aug 2023. There were 4 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Aptitude Test 

Ask some questions related to ur job

Round 3 - Design Test 

(1 Question)

  • Q1. Draw an company give drawing in system
Round 4 - Face to face 

(1 Question)

  • Q1. Face to face is an Md interview to you.

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare for interview
Last round..
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed in Dec 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Based on experience question
Round 3 - HR 

(1 Question)

  • Q1. Personal information

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare your experience and do any additional course

System Administrator Interview Questions asked at other Companies

Q1. 2. What is Cloud Technology. What is Microsoft Intune. If we can manage applications using MAM then why do we need MDM?
View answer (8)
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via Approached by Company and was interviewed before Mar 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Sfd bmd drawing must

Design Engineer Interview Questions asked at other Companies

Q1. Stress Strain curve, What will happen if you use petrol in diesel engine and Diesel in petrol engone.
View answer (5)

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
-

I was interviewed in Dec 2024.

Round 1 - One-on-one 

(5 Questions)

  • Q1. What is Total Float (TF) and Free Float(FF)?
  • Q2. What is your understanding of Earned Value Analysis (EVA)?
  • Q3. What are the key aspects to consider in delay analysis?
  • Q4. How would you rate your proficiency in P6/MSP on a scale of 1 to 10?
  • Q5. What are the different types of contracts?
Interview experience
3
Average
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via campus placement at Delhi College of Engineering (DCE), Delhi and was interviewed in Dec 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Basis Electrical Questions like Relation between Voltage and current, Reactive Power, Series Parallel Connections etc
  • Q2. About Projects and Internships

Interview Preparation Tips

Topics to prepare for Tractebel Pget interview:
  • Electricals
  • Power Electronics
  • Basic
Interview preparation tips for other job seekers - Guys, stick to basics and try to give crisp answers
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Dec 2024.

Round 1 - Technical 

(4 Questions)

  • Q1. Procedure about maintenance
  • Ans. 

    Maintenance procedures involve regular inspections, testing, and repairs to ensure equipment functionality and safety.

    • Regularly schedule maintenance tasks to prevent breakdowns and ensure equipment longevity

    • Conduct thorough inspections to identify potential issues before they escalate

    • Keep detailed records of maintenance activities and equipment history

    • Train staff on proper maintenance procedures and safety protocols

    • Uti...

  • Answered by AI
  • Q2. Knowledge about LOTO
  • Q3. Haw to maintain a battery bank
  • Ans. 

    To maintain a battery bank, regular inspections, proper charging, temperature control, and monitoring electrolyte levels are essential.

    • Perform regular inspections to check for signs of corrosion, leaks, or damage

    • Ensure proper charging by following manufacturer's guidelines and avoiding overcharging

    • Control temperature to prevent overheating or freezing, which can reduce battery life

    • Monitor electrolyte levels and top up ...

  • Answered by AI
  • Q4. Asking about ptw
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed in Nov 2024. There was 1 interview round.

Round 1 - One-on-one 

(5 Questions)

  • Q1. Ducting types youed
  • Q2. Ducting any types of material
  • Q3. Mep for explain
  • Q4. Mep basic form housed property
  • Q5. Electrical line
Interview experience
1
Bad
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via LinkedIn and was interviewed in Jun 2024. There were 3 interview rounds.

Round 1 - Technical 

(8 Questions)

  • Q1. Can you tell me about yourself?
  • Ans. 

    I am a dedicated and experienced Project Control Engineer with a strong background in managing project schedules, budgets, and resources.

    • Over 5 years of experience in project control and management

    • Proficient in using project management software such as Primavera P6 and Microsoft Project

    • Skilled in analyzing project data and providing accurate forecasts

    • Strong communication and teamwork skills, able to collaborate with cr...

  • Answered by AI
  • Q2. What are the basics of Primavera?
  • Ans. 

    Primavera is a project management software used for planning, scheduling, and controlling projects.

    • Primavera is commonly used in industries such as construction, engineering, and manufacturing.

    • It allows users to create project schedules, allocate resources, track progress, and analyze project performance.

    • Users can generate reports, monitor costs, and manage risks within the software.

    • Primavera offers features like Gantt...

  • Answered by AI
  • Q3. What types of activities are there?
  • Q4. What are the different types of relationships?
  • Ans. 

    Different types of relationships include familial, romantic, professional, and platonic relationships.

    • Familial relationships: relationships between family members such as parents, siblings, and children.

    • Romantic relationships: intimate relationships between partners or spouses.

    • Professional relationships: relationships between colleagues or business partners.

    • Platonic relationships: non-romantic relationships based on fr

  • Answered by AI
  • Q5. How can you create a schedule?
  • Ans. 

    A schedule can be created by identifying project tasks, estimating durations, sequencing tasks, assigning resources, and setting milestones.

    • Identify all project tasks and break them down into smaller, manageable activities.

    • Estimate the duration of each task based on historical data or expert judgment.

    • Sequence the tasks in the order they need to be completed, considering dependencies between tasks.

    • Assign resources to ea...

  • Answered by AI
  • Q6. What is a look-ahead report?
  • Ans. 

    A look-ahead report is a document that outlines upcoming tasks, potential issues, and solutions for a project.

    • Provides a snapshot of upcoming project activities

    • Highlights potential roadblocks and proposed solutions

    • Helps project team anticipate and plan for future challenges

    • Usually covers a short-term period, such as the next week or month

  • Answered by AI
  • Q7. What are the steps to create a look-ahead report?
  • Ans. 

    Steps to create a look-ahead report

    • Identify the project milestones and deadlines

    • Review the project schedule and identify upcoming tasks

    • Analyze potential risks and delays

    • Update the look-ahead report with current progress and forecasted completion dates

    • Communicate the report to stakeholders for awareness and decision-making

  • Answered by AI
  • Q8. What are the 14 points of the DCMA (Defense Contract Management Agency)?
  • Ans. 

    The 14 points of the DCMA are guidelines for effective project management in defense contracts.

    • Establish clear project objectives and requirements

    • Develop a realistic project schedule

    • Assign responsibilities and authorities clearly

    • Ensure adequate resources are available

    • Maintain open communication with stakeholders

    • Identify and manage project risks

    • Monitor and control project performance

    • Implement corrective actions when nec...

  • Answered by AI
Round 2 - Technical 

(5 Questions)

  • Q1. What is earned value management?
  • Ans. 

    Earned value management is a project management technique for measuring project performance and progress.

    • Compares actual work completed and costs incurred to planned work and costs

    • Helps in forecasting project outcomes based on current performance

    • Key metrics include Planned Value (PV), Earned Value (EV), and Actual Cost (AC)

    • Formula: EV = % of work completed * Total budget

    • Example: If a project is 50% complete and the tot...

  • Answered by AI
  • Q2. What are the key performance indicators?
  • Ans. 

    Key performance indicators are measurable values that demonstrate how effectively a company is achieving key business objectives.

    • KPIs are specific, quantifiable metrics used to track progress towards organizational goals.

    • They help in evaluating the success of a project or business by measuring performance in key areas.

    • Examples of KPIs for a Project Control Engineer may include project completion time, budget variance,

  • Answered by AI
  • Q3. A project scenario was provided, and I was required to identify the key performance indicators.
  • Q4. What are the various formulas used to calculate the Budget at Completion (BAC)?
  • Ans. 

    Formulas used to calculate Budget at Completion (BAC) in project control engineering.

    • BAC = Planned Value (PV) at completion

    • BAC = Actual Cost (AC) + Estimate to Complete (ETC)

    • BAC = Budgeted Cost of Work Scheduled (BCWS) + Budgeted Cost of Work Remaining (BCWR)

  • Answered by AI
  • Q5. Where do you see yourself in five years?
  • Ans. 

    In five years, I see myself as a senior project control engineer leading a team of professionals and successfully managing complex projects.

    • Continuing to enhance my project management skills through advanced training and certifications

    • Taking on more responsibilities and leadership roles within the organization

    • Successfully completing several high-profile projects and delivering exceptional results

    • Mentoring and guiding j...

  • Answered by AI
Round 3 - HR 

(2 Questions)

  • Q1. What are your salary expectations for this position?
  • Ans. 

    My salary expectations are in line with industry standards for a Project Control Engineer with my level of experience and qualifications.

    • Research industry standards for Project Control Engineer salaries

    • Consider my level of experience and qualifications

    • Be prepared to negotiate based on the overall compensation package offered

  • Answered by AI
  • Q2. What are the working hours that are suitable for you?
  • Ans. 

    I am flexible with working hours and can adapt to the needs of the project. I am willing to work overtime when necessary.

    • I am open to working flexible hours to accommodate project needs

    • I am willing to work overtime when required to meet project deadlines

    • I can adjust my schedule to align with team meetings or client requirements

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - When determining salary expectations, focus solely on the in-hand salary and do not factor in the travel allowance.
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Sep 2024. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. Reverse the string
  • Ans. 

    Reverse a given string

    • Use a loop to iterate through the characters of the string

    • Append each character to a new string in reverse order

    • Return the reversed string

  • Answered by AI
  • Q2. Merge sort on infinite linklist
  • Ans. 

    Merge sort cannot be directly applied to an infinite linked list due to its divide and conquer nature.

    • Merge sort requires dividing the list into smaller sublists, which is not possible with an infinite linked list.

    • One approach is to break the infinite linked list into finite chunks, sort each chunk using merge sort, and then merge the sorted chunks.

    • Another approach is to use a different sorting algorithm that can handl...

  • Answered by AI
  • Q3. Operating systems
  • Q4. System designing
  • Q5. Object oriented programming

Skills evaluated in this interview

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-

I applied via Walk-in

Round 1 - HR 

(2 Questions)

  • Q1. Tell me about yourself.
  • Q2. What is your knowledge of Revit and other Building Information Modeling (BIM) software?

Interview Preparation Tips

Interview preparation tips for other job seekers - The BIM Engineers is an excellent company to work for and grow your career in the field of Building Information Modeling (BIM), while TBE is a leading company in this industry.

Blackstone Group Technologies Interview FAQs

How many rounds are there in Blackstone Group Technologies interview?
Blackstone Group Technologies interview process usually has 2-3 rounds. The most common rounds in the Blackstone Group Technologies interview process are Resume Shortlist, Technical and HR.
How to prepare for Blackstone Group Technologies interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Blackstone Group Technologies. The most common topics and skills that interviewers at Blackstone Group Technologies expect are Communication Skills, Job Posting, Tekla, Written Communication and .Net.
What are the top questions asked in Blackstone Group Technologies interview?

Some of the top questions asked at the Blackstone Group Technologies interview -

  1. Draw an company give drawing in sys...read more
  2. Based on experience quest...read more
  3. Sfd bmd drawing m...read more

Tell us how to improve this page.

Blackstone Group Technologies Interview Process

based on 2 interviews

Interview experience

4.5
  
Good
View more

Interview Questions from Similar Companies

Tractebel Interview Questions
4.0
 • 41 Interviews
J&F Interview Questions
3.8
 • 30 Interviews
Eversendai Interview Questions
3.8
 • 27 Interviews
Tpg Capital Interview Questions
4.0
 • 1 Interview
View all

Blackstone Group Technologies Reviews and Ratings

based on 43 reviews

3.6/5

Rating in categories

3.7

Skill development

3.3

Work-life balance

2.9

Salary

3.9

Job security

3.2

Company culture

3.0

Promotions

3.8

Work satisfaction

Explore 43 Reviews and Ratings
Tekla Modeller
31 salaries
unlock blur

₹2.5 L/yr - ₹6 L/yr

Junior Engineer
23 salaries
unlock blur

₹1.1 L/yr - ₹4 L/yr

CAD Engg
18 salaries
unlock blur

₹1.1 L/yr - ₹5 L/yr

Steel Detailer
9 salaries
unlock blur

₹1.5 L/yr - ₹3 L/yr

Junior Checker
8 salaries
unlock blur

₹2 L/yr - ₹3.5 L/yr

Explore more salaries
Compare Blackstone Group Technologies with

KKR India Asset Finance

3.5
Compare

Bain Capital

5.0
Compare

Warburg Pincus

1.0
Compare

Tpg Capital

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview