i
Blackstone Group Technologies
Filter interviews by
I applied via Campus Placement and was interviewed in Aug 2023. There were 4 interview rounds.
Ask some questions related to ur job
I applied via Walk-in and was interviewed in Dec 2022. There were 3 interview rounds.
I applied via Approached by Company and was interviewed before Mar 2023. There was 1 interview round.
Top trending discussions
posted on 22 Jan 2025
I was interviewed in Dec 2024.
I applied via campus placement at Delhi College of Engineering (DCE), Delhi and was interviewed in Dec 2024. There was 1 interview round.
posted on 23 Jan 2025
I was interviewed in Dec 2024.
Maintenance procedures involve regular inspections, testing, and repairs to ensure equipment functionality and safety.
Regularly schedule maintenance tasks to prevent breakdowns and ensure equipment longevity
Conduct thorough inspections to identify potential issues before they escalate
Keep detailed records of maintenance activities and equipment history
Train staff on proper maintenance procedures and safety protocols
Uti...
To maintain a battery bank, regular inspections, proper charging, temperature control, and monitoring electrolyte levels are essential.
Perform regular inspections to check for signs of corrosion, leaks, or damage
Ensure proper charging by following manufacturer's guidelines and avoiding overcharging
Control temperature to prevent overheating or freezing, which can reduce battery life
Monitor electrolyte levels and top up ...
posted on 3 Dec 2024
I applied via Campus Placement and was interviewed in Nov 2024. There was 1 interview round.
posted on 25 Dec 2024
I applied via LinkedIn and was interviewed in Jun 2024. There were 3 interview rounds.
I am a dedicated and experienced Project Control Engineer with a strong background in managing project schedules, budgets, and resources.
Over 5 years of experience in project control and management
Proficient in using project management software such as Primavera P6 and Microsoft Project
Skilled in analyzing project data and providing accurate forecasts
Strong communication and teamwork skills, able to collaborate with cr...
Primavera is a project management software used for planning, scheduling, and controlling projects.
Primavera is commonly used in industries such as construction, engineering, and manufacturing.
It allows users to create project schedules, allocate resources, track progress, and analyze project performance.
Users can generate reports, monitor costs, and manage risks within the software.
Primavera offers features like Gantt...
Different types of relationships include familial, romantic, professional, and platonic relationships.
Familial relationships: relationships between family members such as parents, siblings, and children.
Romantic relationships: intimate relationships between partners or spouses.
Professional relationships: relationships between colleagues or business partners.
Platonic relationships: non-romantic relationships based on fr
A schedule can be created by identifying project tasks, estimating durations, sequencing tasks, assigning resources, and setting milestones.
Identify all project tasks and break them down into smaller, manageable activities.
Estimate the duration of each task based on historical data or expert judgment.
Sequence the tasks in the order they need to be completed, considering dependencies between tasks.
Assign resources to ea...
A look-ahead report is a document that outlines upcoming tasks, potential issues, and solutions for a project.
Provides a snapshot of upcoming project activities
Highlights potential roadblocks and proposed solutions
Helps project team anticipate and plan for future challenges
Usually covers a short-term period, such as the next week or month
Steps to create a look-ahead report
Identify the project milestones and deadlines
Review the project schedule and identify upcoming tasks
Analyze potential risks and delays
Update the look-ahead report with current progress and forecasted completion dates
Communicate the report to stakeholders for awareness and decision-making
The 14 points of the DCMA are guidelines for effective project management in defense contracts.
Establish clear project objectives and requirements
Develop a realistic project schedule
Assign responsibilities and authorities clearly
Ensure adequate resources are available
Maintain open communication with stakeholders
Identify and manage project risks
Monitor and control project performance
Implement corrective actions when nec...
Earned value management is a project management technique for measuring project performance and progress.
Compares actual work completed and costs incurred to planned work and costs
Helps in forecasting project outcomes based on current performance
Key metrics include Planned Value (PV), Earned Value (EV), and Actual Cost (AC)
Formula: EV = % of work completed * Total budget
Example: If a project is 50% complete and the tot...
Key performance indicators are measurable values that demonstrate how effectively a company is achieving key business objectives.
KPIs are specific, quantifiable metrics used to track progress towards organizational goals.
They help in evaluating the success of a project or business by measuring performance in key areas.
Examples of KPIs for a Project Control Engineer may include project completion time, budget variance,
Formulas used to calculate Budget at Completion (BAC) in project control engineering.
BAC = Planned Value (PV) at completion
BAC = Actual Cost (AC) + Estimate to Complete (ETC)
BAC = Budgeted Cost of Work Scheduled (BCWS) + Budgeted Cost of Work Remaining (BCWR)
In five years, I see myself as a senior project control engineer leading a team of professionals and successfully managing complex projects.
Continuing to enhance my project management skills through advanced training and certifications
Taking on more responsibilities and leadership roles within the organization
Successfully completing several high-profile projects and delivering exceptional results
Mentoring and guiding j...
My salary expectations are in line with industry standards for a Project Control Engineer with my level of experience and qualifications.
Research industry standards for Project Control Engineer salaries
Consider my level of experience and qualifications
Be prepared to negotiate based on the overall compensation package offered
I am flexible with working hours and can adapt to the needs of the project. I am willing to work overtime when necessary.
I am open to working flexible hours to accommodate project needs
I am willing to work overtime when required to meet project deadlines
I can adjust my schedule to align with team meetings or client requirements
posted on 25 Oct 2024
I applied via Approached by Company and was interviewed in Sep 2024. There was 1 interview round.
Reverse a given string
Use a loop to iterate through the characters of the string
Append each character to a new string in reverse order
Return the reversed string
Merge sort cannot be directly applied to an infinite linked list due to its divide and conquer nature.
Merge sort requires dividing the list into smaller sublists, which is not possible with an infinite linked list.
One approach is to break the infinite linked list into finite chunks, sort each chunk using merge sort, and then merge the sorted chunks.
Another approach is to use a different sorting algorithm that can handl...
I applied via Walk-in
Interview experience
based on 43 reviews
Rating in categories
Tekla Modeller
31
salaries
| ₹2.5 L/yr - ₹6 L/yr |
Junior Engineer
23
salaries
| ₹1.1 L/yr - ₹4 L/yr |
CAD Engg
18
salaries
| ₹1.1 L/yr - ₹5 L/yr |
Steel Detailer
9
salaries
| ₹1.5 L/yr - ₹3 L/yr |
Junior Checker
8
salaries
| ₹2 L/yr - ₹3.5 L/yr |
KKR India Asset Finance
Bain Capital
Warburg Pincus
Tpg Capital