i
Beratung Consultants
Filter interviews by
Top trending discussions
posted on 6 Mar 2022
I applied via Referral and was interviewed before Mar 2021. There were 2 interview rounds.
Lean manufacturing is a systematic approach to identifying and eliminating waste in the production process.
Focuses on continuous improvement and waste reduction
Involves all employees in the process
Uses tools such as value stream mapping and 5S
Examples include Toyota Production System and Kaizen
OEE stands for Overall Equipment Effectiveness and productivity refers to the efficiency of a process or system.
OEE is a metric used to measure the performance of manufacturing equipment.
It takes into account three factors: availability, performance, and quality.
Productivity is a measure of how efficiently resources are used to produce goods or services.
It can be calculated by dividing output by input.
Improving OEE and...
I applied via Naukri.com and was interviewed in Dec 2022. There were 5 interview rounds.
Lean techniques focus on eliminating waste and improving efficiency in processes.
Lean techniques involve identifying and eliminating waste in processes to improve efficiency.
Uses in real life include implementing just-in-time inventory systems, reducing lead times, and streamlining production processes.
Lean techniques can also be applied in service industries to improve customer satisfaction and reduce costs.
Examples i...
Six Sigma and Lean Black Belt methodologies are used in consulting to improve processes and reduce waste.
Six Sigma focuses on reducing defects and variation in processes
Lean Black Belt focuses on eliminating waste and improving efficiency
Combining both methodologies can lead to significant improvements in quality and productivity
Examples of using Six Sigma and Lean Black Belt in consulting include streamlining supply c...
Project management involves planning, organizing, and executing projects using tools and techniques to achieve specific goals.
Project management tools like Gantt charts, Kanban boards, and project management software help in planning and tracking progress.
Techniques such as Agile, Waterfall, and Scrum methodologies are used to manage projects efficiently.
Effective communication, risk management, and stakeholder engagem...
posted on 16 Sep 2022
I applied via Campus Placement
Yes, I am willing to travel for work.
I am open to traveling both domestically and internationally.
I have experience traveling for work in my previous roles.
I understand the importance of being flexible and adaptable while traveling.
I am willing to make necessary arrangements to ensure a smooth travel experience.
I applied via Naukri.com and was interviewed in Aug 2022. There were 2 interview rounds.
Improving productivity can be achieved through effective time management, prioritization, delegation, and automation.
Create a to-do list and prioritize tasks based on importance and urgency
Delegate tasks to team members who are capable and available
Automate repetitive tasks using technology
Take breaks and avoid multitasking to maintain focus and energy
Set realistic goals and deadlines
Eliminate distractions and interrup...
Cycle time and Takt time are two types of time used in manufacturing processes.
Cycle time is the time it takes to complete one cycle of a process or operation.
Takt time is the rate at which a product must be produced in order to meet customer demand.
Cycle time can be used to identify bottlenecks and inefficiencies in a process.
Takt time can be used to set production goals and improve efficiency.
Other types of time used...
Inventory management is the process of overseeing and controlling the flow of goods from manufacturers to warehouses and from these facilities to point of sale.
Inventory management involves tracking inventory levels, ordering and receiving goods, and managing stock levels to ensure optimal levels of inventory.
Effective inventory management can help reduce costs, prevent stockouts, and improve customer satisfaction.
Inve...
I applied via Company Website and was interviewed before Aug 2023. There were 2 interview rounds.
Experienced Lead Consultant with a strong background in project management and client relations.
Over 8 years of experience in consulting roles
Skilled in developing and implementing strategic plans
Proven track record of successfully leading teams to achieve project goals
OEE stands for Overall Equipment Effectiveness, a metric used to measure the efficiency of a manufacturing process.
OEE takes into account three factors: availability, performance, and quality.
It is calculated by multiplying availability, performance, and quality percentages.
For example, if a machine is available 90% of the time, operates at 80% of its maximum speed, and produces good parts 95% of the time, the OEE woul
I applied via LinkedIn and was interviewed before Nov 2020. There were 3 interview rounds.
My core value is integrity. I displayed it visibly last week when I admitted my mistake to my team and took responsibility for it.
Integrity is important to me because it builds trust and credibility.
I always strive to be honest and transparent in my actions and decisions.
Last week, I made a mistake in a project and instead of trying to cover it up, I admitted it to my team and took responsibility for it.
I believe that ...
posted on 9 Nov 2021
I applied via Naukri.com and was interviewed before Nov 2020. There were 3 interview rounds.
Takt time is the rate at which a product must be produced to meet customer demand.
Takt time is calculated by dividing available production time by customer demand.
It helps in determining the pace of production to meet customer demand.
It is used in Lean manufacturing to eliminate waste and improve efficiency.
For example, if a company has 480 minutes of production time and customer demand is 240 units, the takt time woul...
Types of waste include overproduction, waiting, defects, excess processing, excess inventory, unnecessary motion, and unused talent.
Overproduction: producing more than what is needed
Waiting: idle time due to lack of materials, information, or equipment
Defects: errors or mistakes that require rework or scrap
Excess processing: using more resources than necessary to complete a task
Excess inventory: having more inventory t...
based on 1 interview
Interview experience
Testing & Commissioning Engineer
7
salaries
| ₹3 L/yr - ₹5.1 L/yr |
Senior Engineer
6
salaries
| ₹5.3 L/yr - ₹8 L/yr |
MEP Engineer
4
salaries
| ₹0.9 L/yr - ₹4.7 L/yr |
Principal Engineer
4
salaries
| ₹8.8 L/yr - ₹12.8 L/yr |
Assistant General Manager
3
salaries
| ₹16.6 L/yr - ₹23 L/yr |
VISION
Wazir Advisors
TechSci Research
Gemba Concepts