Filter interviews by
Parameters for installation of glass line reactor shaft include material compatibility, proper alignment, secure anchoring, and regular maintenance.
Ensure the shaft material is compatible with the reactor contents to prevent corrosion or contamination.
Properly align the shaft to prevent excessive wear and tear on the equipment.
Securely anchor the shaft to prevent vibrations or misalignment during operation.
Regularly in...
Centrifugal pumps, reciprocating pumps, diaphragm pumps, etc.
Worked with centrifugal pumps for water supply systems
Experience with reciprocating pumps in industrial applications
Familiar with diaphragm pumps for chemical dosing processes
Maintenance in centrifuge includes cleaning, lubricating, inspecting parts, and calibrating.
Regularly clean the centrifuge to remove any debris or residue
Lubricate moving parts to ensure smooth operation
Inspect components such as the rotor, lid, and motor for any signs of wear or damage
Calibrate the centrifuge to ensure accurate results
Perform routine maintenance tasks according to manufacturer's guidelines
Some problems faced in ANF include equipment breakdowns, maintenance challenges, and budget constraints.
Equipment breakdowns can lead to delays in projects and increased costs for repairs.
Maintenance challenges can arise due to the complexity of machinery and the need for specialized skills.
Budget constraints may limit the ability to invest in new equipment or technology upgrades.
Lack of skilled manpower can also be a
Parameters to check for low vacuum in steam jet ejector include steam flow rate, steam pressure, condenser pressure, and air leakage.
Check steam flow rate to ensure it is sufficient for proper operation
Monitor steam pressure to ensure it is at the required level
Check condenser pressure to ensure it is within the acceptable range
Inspect for air leakage in the system, which can cause a decrease in vacuum efficiency
I applied via Recruitment Consulltant and was interviewed in Apr 2024. There was 1 interview round.
It was related with marketing filed. They gave me a hour for presentation. based on the case study, the interview was processed.
I applied via Job Portal and was interviewed in Jun 2023. There were 6 interview rounds.
Finished goods analysis with COA involves verifying the quality of products through Certificate of Analysis.
COA provides detailed information on the composition and quality of finished goods
Analysis includes testing for purity, potency, and contaminants
Results are compared to specifications to ensure product meets quality standards
Body language attitude work to ready for organization
Trouble shooting related instruments and chemical composition related
Trouble shooting related instruments knowledge with column insert
I applied via Newspaper Ad and was interviewed before Jun 2023. There was 1 interview round.
Process safety involves identifying, evaluating, and controlling hazards to prevent accidents in industrial processes.
Process safety focuses on preventing major accidents such as fires, explosions, and toxic releases.
It involves identifying potential hazards, assessing risks, and implementing measures to control and mitigate those risks.
Examples of process safety measures include using safety equipment, conducting regu...
Benzo Chem Industries interview questions for popular designations
I applied via Approached by Company
Yes, I have knowledge of handling hazardous chemicals.
I have received extensive training on the safe handling and storage of hazardous chemicals.
I am familiar with the proper use of personal protective equipment (PPE) when working with hazardous chemicals.
I have experience in conducting risk assessments and implementing control measures to minimize the risks associated with hazardous chemicals.
I am well-versed in the r...
Yes, I am able to take care of production and project safety.
I have experience in implementing safety protocols and procedures in both production and project environments.
I have successfully managed safety programs in previous roles, ensuring compliance with regulations and reducing accidents.
I am knowledgeable about risk assessments, hazard identification, and safety training.
I have worked closely with production and ...
I applied via Campus Placement and was interviewed before Aug 2023. There was 1 interview round.
My name is John Doe.
Full name is John Doe
Commonly known as John
Last name is Doe
I am a dedicated and experienced Technical Coordinator with a strong background in project management and technical support.
Over 5 years of experience in coordinating technical projects
Proficient in project management tools such as Jira and Trello
Skilled in providing technical support to team members and clients
Strong communication and problem-solving skills
Managed successful implementation of new software systems
I applied via Recruitment Consulltant and was interviewed in Aug 2022. There were 2 interview rounds.
I applied via Referral and was interviewed in Dec 2020. There were 2 interview rounds.
I applied via Referral and was interviewed in Jun 2021. There was 1 interview round.
Top trending discussions
based on 11 interviews
Interview experience
based on 116 reviews
Rating in categories
Plant Operator
23
salaries
| ₹0 L/yr - ₹0 L/yr |
Chemist
21
salaries
| ₹0 L/yr - ₹0 L/yr |
Production Chemist
19
salaries
| ₹0 L/yr - ₹0 L/yr |
Production Officer
19
salaries
| ₹0 L/yr - ₹0 L/yr |
Shift Incharge
11
salaries
| ₹0 L/yr - ₹0 L/yr |
Aarti Industries
Vinati Organics
Atul
Navin Fluorine International