BDG Metal & Power
Trivayu Media Works Interview Questions and Answers
Q1. Plans procurement of rolls and roll inventory for on time readiness of rolls to ensure smooth mill operation for achievement of production volume as per production target within delivery deadline each month.
Procurement of rolls and roll inventory is planned to ensure smooth mill operation and achieve production targets within delivery deadlines.
Regularly review production targets and delivery deadlines to determine required roll inventory
Collaborate with suppliers to ensure timely delivery of rolls
Maintain accurate inventory records and track usage to avoid stockouts
Implement a preventive maintenance program to extend roll lifespan
Monitor roll quality to ensure optimal performan...read more
Q2. Implements at least 2 improvement initiatives by involving the team during the financial year.
Implemented initiatives to improve production and maintenance by involving the team.
Conducted regular team meetings to discuss improvement ideas
Implemented a preventive maintenance program to reduce downtime
Introduced a training program to improve technical skills
Encouraged team members to suggest cost-saving measures
Implemented a system to track equipment performance and identify areas for improvement
Q3. How much water require for 130 section billet in primary.
Water requirement for 130 section billet in primary is approximately 1,300 gallons.
Water requirement is directly proportional to the size of the billet.
For a 10 section billet, the water requirement would be 100 gallons.
Therefore, for a 130 section billet, the water requirement would be 1,300 gallons.
Q4. What is matellurgical length for 4/7 CCM.
Metallurgical length for 4/7 CCM refers to the length of the continuous casting machine used in the metallurgical process.
Metallurgical length is the distance traveled by the molten metal during the casting process.
4/7 CCM indicates the ratio of the casting speed to the mold oscillation speed.
Understanding metallurgical length is crucial for optimizing the casting process and ensuring quality of the final product.
Q5. How to control less Sp power in productivity?
To control less Sp power in productivity, focus on optimizing processes, improving equipment efficiency, training employees, and monitoring performance.
Optimize processes to reduce waste and improve efficiency
Improve equipment efficiency through regular maintenance and upgrades
Provide training to employees to enhance their skills and knowledge
Monitor performance regularly to identify areas for improvement
Implement quality control measures to ensure consistent output
Q6. What is dc motor?
A DC motor is a type of electric motor that runs on direct current electricity.
DC motors convert electrical energy into mechanical energy through the interaction of magnetic fields.
They are commonly used in appliances, vehicles, and industrial machinery.
Examples include electric cars, power tools, and ceiling fans.
Q7. What is procurement
Procurement is the process of finding, acquiring, and buying goods, services, or works from an external source.
Involves sourcing and selecting suppliers
Negotiating contracts and prices
Managing supplier relationships
Ensuring timely delivery of goods/services
Strategic procurement focuses on long-term cost savings and supplier development
Top HR Questions asked in Trivayu Media Works
Interview Process at Trivayu Media Works
Top Interview Questions from Similar Companies
Reviews
Interviews
Salaries
Users/Month