I applied via Walk-in and was interviewed in May 2019. There was 1 interview round.
Sequence of operation refers to the order in which tasks are performed to complete a production process.
Sequence of operation is crucial for efficient production.
It involves breaking down the production process into smaller tasks and determining the order in which they should be performed.
For example, in manufacturing a car, the sequence of operation would involve assembling the engine, installing the transmission, att...
posted on 26 Sep 2024
Overall equipment effectiveness (OEE) is a measure of how well a manufacturing process is performing.
OEE is calculated by multiplying availability, performance, and quality rates.
It helps identify areas for improvement in production processes.
Example: If a machine has an availability of 90%, performance of 95%, and quality of 98%, the OEE would be 83.7%.
I applied via Indeed and was interviewed before Jun 2021. There were 2 interview rounds.
posted on 29 Sep 2022
posted on 7 Apr 2022
5S is a methodology for workplace organization and VSM is a tool for process improvement.
5S stands for Sort, Set in Order, Shine, Standardize, and Sustain
5S helps to improve efficiency, safety, and quality in the workplace
VSM stands for Value Stream Mapping
VSM is used to identify and eliminate waste in a process
VSM helps to improve lead time, quality, and cost
Both 5S and VSM are commonly used in Lean manufacturing
I applied via Company Website and was interviewed in Jan 2022. There were 2 interview rounds.
posted on 15 Sep 2023
I applied via Referral and was interviewed before Sep 2022. There were 3 interview rounds.
Related basic knowledge
posted on 16 May 2021
I applied via Company Website and was interviewed in Nov 2020. There were 4 interview rounds.
Kaizen and 3M,7QC are continuous improvement methodologies used in production. Here are some examples.
Kaizen: 5S, Poka-Yoke, Kanban, Andon, Gemba Walk
3M: Muda, Mura, Muri
7QC: Pareto Chart, Fishbone Diagram, Control Chart
based on 1 review
Rating in categories
Asst Store
8
salaries
| ₹1.2 L/yr - ₹3 L/yr |
Project Engineer
6
salaries
| ₹2.6 L/yr - ₹4 L/yr |
Production Engineer
6
salaries
| ₹1.9 L/yr - ₹6.5 L/yr |
Quality Engineer
5
salaries
| ₹2.5 L/yr - ₹3.5 L/yr |
Welding Engineer
5
salaries
| ₹3 L/yr - ₹6.9 L/yr |
BHEL
Thermax Limited
Godrej & Boyce Manufacturing
Tata Projects