Filter interviews by
Taking advance charge means taking responsibility for overseeing and managing a project or task.
Advance charge involves leading a team or group towards a common goal
It requires making decisions, delegating tasks, and ensuring progress is made
Examples include overseeing the installation of electrical systems, managing a team of technicians, and coordinating project timelines
I am willing to work in myState as well as other states depending on the job requirements.
I am open to working in different locations based on the job opportunities available.
I am flexible and willing to travel for work if needed.
I have experience working in multiple states in the past.
I am familiar with the process of relocating for work.
Top trending discussions
I applied via Referral and was interviewed in Nov 2021. There was 1 interview round.
The interview questions cover motor starters, layout, power factor, troubleshooting with megger, and fault finding.
Motor starters are used to control the starting and stopping of motors.
There are different types of motor starters such as direct-on-line, star-delta, and soft starters.
The power layout of starters includes power supply, motor, and control circuit.
The control layout of starters includes start, stop, and ov...
posted on 15 Jan 2025
I applied via AmbitionBox and was interviewed in Dec 2024. There were 5 interview rounds.
A motor is a device that converts electrical energy into mechanical energy to perform work.
Motors are commonly used in various applications such as electric vehicles, industrial machinery, and household appliances.
They come in different types such as AC motors, DC motors, and stepper motors.
Motor capacity refers to its power rating, typically measured in horsepower (HP) or kilowatts (kW).
Higher capacity motors can gene...
DOL (Direct-On-Line) and star delta are two different wiring schemes used in electrical engineering for starting induction motors.
DOL wiring directly connects the motor to the power supply for starting, while star delta wiring initially starts the motor in star configuration and then switches to delta configuration for running.
DOL wiring is simpler and cheaper but causes high starting current, while star delta wiring r...
I applied via Company Website and was interviewed in Apr 2023. There were 2 interview rounds.
Ohm's law states that the current through a conductor between two points is directly proportional to the voltage across the two points.
Ohm's law is represented by the equation I = V/R, where I is the current, V is the voltage, and R is the resistance.
It is named after Georg Simon Ohm, a German physicist who first formulated this law.
This law is applicable to all types of circuits, including DC and AC circuits.
It is use...
posted on 17 Apr 2024
I was interviewed before Apr 2023.
Manage subcontractors and stakeholders by clear communication, setting expectations, regular updates, and addressing concerns promptly.
Establish clear communication channels with subcontractors and stakeholders
Set clear expectations and goals for the project
Provide regular updates on project progress and milestones
Address any concerns or issues promptly to maintain good relationships
Hold regular meetings to discuss pro...
posted on 13 Oct 2022
WTG stands for Wind Turbine Generator. Yaw drive system is responsible for orienting the turbine blades into the wind.
WTG converts wind energy into electrical energy
Yaw drive system rotates the nacelle to face the wind
Yaw drive system consists of yaw motor, yaw brake, and yaw bearing
Yaw motor receives signals from the controller to rotate the nacelle
Yaw brake holds the nacelle in position during maintenance or high win
I applied via Company Website and was interviewed before Aug 2020. There were 5 interview rounds.
The current carrying capacity of conductors varies depending on their material and size.
The current carrying capacity of a conductor is determined by its cross-sectional area.
Conductors with larger cross-sectional areas can carry more current.
The material of the conductor also affects its current carrying capacity.
Copper is a commonly used conductor material with high current carrying capacity.
Aluminum is another condu...
SLD of 132/33kV & 33/11kV substations
SLD stands for Single Line Diagram
132/33kV substation SLD shows the transmission line, transformer, circuit breaker, isolator, etc.
33/11kV substation SLD shows the distribution line, transformer, circuit breaker, isolator, etc.
Field tests required before commissioning of power transformers include insulation resistance test, turns ratio test, and polarity test.
Insulation resistance test is conducted to ensure the insulation system is intact and can withstand the operating voltage.
Turns ratio test is performed to verify the turns ratio of the transformer and ensure it meets the design specifications.
Polarity test is carried out to confirm the...
Finalizing a JMC involves several steps to ensure its accuracy and completeness.
Review and verify all data and calculations
Ensure compliance with all relevant regulations and standards
Obtain necessary approvals and signatures
Prepare final report or documentation
Archive all relevant documents for future reference
Necessary steps before commissioning a substation
Performing insulation resistance tests
Checking the grounding system
Verifying the correct functioning of protection relays
Testing the transformer and circuit breakers
Ensuring proper labeling and documentation
Conducting a thorough safety inspection
posted on 16 Oct 2024
I applied via Company Website and was interviewed in Sep 2024. There was 1 interview round.
To look for a short circuit, check for any abnormal connections or damaged wires causing a direct path for current flow.
Inspect all wiring and connections for signs of damage or wear
Use a multimeter to test for continuity and resistance in the circuit
Look for any burnt or melted components indicating a short circuit
Check for any loose connections or exposed wires that could be causing a short circuit
Project Engineer
52
salaries
| ₹1.7 L/yr - ₹3.5 L/yr |
Customer Support Executive
35
salaries
| ₹1.9 L/yr - ₹3 L/yr |
Data Entry Operator
30
salaries
| ₹1 L/yr - ₹4.5 L/yr |
Project Executive
21
salaries
| ₹2 L/yr - ₹3.3 L/yr |
Customer Service Executive
21
salaries
| ₹2.2 L/yr - ₹4 L/yr |
Tata Power
Adani Power
Reliance Power
NTPC