Five core tools used in production.
1. CNC machines
2. 3D printers
3. Assembly line robots
4. Welding equipment
5. Industrial sewing machines
VSM objective is to identify and eliminate waste in a process.
VSM stands for Value Stream Mapping
It is a lean manufacturing tool used to analyze and improve a process
The objective is to identify and eliminate waste in the process
Waste can be in the form of overproduction, waiting, defects, excess inventory, unnecessary motion, etc.
By eliminating waste, the process becomes more efficient and effective
posted on 20 Jul 2022
I applied via Referral and was interviewed in Jun 2022. There were 4 interview rounds.
A production line on machining work involves the use of machines to perform various tasks in a sequential manner.
Machining work refers to the process of shaping or altering materials using various tools and machines.
A production line on machining work typically involves multiple machines arranged in a specific order to perform different operations.
Each machine in the production line has a specific function, such as cut...
Production line on machining work involves a series of processes to create a finished product.
The production line involves a series of machines and tools to perform different tasks.
Each machine or tool is responsible for a specific process, such as cutting, drilling, or shaping.
The production line is designed to optimize efficiency and minimize waste.
Quality control is an important aspect of the production line to ensu...
A production line for machining work involves a series of machines and processes to create a finished product.
The production line should be designed to optimize efficiency and minimize downtime.
Each machine in the line should be properly maintained and calibrated to ensure accuracy and consistency.
Quality control measures should be in place to catch any defects or errors in the finished product.
Workers should be traine...
I applied via Approached by Company and was interviewed before Jun 2021. There were 2 interview rounds.
Yas
I have 8 years of experience in the field of engineering.
I have worked in various engineering roles for 8 years
I have experience in project management, design, and implementation
I have successfully completed multiple engineering projects
I have received positive feedback and recognition for my work
posted on 9 Nov 2024
I applied via Approached by Company and was interviewed in Oct 2024. There was 1 interview round.
posted on 14 Nov 2024
Cycle time is the total time taken to complete a process or task from start to finish.
Cycle time is a key metric in process improvement and efficiency analysis.
It helps in identifying bottlenecks and areas for improvement in a process.
For example, in manufacturing, cycle time can refer to the time taken to produce one unit of a product.
Reducing cycle time can lead to increased productivity and cost savings.
Line balancing is the process of assigning tasks to workstations in a way that evens out the workload and maximizes efficiency.
Involves distributing work evenly among workstations
Helps in reducing idle time and bottlenecks
Improves productivity and efficiency
Example: In a manufacturing plant, line balancing ensures each workstation has a similar amount of work to do
posted on 18 Nov 2024
posted on 1 Apr 2024
I applied via Recruitment Consulltant and was interviewed in Oct 2023. There were 2 interview rounds.
Identify root cause, analyze impact, propose solutions, test solutions, implement changes
Identify the root cause of the random problem by analyzing existing parameters
Analyze the impact of the problem on the system or project
Propose potential solutions to address the random problem
Test the proposed solutions to ensure effectiveness
Implement changes based on the tested solutions
Monitor the system to ensure the random pr
When sudden rejection goes higher how you handle situation
posted on 9 Oct 2023
I applied via Referral and was interviewed before Oct 2022. There was 1 interview round.
based on 1 review
Rating in categories
Junior Engineer
32
salaries
| ₹2 L/yr - ₹4.9 L/yr |
Oprating Engineer
27
salaries
| ₹1.5 L/yr - ₹3.5 L/yr |
Graduate Engineer Trainee (Get)
19
salaries
| ₹1.2 L/yr - ₹3.8 L/yr |
Assistant Engineer
18
salaries
| ₹2.2 L/yr - ₹5.5 L/yr |
Trainee Operating Engineer
16
salaries
| ₹1.5 L/yr - ₹2 L/yr |
Bharat Forge
Sundaram Clayton
ZF Steering Gear
ZF Commercial Vehicle Control Systems