Napino Auto & Electronics Interview Questions and Answers

Updated 5 Feb 2024

Q1. What is the lap length of steel in tension zone & compression zone

Ans.

Lap length of steel in tension zone is 50 times the diameter of the bar, while in compression zone it is 40 times.

  • Lap length is the length of overlap between two bars in a reinforced concrete structure.

  • In tension zone, the lap length is longer to ensure proper transfer of stress from one bar to another.

  • In compression zone, the lap length is shorter as the bars are not subjected to as much stress.

  • For example, if the diameter of the bar is 10mm, the lap length in tension zone w...read more

View 6 more answers

Q2. What is the test of fine aggregate

Ans.

The test of fine aggregate is conducted to determine its quality and suitability for use in construction.

  • The test of fine aggregate includes tests for grading, particle shape, specific gravity, water absorption, and moisture content.

  • Grading test determines the particle size distribution of the aggregate.

  • Particle shape test assesses the shape and texture of the particles.

  • Specific gravity test measures the density of the aggregate compared to the density of water.

  • Water absorpti...read more

View 1 answer

Q3. What is the test of aggregate

Ans.

Tests conducted on aggregates to determine their quality and suitability for use in construction.

  • Gradation test to determine particle size distribution

  • Abrasion test to determine resistance to wear and tear

  • Impact test to determine toughness and resistance to impact

  • Soundness test to determine resistance to weathering

  • Specific gravity and water absorption test to determine density and porosity

Add your answer

Q4. Workability of concrete

Ans.

Workability of concrete refers to its ease of mixing, placing, and compacting.

  • Workability is affected by factors such as water-cement ratio, aggregate size and shape, and admixtures.

  • Concrete with good workability is easier to handle and results in a smoother finish.

  • Workability can be measured using tests such as slump test, flow test, and compacting factor test.

  • Low workability can lead to problems such as segregation and honeycombing.

  • Workability requirements vary depending on...read more

Add your answer
Discover Napino Auto & Electronics interview dos and don'ts from real experiences

Q5. Process of tiles laying

Ans.

The process of tiles laying involves preparation of surface, marking layout, applying adhesive, laying tiles and grouting.

  • Surface preparation involves cleaning and leveling the surface.

  • Layout is marked using chalk lines or laser levels.

  • Adhesive is applied using a notched trowel.

  • Tiles are laid starting from the center and working outwards.

  • Grouting is done after the adhesive has dried.

  • Different types of tiles require different laying techniques.

  • Tiles should be allowed to set fo...read more

Add your answer

Q6. Process of internal painting

Ans.

Internal painting process involves surface preparation, primer application, and topcoat application.

  • Surface preparation involves cleaning, sanding, and filling any cracks or holes.

  • Primer application helps to improve adhesion and durability of the paint.

  • Topcoat application is done after the primer has dried and provides the final color and finish.

  • The type of paint and application method used depends on the surface being painted and the desired outcome.

  • Proper ventilation and sa...read more

Add your answer

Q7. Process of internal plaster

Ans.

Internal plaster is the process of applying a layer of plaster on the interior walls and ceilings of a building.

  • The surface to be plastered should be clean and free from dust and debris.

  • A mixture of cement, sand, and water is prepared in the ratio of 1:4:5.

  • The mixture is then applied to the surface using a trowel and leveled.

  • The plaster is left to dry for a few days before it is painted or finished with a decorative coating.

  • The thickness of the plaster layer should be between...read more

Add your answer

Q8. Process of external plaster

Ans.

External plaster is a process of applying a layer of cement mortar on the external walls of a building.

  • The surface to be plastered is cleaned and made free of dust and debris.

  • A mixture of cement, sand, and water is prepared in the required ratio.

  • The mixture is applied on the wall surface using a trowel.

  • The plaster is then leveled and smoothened using a wooden float.

  • The plaster is left to dry for a few days before painting or finishing.

  • The thickness of the plaster layer depend...read more

Add your answer
Contribute & help others!
Write a review
Share interview
Contribute salary
Add office photos
Interview Tips & Stories
Ace your next interview with expert advice and inspiring stories

Top Civil Engineer Interview Questions from Similar Companies

4.0
 • 20 Interview Questions
3.8
 • 12 Interview Questions
4.1
 • 12 Interview Questions
View all
Share an Interview
Stay ahead in your career. Get AmbitionBox app
qr-code
Helping over 1 Crore job seekers every month in choosing their right fit company
70 Lakh+

Reviews

5 Lakh+

Interviews

4 Crore+

Salaries

1 Cr+

Users/Month

Contribute to help millions
Get AmbitionBox app

Made with ❤️ in India. Trademarks belong to their respective owners. All rights reserved © 2024 Info Edge (India) Ltd.

Follow us
  • Youtube
  • Instagram
  • LinkedIn
  • Facebook
  • Twitter