Upload Button Icon Add office photos

Atul Auto

Compare button icon Compare button icon Compare

Filter interviews by

Atul Auto Supplier Quality Assurance Engineer Interview Questions and Answers

Updated 1 Apr 2024

Atul Auto Supplier Quality Assurance Engineer Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-

Interview Questionnaire 

2 Questions

  • Q1. Strong your technical
  • Q2. Your background automobile industry

Interview questions from similar companies

I applied via Recruitment Consulltant and was interviewed before Feb 2021. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Open pump house and Tunnels
  • Q2. Road and

Interview Preparation Tips

Interview preparation tips for other job seekers - Navayaga engineering company Ltd

I applied via Recruitment Consulltant and was interviewed before Feb 2021. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Open pump house and Tunnels
  • Q2. Road and

Interview Preparation Tips

Interview preparation tips for other job seekers - Navayaga engineering company Ltd

I applied via Campus Placement and was interviewed before Jul 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. Basics about the education and knowledge

Interview Preparation Tips

Interview preparation tips for other job seekers - They hire in rnd very easily ...not a big task..

I applied via Naukri.com and was interviewed before Jul 2020. There were 5 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. How can you satisfy your job
  • Q2. With hardwork and my experience

Interview Preparation Tips

Interview preparation tips for other job seekers - Wor
Interview experience
3
Average
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Jun 2023. There was 1 interview round.

Round 1 - Case Study 

What are the projects done by you in your current company

Interview Preparation Tips

Interview preparation tips for other job seekers - Do well
Interview experience
1
Bad
Difficulty level
Easy
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Dec 2022. There were 3 interview rounds.

Round 1 - HR 

(2 Questions)

  • Q1. What is your Experience
  • Q2. What is your expected CTC
  • Ans. 

    My expected CTC is in line with industry standards for a Sr. Engineer role.

    • Research industry standards for Sr. Engineer roles in the current market

    • Consider my years of experience, skills, and qualifications when determining my expected CTC

    • Be open to negotiation based on the overall compensation package offered

  • Answered by AI
Round 2 - Technical 

(2 Questions)

  • Q1. Make Star-Delta electrical wiring diagram.
  • Ans. 

    Star-Delta wiring diagram involves connecting a motor in two different configurations for starting and running.

    • Star connection involves connecting all three terminals of the motor windings together to form a star shape.

    • Delta connection involves connecting the terminals in a triangular shape.

    • Switching between star and delta configurations is done using a special motor starter.

    • Star-Delta wiring is commonly used for reduc...

  • Answered by AI
  • Q2. Make star-delta ladder logic.
  • Ans. 

    Star-delta ladder logic is used to control the starting method of a three-phase induction motor.

    • Use two sets of contactors to switch between star and delta connections.

    • Implement a timer to delay the transition from star to delta.

    • Include overload protection for the motor.

    • Ensure proper interlocking to prevent simultaneous connection of star and delta.

    • Test the ladder logic thoroughly before implementation.

  • Answered by AI
Round 3 - Disscussion Round withPlant Head 

(1 Question)

  • Q1. Energy Saving questions.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident about your technical skills.
Interview experience
4
Good
Difficulty level
Easy
Process Duration
More than 8 weeks
Result
Selected Selected

I was interviewed before Jan 2024.

Round 1 - HR 

(2 Questions)

  • Q1. How many last ctc
  • Ans. 

    The question is asking about the candidate's last drawn salary (CTC).

    • CTC stands for Cost to Company and refers to the total salary package of an employee including all benefits and perks.

    • The candidate should provide the exact amount or range of their last drawn CTC.

    • It is important to be honest and transparent about the last CTC to negotiate effectively for the new role.

  • Answered by AI
  • Q2. Your CTC pakage

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare before technical interview
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed before Feb 2023. There were 3 interview rounds.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Why Are you changing Current Company??
  • Q2. Why you want to join Uno Minda?
Round 2 - Technical 

(2 Questions)

  • Q1. What is your KRA and job Role?
  • Q2. Have you Audit Supplier as well as Vendor Visit?
  • Ans. 

    Yes

    • Yes, I have audited suppliers and conducted vendor visits.

    • During my previous role as a Senior Engineer, I was responsible for auditing suppliers to ensure compliance with quality standards and specifications.

    • I have also conducted vendor visits to assess their capabilities, production processes, and quality control measures.

    • These audits and visits helped in identifying potential risks, improving supplier performance,...

  • Answered by AI
Round 3 - HR 

(2 Questions)

  • Q1. What is your future Goals?
  • Q2. Can you join us by Tomarrow?
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Dec 2023. There was 1 interview round.

Round 1 - One-on-one 

(2 Questions)

  • Q1. Line Balancing questions
  • Q2. TQM,lean manufacturing

Interview Preparation Tips

Interview preparation tips for other job seekers - Good Culture

Tell us how to improve this page.

Atul Auto Supplier Quality Assurance Engineer Interview Process

based on 2 interviews

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

Tata Motors Interview Questions
4.2
 • 995 Interviews
Maruti Suzuki Interview Questions
4.2
 • 586 Interviews
Hero MotoCorp Interview Questions
4.1
 • 333 Interviews
TVS Motor Interview Questions
4.0
 • 312 Interviews
Bajaj Auto Interview Questions
3.9
 • 267 Interviews
Ashok Leyland Interview Questions
4.1
 • 239 Interviews
UNO Minda Interview Questions
4.0
 • 169 Interviews
Ford Motor Interview Questions
4.4
 • 145 Interviews
View all
Engineer
66 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Manager
61 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Senior Engineer
30 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Deputy Manager
29 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Service Engineer
28 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Atul Auto with

Bajaj Auto

3.9
Compare

TVS Motor

4.0
Compare

Hero MotoCorp

4.1
Compare

Mahindra & Mahindra

4.1
Compare
Did you find this page helpful?
Yes No
write
Share an Interview