Filter interviews by
I applied via Referral and was interviewed before Sep 2021. There were 2 interview rounds.
I applied via Referral and was interviewed before Jan 2020. There were 4 interview rounds.
Processes required in any project include planning, execution, monitoring, and closing.
Planning involves defining project goals, scope, and resources.
Execution involves carrying out the plan and completing project tasks.
Monitoring involves tracking progress and making adjustments as needed.
Closing involves wrapping up the project and evaluating its success.
Examples of project processes include risk management, quality
Points to check in an invoice before processing
Check for accuracy of billing information
Verify the amount charged and ensure it matches the agreed upon price
Ensure all necessary supporting documents are attached
Check for any discounts or promotions that may apply
Verify the payment terms and due date
Ensure the invoice is addressed to the correct recipient
Check for any errors or discrepancies
I applied via Naukri.com
I applied via Walk-in and was interviewed before Mar 2021. There were 2 interview rounds.
I applied via Company Website
TTR stands for Total Thickness Range and is required for powder coating process to ensure proper adhesion and durability.
TTR is the range of thickness of the substrate and any coatings applied to it
It is important for powder coating as it ensures proper adhesion and durability
If the TTR is too large, the coating may not adhere properly or may crack and peel over time
Examples of substrates with varying TTR include alumi
Detection and prevention poka-yoke refers to the use of techniques to identify and prevent errors in a process.
Poka-yoke is a Japanese term for mistake-proofing
Detection poka-yoke involves identifying errors as they occur
Prevention poka-yoke involves designing processes to prevent errors from occurring
Examples of poka-yoke include using checklists, color-coding, and physical barriers
Poka-yoke can improve quality, reduc
Decrease in pH can occur due to various factors in conversion coating.
Decrease in pH can be caused by the addition of an acid or acidic solution.
Presence of reactive metals in the coating can lead to a decrease in pH.
Contamination by organic materials or impurities can also lower the pH.
Chemical reactions during the conversion coating process may result in pH decrease.
Examples of conversion coatings include phosphating
To prepare 0.1 N H2SO4 & NaOH, calculate the required amount of solute and dissolve it in distilled water.
Calculate the molar mass of H2SO4 and NaOH
Determine the required amount of solute using the formula: N = (W/M) x (1000/V)
Dissolve the calculated amount of solute in distilled water to make 1 liter of solution
Standardize the solution using a primary standard
Use a burette to measure the volume of solution needed for
To cross verify 0.1 normality H2SO4, use a standard solution of NaOH and an indicator.
Prepare a standard solution of NaOH of known concentration.
Add a few drops of an indicator such as phenolphthalein to the H2SO4 solution.
Titrate the H2SO4 solution with the NaOH solution until the endpoint is reached.
The endpoint is when the indicator changes color, indicating that all the H2SO4 has reacted with the NaOH.
Calculate the...
Prepare a pH buffer solution as per defined standard in tablet.
Determine the required pH value and buffer capacity
Select the appropriate buffer system and calculate the required amounts of buffer components
Dissolve the buffer components in water and adjust the pH as necessary
Check the pH and adjust if necessary
Filter the solution and store in a clean container
Use a calibrated pH meter to verify the pH of the solution
I applied via Campus Placement and was interviewed in Feb 2021. There were 5 interview rounds.
I applied via Campus Placement and was interviewed before Jun 2021. There were 5 interview rounds.
Aptitude test is for the Campus Recruitment.
based on 1 interview
Interview experience
based on 2 reviews
Rating in categories
Engineer
65
salaries
| ₹1.8 L/yr - ₹5 L/yr |
Assistant Manager
61
salaries
| ₹4.4 L/yr - ₹8.5 L/yr |
Senior Engineer
30
salaries
| ₹2.5 L/yr - ₹6.5 L/yr |
Deputy Manager
29
salaries
| ₹7.5 L/yr - ₹14 L/yr |
Service Engineer
26
salaries
| ₹3.2 L/yr - ₹6.8 L/yr |
Bajaj Auto
TVS Motor
Hero MotoCorp
Mahindra & Mahindra