i
Atlas Copco
Filter interviews by
Be the first one to contribute and help others!
posted on 6 Jun 2022
I applied via Naukri.com and was interviewed in Dec 2021. There were 3 interview rounds.
posted on 2 Oct 2021
I applied via Naukri.com and was interviewed in Sep 2021. There were 3 interview rounds.
posted on 1 Mar 2025
About sales and personal info
I applied via Approached by Company and was interviewed in Oct 2021. There were 3 interview rounds.
Limit state method considers the ultimate load capacity of the structure while working stress method considers the permissible stress limit.
Limit state method is a modern approach while working stress method is an older approach.
Limit state method considers the safety of the structure against ultimate failure while working stress method considers the safety of the structure against yielding.
Limit state method uses part...
Cracked concrete refers to concrete that has developed cracks due to various reasons.
Cracks in concrete can be caused by shrinkage, settlement, or overload.
Cracks can also be caused by temperature changes, chemical reactions, or poor construction practices.
Cracked concrete can lead to structural problems and should be repaired as soon as possible.
Repair methods for cracked concrete include epoxy injection, concrete ove...
India has four seismic zones based on the intensity of earthquakes and their frequency.
India is divided into four seismic zones - Zone 2, 3, 4, and 5
Zone 5 is the most seismically active region, while Zone 2 is the least active
The seismic zones are based on the intensity of earthquakes and their frequency
The zones help in designing earthquake-resistant structures and disaster management plans
Specifications are provided by structural consultants to contractors to ensure that the construction meets the required standards.
Structural consultants provide detailed specifications for the construction project.
These specifications include information on materials, dimensions, and quality standards.
Contractors use these specifications to ensure that the construction meets the required standards.
The specifications al...
Developers and PMCs have significant influence on a project's outcome and site development.
Developers can influence the design and functionality of the site through their expertise and experience.
PMCs can influence the project's timeline, budget, and quality through their management and oversight.
Both can influence the site's overall success by ensuring proper planning, communication, and execution.
For example, a devel...
I prefer not to disclose my current CTC. As for my expected salary, it would depend on the job responsibilities and market standards.
I am not comfortable sharing my current CTC as it is confidential information.
My expected salary would be based on the job responsibilities, company culture, and market standards.
I am open to negotiation and would like to discuss the compensation package in detail.
I am more interested in ...
I appeared for an interview before Feb 2023.
I applied via Campus Placement and was interviewed before Feb 2023. There were 2 interview rounds.
The questions cover topics related to turbochargers, IC engines, engine parts, manufacturing processes, management skills, and interpersonal communication.
Turbocharger is a device that increases the efficiency and power output of an engine by forcing extra air into the combustion chamber.
IC engine works on the principle of internal combustion where fuel is burned inside the engine to produce power.
CI engine stands for ...
posted on 26 Jun 2024
Learn basics and try to solve problems
I applied via Company Website and was interviewed in Oct 2021. There was 1 interview round.
Motor and panel switchgear erection in oil and gas field
Experience in installation and maintenance of motor and panel switchgear in oil and gas field
Knowledge of safety regulations and procedures in hazardous environments
Ability to read and interpret technical drawings and schematics
Familiarity with testing and commissioning procedures
Experience in troubleshooting and resolving electrical issues
Examples: installation o...
Date of completion refers to the deadline or expected date of finishing a project or task.
It is important to set a realistic date of completion to ensure timely delivery of projects.
Factors such as available resources, team capacity, and project complexity should be considered when setting the date of completion.
Regular monitoring and tracking of progress can help ensure that the project is on track to meet the date of...
I applied via Naukri.com
Prepare for topics on current events, government regulations, corporate trends
Prepare for Management case study on complex problems, strategic issues
based on 2 reviews
Rating in categories
Design Engineer
279
salaries
| ₹2.4 L/yr - ₹12 L/yr |
Service Engineer
225
salaries
| ₹1.8 L/yr - ₹10 L/yr |
Senior Design Engineer
206
salaries
| ₹5.8 L/yr - ₹15.5 L/yr |
Project Engineer
182
salaries
| ₹6 L/yr - ₹15 L/yr |
Senior Service Engineer
102
salaries
| ₹4.5 L/yr - ₹14 L/yr |
Cummins
ABB
Tractors and Farm Equipment
KONE