Filter interviews by
CTC requirements depend on the job position and experience level.
CTC stands for Cost to Company and includes all the expenses incurred by the company for an employee.
The CTC requirements vary based on the job position, experience level, and industry standards.
The CTC may include components like basic salary, allowances, bonuses, and benefits.
For example, a junior operator may have a CTC requirement of INR 3-4 lakhs per...
I applied via Approached by Company and was interviewed in Aug 2024. There was 1 interview round.
I applied via Campus Placement
Easy and basics question
Star delta starter diagram is used to start induction motors with reduced starting current.
Star delta starter is used for starting induction motors in industries to reduce the starting current.
It consists of a star contactor and a delta contactor which are connected in a specific sequence.
During starting, the motor is connected in star configuration to reduce the starting current, then switched to delta configuration f...
I applied via Campus Placement
posted on 20 Jun 2024
Employee handling discussion and manpower handling discussion process
Short loop quality refers to the quality of a loop that is short in length.
Short loop quality is important for minimizing signal loss and interference.
It is crucial for maintaining data integrity and transmission speed.
Examples include short loop quality in Ethernet cables for faster internet speeds.
Quality issues can be analyzed by identifying root causes, collecting data, using quality tools, and implementing corrective actions.
Identify the root cause of the quality issue by using tools like fishbone diagram or 5 Whys.
Collect data related to the quality issue such as defect rates, customer complaints, and process metrics.
Use quality tools like Pareto analysis, control charts, and histograms to analyze the data a...
I applied via Company Website and was interviewed in Sep 2023. There was 1 interview round.
I applied via Company Website and was interviewed before May 2023. There was 1 interview round.
I applied via Approached by Company and was interviewed in Dec 2022. There were 4 interview rounds.
General science and technical aptitude MCQ questions.
Lean Six Sigma is a methodology that combines Lean manufacturing principles and Six Sigma quality management techniques to improve processes and eliminate waste.
Combines Lean principles (focus on efficiency and waste reduction) with Six Sigma techniques (focus on quality and process improvement)
Uses tools like DMAIC (Define, Measure, Analyze, Improve, Control) to identify and solve problems
Aims to reduce defects, impro...
Tooling refers to the process of designing and manufacturing tools or equipment used in production or manufacturing processes.
Tooling involves creating specialized tools or equipment for specific tasks
It can include designing, prototyping, and manufacturing tools
Tooling is essential for efficient and accurate production processes
Examples include molds for injection molding, jigs for welding, and fixtures for assembly
Indexing is the process of creating an index for a database table to improve the speed of data retrieval operations.
Indexing helps in quickly locating and accessing specific rows in a table.
It reduces the number of disk I/O operations required for query processing.
Examples of indexing methods include B-tree, hash, and bitmap indexes.
I applied via Company Website and was interviewed in Dec 2022. There were 2 interview rounds.
The braking system is a mechanism that allows a vehicle to slow down or stop by converting kinetic energy into heat.
The braking system typically consists of components such as brake pads, brake calipers, brake rotors, and brake fluid.
There are two main types of braking systems: drum brakes and disc brakes.
Drum brakes use brake shoes that press against the inside of a drum to create friction and slow down the vehicle.
Di...
I applied via Naukri.com and was interviewed in Jul 2022. There were 4 interview rounds.
Maximum in the output in campus ®ular work
Interview timeing Kazan work in the system
Deputy Manager
1.2k
salaries
| ₹6.2 L/yr - ₹18.1 L/yr |
Assistant Manager
1.1k
salaries
| ₹4.4 L/yr - ₹12 L/yr |
Senior Officer
539
salaries
| ₹3.1 L/yr - ₹8 L/yr |
Quality Inspector
476
salaries
| ₹1 L/yr - ₹3.2 L/yr |
Quality Engineer
396
salaries
| ₹1.1 L/yr - ₹4.2 L/yr |
Tata Motors
Mahindra & Mahindra
Bharat Forge
Eicher Motors