Q1. Shuttering check by PMC with whitnesse then concrete pour
Shuttering check by PMC with witnesses before concrete pour.
PMC (Project Management Consultant) conducts a shuttering check before concrete pour.
Witnesses are present during the shuttering check to ensure compliance.
Shuttering check involves inspecting the formwork or molds used to shape the concrete.
The purpose is to ensure that the formwork is properly constructed and aligned.
This helps prevent any issues or defects in the final concrete structure.
Q2. Soil compaction test report submitted by PMC
Soil compaction test report is a document submitted by PMC to assess the density and moisture content of soil.
The report includes details of the test method used, such as Proctor test or California Bearing Ratio (CBR) test.
It provides information about the compaction equipment used, such as a vibratory roller or a plate compactor.
The report presents the results of the test, including the dry density, moisture content, and compaction curve.
It may include recommendations for ac...read more
Q3. Daily concrete cube testing whiteness by PMC
Daily concrete cube testing whiteness by PMC
PMC stands for Project Management Consultant
Concrete cube testing is a common practice in construction projects
Whiteness testing is done to assess the quality and consistency of the concrete mix
Daily testing ensures that the concrete meets the required standards
PMC oversees the testing process to ensure compliance with project specifications
Q4. Daily safety report submitted by PMC
The daily safety report submitted by PMC is a crucial document that provides an overview of safety measures and incidents on a daily basis.
The daily safety report helps in monitoring and improving safety practices on the project site.
It includes information about any accidents, near misses, or safety violations that occurred during the day.
The report also highlights the corrective actions taken to address the identified safety issues.
It may contain details about safety inspec...read more
Q5. Site conditions as per planning
The site conditions as per planning refer to the specific conditions and requirements outlined in the project plan.
Site conditions as per planning include factors such as topography, soil conditions, and environmental considerations.
These conditions are taken into account during the planning phase to ensure the feasibility and success of the project.
For example, if the site is located in a flood-prone area, the planning may include measures to mitigate the risk of flooding.
Si...read more
Q6. Tmt steel Bbs as per drawing
TMT steel BBS refers to the reinforcement bar bending schedule as per the drawing.
TMT steel BBS is a detailed document that specifies the quantity, shape, and dimensions of reinforcement bars required for a construction project.
It helps in accurately placing and bending the reinforcement bars as per the design.
The BBS includes information such as bar mark, bar size, length, shape, and bending details.
It ensures the structural integrity and strength of the building or structur...read more