Filter interviews by
Top trending discussions
I applied via Naukri.com and was interviewed before Jun 2020. There were 2 interview rounds.
I applied via Referral and was interviewed before Mar 2023. There was 1 interview round.
Mivan formwork is a construction technique that uses aluminum formwork system for casting concrete structures.
Mivan formwork involves setting up aluminum formwork panels, fixing reinforcement bars, pouring concrete, and removing the formwork after the concrete has set.
It is a fast and efficient construction method commonly used for high-rise buildings and large residential projects.
The system allows for smooth finishes...
posted on 30 Jun 2024
posted on 12 Nov 2024
I applied via Referral and was interviewed before Nov 2023. There was 1 interview round.
posted on 22 Dec 2024
The output voltage of an AAAC Rabbit conductor is typically around 600 volts.
The output voltage of an AAAC Rabbit conductor is usually around 600 volts.
The exact output voltage may vary depending on the specific application and conditions.
It is important to consult the manufacturer's specifications for accurate information.
My execution work plan involves setting clear goals, creating a timeline, assigning tasks, monitoring progress, and adjusting as needed.
Set clear goals and objectives for the project
Create a detailed timeline with milestones and deadlines
Assign tasks to team members based on their strengths and expertise
Regularly monitor progress and make adjustments as needed
Communicate effectively with team members and stakeholders
Ut...
I applied via Walk-in and was interviewed in May 2022. There were 2 interview rounds.
Construction material and techniques
Construction labour management
Site work
The thickness of compreg ply varies depending on its intended use and application. Its size can also vary depending on the manufacturer and customer requirements.
The thickness of compreg ply can range from 3mm to 25mm or more
The size of compreg ply can vary from 4ft x 8ft to 5ft x 10ft or more
The thickness and size of compreg ply can be customized based on the specific requirements of the project
Compreg ply is commonly...
The maximum repetition of ply shuttering depends on various factors such as quality of ply, weather conditions, and type of concrete.
The maximum repetition of ply shuttering can range from 5 to 20 times depending on the above factors.
If the quality of ply is good and weather conditions are favorable, the ply shuttering can be reused more number of times.
However, if the concrete mix is harsh or the weather conditions ar...
The consumption of shuttering oil per liter depends on the area covered.
The consumption of shuttering oil per liter can vary depending on factors such as the type of shuttering material, surface texture, and weather conditions.
On average, 1 liter of shuttering oil can cover approximately 10-15 square meters of surface area.
However, this can vary significantly based on the absorbency of the surface and the thickness of ...
The elongation % of fe550 steel varies depending on the specific grade and manufacturing process.
The elongation % of fe550 steel can range from 14% to 20%.
It is important to refer to the specifications provided by the manufacturer for accurate information.
The elongation % indicates the ability of the steel to deform before breaking under tension.
Fe550 steel is commonly used in construction and reinforcement application
Rolling margin of steel is the difference between the target thickness and the actual thickness after rolling.
Rolling margin is a measure of the accuracy of the rolling process.
It is calculated by subtracting the actual thickness of the steel after rolling from the target thickness.
A positive rolling margin means the steel is thicker than intended, while a negative rolling margin means it is thinner.
Rolling margin is i...
based on 3 reviews
Rating in categories
Civil Engineer
34
salaries
| ₹2.2 L/yr - ₹7.8 L/yr |
Safety Officer
26
salaries
| ₹3 L/yr - ₹5.4 L/yr |
Junior Engineer
22
salaries
| ₹2.4 L/yr - ₹4.8 L/yr |
Process Coordinator
20
salaries
| ₹1 L/yr - ₹2.5 L/yr |
Civil Site Engineer
14
salaries
| ₹3.6 L/yr - ₹7 L/yr |
Lea Associates South Asia
McNally Bharat Engineering
R.V.R. PROJECTS
ABCI Infrastructures